Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.

Similar presentations


Presentation on theme: "Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013."— Presentation transcript:

1 Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013

2 2 FY13 run Nimble scheduling for FY13 run was a necessity SAREC meeting, July 25, 2013, V. Yakimenko 5 months long commissioning/running Four beam configurations (some uncertainty in time to develop) Configurations were progressively more difficult Uncertain schedule for commissioning of the ionization laser Weeks

3 3 Beam time delivery by configuration Users requests and justifications will set time allocation for FY14 run SAREC meeting, July 25, 2013, V. Yakimenko

4 4 FY13 Run Time Distribution (total 3616 hrs.) Smaller fraction of “Scheduled off” (mainly laser installation) and “Machine studies” are expected in next run. Accelerator availability was ~85%. SAREC meeting, July 25, 2013, V. Yakimenko

5 5 Planning for FY14 run FY14 is expected to have much more user experimental time. Efficient use will be main challenge Two part run is planned for FY14: Sept.30-Dec.20: Two bunch PWFA in 1.5m oven, positrons testing Feb.2-Jun.30: Beam time shared between ~12 experiments LCLS II construction schedule is not finalized Weeks SAREC meeting, July 25, 2013, V. Yakimenko

6 Norbert Holtkamp, AD Director Robert Hettel, Deputy John Seeman, Deputy ESH/QA John Seabury Administrative Office Business Office Cindy Lowe Accelerator Operations & Safety R. Erickson Mechanical Eng. & Technical Support K. Fant Instrumen- tation & Controls T. Himel Accelerator Systems Division A. Brachmann RF Accelerator Research & Eng. Division M. Fazio Accelerator Research Division R. Hettel (acting) S0-20 Accelerator Laser Support Facilities & Rad. Physics 6 AD Organizational chart (FY13 restructuring) FACET Division V. Yakimenko FY13 restructuring of S0-20 Linac operations resulted in efficient FACET run SAREC meeting, July 25, 2013, V. Yakimenko

7 7 FACET and Test facilities division (FY14 restructuring) FACET and Test Facilities V. Yakimenko M. Hogan, Deputy Experimental Program M. Hogan Science at FACET M. Hogan Science at NLCTA E. Hemsing Science at ESTB C. Hast Science at ASTA TBD Test Facilities C. Hast User Coordination C. Clarke SLAC User Office C. Knotts FACET/ESTB User area C. Hast NLCTA/ASTA Operations TBD Technical Support TBD Controls TBD Linac Operations M. Sullivan Lasers B. White External Program Review Committee (SAREC) Safety J. Kenny Matrixed SAREC meeting, July 25, 2013, V. Yakimenko

8 8 Program Advisory Committee & User meetings Updates from six experiments that did use beam time in FY13 is expected. 12 new proposals are submitted in addition to already ongoing programs: 8 for FACET (one will be first tried at ESTB and one at NLCTA) 3 for NLCTA 1 for ASTA Detector R&D experiments at ESTB are reviewed by separate committee FACET time is oversubscribed SAREC meeting, July 25, 2013, V. Yakimenko

9 9 Charge to the Program Advisory Committee Evaluate the scientific merit and rate the technical risk of the NEW proposals for the SLAC Accelerator Test Facilities. Determine whether the new proposals would be appropriate at this time or in the future. Review existing R&D results at the SLAC Accelerator Test Facilities and which elements need further in-depth analysis (for example): Is the science unique and is the progress compelling? Is the program making effective use of facility and lab resources? Could the program be enhanced by expanding the collaboration? Comment on the synergy of the programs within and between the facilities. Are there opportunities SLAC should pursue? What would be needed to successfully realize these opportunities? SAREC meeting, July 25, 2013, V. Yakimenko

10 10 Schedule

11 11 Schedule SAREC meeting, July 25, 2013, V. Yakimenko