Presentation is loading. Please wait.

Presentation is loading. Please wait.

EMERGE Tech Agenda Oct 7, 1999 10:30-11Vision (Applications focus) (TD) 11-12:30Describe GARA + Test Results (VS) 12:30-1:30Lunch 1:30-2:15GARNET demo.

Similar presentations


Presentation on theme: "EMERGE Tech Agenda Oct 7, 1999 10:30-11Vision (Applications focus) (TD) 11-12:30Describe GARA + Test Results (VS) 12:30-1:30Lunch 1:30-2:15GARNET demo."— Presentation transcript:

1 EMERGE Tech Agenda Oct 7, 1999 10:30-11Vision (Applications focus) (TD) 11-12:30Describe GARA + Test Results (VS) 12:30-1:30Lunch 1:30-2:15GARNET demo (VS) 2:15-5Develop technical plan (LW) Define infrastructure (L2, L3, RM) Software Schedule Status Testing Measurement

2 LBNL Sandia(CA) ANL Univ of Wisc 2 End Users (Workstation) HPSS High End Graphics DPSS End Users (Workstation) HPSS High End Graphics DPSS Multiple End Users 2 End Users (Workstation) LANL NCAR LLNL HPSS Local Analysis Clients O2KRAID * * * O O O SLAC CIT BNL CBAF SDSC * * Princeton FNAL O UIUCNWU O O * Abilene O O - R/T * - Bandwidth Utah Earth Grid Particle Physics Combustion Corridor Corridor One IU XRay Crystal. *

3 DOE/NGI Testbed Sites ESnetAbileneMREN

4 Planned DOE/NGI Testbed Capabilities Allocate bandwidth out of production ESnet service (30% of access link; 45-90 Mbps per site) MREN sites determine bandwidth allocation Testbed will carry Best Effort + Premium traffic Resource control/allocation/scheduling Provide instrumentation assistance for applications to drive toward adaptive applications

5 DOE/NGI Testbed Implementation Site/edge routers will mark Premium Service flows Sites will ensure Premium Service to end systems ESnet & Abilene routers will police at ingress ESnet & Abilene will set PHB as needed Goal to ease manual configuration burden Goal persistent testbed infrastructure

6 8 sites require 28 p2p links L2 Infrastructure Full PVC mesh Bandwidth ?

7 L3 Infrastructure ANL Class C point-to-point subinterfaces using ip unnumbered use /32 subnet 255.255.255.240 static routing between sites ANL 140.221.48/24

8 Software Globus GARA Cisco IOS 12.05T == 12.05XE –rsp-pv-mz.091099 –rsp-pv-mz.100399. This image will be officially released as 12.0(5)XE2 test tools need Web-based mechanisms for monitoring testbed status e.g., active reservations

9 Schedule ANL up NWU router up; Globus/GARA (Alain) UIC router (11/1); Globus/GARA ? UIUC/NCSA router ordered; Globus/GARA ? UOC router in (11/1); Globus/GARA ? WISC router in (10/21); Globus/GARA ? ESnet router ?; Globus/GARA ? Abilene router ?; Globus/GARA ?

10

11 Testing Test machine + accounts for network engineers (Linux RH6.0) Baseline end-to-end BE performance Single stream end-to-end Premium service Multiple stream end-to-end Premium service

12 Measurement ANS Surveyor –Argonne argonne.ti.mm.advanced.org 192.5.186.100 –EVL –UWiswisc.csg.mm.advanced.org 198.150.1.22 –UChicagouchicago.csg.mm.advanced.org 128.135.247.250 –Brookhaven NLbnl.doe.mm.advanced.org 130.199.137.10 –IndianaUindiana.gigapop.mm.advanced.org129.79.20.72 –Fermilabfermilab.doe.mm.advanced.org 131.225.255.81 –SLACslac.doe.mm.advanced.org134.79.196.52 –Univ Utah utah.csg.mm.advanced.org128.110.18.123 –NCARncar.mm.advanced.org192.43.244.19

13 Measurement Measure end-to-end paths Logging at each site –gatekeeper –gara –diffsrv mgr –slot table –syslog capability would be helpful Access to router snmp statistics –looking glass –http? Coordination

14 Action Mailing list (emerge-tech@nsg.nwu.edu) Jon Dugan will maintain Linux tool repository Jon Dugan will maintain Cisco image repository All sites need to provide Linux (RH6.0) test box CoralReef to be ordered by EVL, NCSA, WIS


Download ppt "EMERGE Tech Agenda Oct 7, 1999 10:30-11Vision (Applications focus) (TD) 11-12:30Describe GARA + Test Results (VS) 12:30-1:30Lunch 1:30-2:15GARNET demo."

Similar presentations


Ads by Google