Rich MoeserEVLA System PDR December 4-5, 2001 1 EVLA System PDR Operations Requirements.

Similar presentations


Presentation on theme: "Rich MoeserEVLA System PDR December 4-5, 2001 1 EVLA System PDR Operations Requirements."— Presentation transcript:

1 Rich MoeserEVLA System PDR December 4-5, 2001 1 EVLA System PDR Operations Requirements

2 Rich MoeserEVLA System PDR December 4-5, 2001 2 Operations Requirements Operations Requirements Document (Initial Draft) –http://www.aoc.nrao.edu/evla/techdocs/computer/work docs/index.shtmlhttp://www.aoc.nrao.edu/evla/techdocs/computer/work docs/index.shtml –Currently in the review process Purpose of the document –Identify the top-level requirements Near-term plan –Analyze and incorporate comments, refine and broaden scope of document –Develop an initial design concept

3 Rich MoeserEVLA System PDR December 4-5, 2001 3 Clients

4 Rich MoeserEVLA System PDR December 4-5, 2001 4 Requirements Overview Target Platforms –Commodity PCs/Linux/Windows –Sun/Solaris –Macintosh/Mac OS (low priority) Security –Must be built into the system from the start –Users must have and provide a unique ID –Each user will have a set of access properties –Command and system access blocking

5 Rich MoeserEVLA System PDR December 4-5, 2001 5 Requirements Overview (cont.) Remote Observing –In the future operators may be stationed at the AOC –Either web-based or a downloadable/installable client –Should use a single code base Scheduling –Types: Fixed, Dynamic, Goal-oriented, “scan”-level –M&C and e2e

6 Rich MoeserEVLA System PDR December 4-5, 2001 6 Requirements Overview (cont.) Operator Log –Submit log entries –Query the logs –Generate reports from the log (e.g., Project log) –Link a log entry to a maintenance entry –User customization

7 Rich MoeserEVLA System PDR December 4-5, 2001 7 Requirements Overview (cont.) M&C Displays –A number of displays will be required –Easily created and integrated into the system –Quick look display with plotting ability Warning and Error Messages –Should be limited to relevant messages only –Attributes: severity, origin, cause, action, trigger, etc. –The attributes should be easily modified and not hard-coded

8 Rich MoeserEVLA System PDR December 4-5, 2001 8 What’s Next? Items requiring near-term resolution –Level of remote control of the array –Delineation of responsibilities between M&C and e2e to prevent duplication of effort Near-term design & implementation issues –Testbed using VLA monitor data stream delivered via the CMP –Investigate and Select a protocol for monitor & command data flows between operator stations and the real-time core

9 Rich MoeserEVLA System PDR December 4-5, 2001 9 More Features? Other features to consider –Display builder Users could create and import their own displays –Simulator Aide in software testing and operator training

10 Rich MoeserEVLA System PDR December 4-5, 2001 10 Questions?