1 Christopher Hill December 6, 2006 CE 679
Application of Ballast Flocculation for Sanitary Sewer Overflow Management North Dakota State University Christopher Hill December 6, 2006 CE 679

2 Outline Problem Overview Introduction Application Design Conclusion

3 Problem Overview What are SSOs? What is the cause of SSOs?
Why are SSOs a problem? What is the frequency of SSOs? How are SSOs managed?

4 Ballasted Flocculation
What is ballasted flocculation? Why ballasted flocculation? Actiflo®, DensaDeg®, Sirofloc®

5 Actiflo® System

6 Application – Satellite
Basin Located in the collection system Does not meet EPA secondary treatment standards Cost effective Screen Interceptor Sewer Sludge Actiflo® Actiflo Disinfection WWTP River

7 Application – WWTP Bypass
Headworks Located at WWTP Mixing with the WWTP effluent to comply with permitting limits Cost effective Secondary Treatment Actiflo® Disinfection River

8 Design – Flow Monitoring
Base on flow monitoring, develop model for sewer system. Typically designed for 5 year return period storm Design peak wet weather flow = 15 MGD

9 Design - Pretreatment Design Flow Pretreatment Ramp-up 150% Q
Ramp-down 50% Q Hydraulically 200% Q Pretreatment Screening (3 – 6 mm) 2 x 10 MGD Q = 10 MGD 2 x 5 MGD

10 Design – Coagulation Jar Test/Pilot Study Sizing Tank Mixing
Chemical Coagulant HRT 1 – 2 minutes Rapid Mixing (G = s-1) Jar Test/Pilot Study Sizing Tank V = (HRT) x Q = 1 min x gal/min = gal or ft3 Mixing Theoretical Power Requirement P = G2 m V = 12002(1.307x10-3 N*s/m2)13.2m3 = 24,844 W or 25 kW

11 Design – Flocculation Jar Test/Pilot Study Sizing Tank Mixing
Polymer Sand (2 – 4 g/L) HRT 1 – 2 minutes Rapid Mixing (G = s-1) Sizing Tank V = (HRT) x Q = 1 min x gal/min = gal or ft3 Mixing Theoretical Power Requirement P = G2 m V = 12002(1.307x10-3 N*s/m2)13.2m3 = 24,844 W or 25 kW

12 Design – Maturation Sizing Tank Mixing Maturation HRT 3 – 5 minutes
Slow Mixing (G = 160 – 200 s-1) Sizing Tank V = (HRT) x Q = 3 min x gal/min = 10,417 gal or 1,393 ft3 Mixing Theoretical Power Requirement P = G2 m V = 2002(1.307x10-3 N*s/m2)52.6m3 = 2,750 W or 2.8 kW

13 Design - Settler Tank Area Tank Dimensions Design Criteria Settler
Overflow Rate 20 to 80 gal/ft2*min Typically 30 gal/ft2*min Length: Width = 1:1 Lamellar Tubes Tank Area A = Q / Vo = gal/min / 30 gal/ft2*min = ft2 Tank Dimensions L = W = A1/2 = /2 = ft Use 11 ft Design Criteria Between 45o and 60o Incline Nominal Spacing 2 in Incline Length 3 to 6 ft

14 Design – Actiflo® System
Assume Depth of 12 ft

15 Design - Microsand 2 – 4 g/L of Microsand
4.8% of Q Sludge Actiflo® Influent Q Hydrocyclone 1.2% of Q Recycled Sand River Clarified Water 6% of Q Sludge Handling WWTP 2 – 4 g/L of Microsand Total Volume – Coagulation = 3,375 ft3 or 95,600 L The system requires kg ( lb) Sludge = 10 MGD x = 480,000 gal/day

16 Actiflo® Design

17 Actiflo® Design

18 Conclusions Evaluation of Alternatives Design Pilot Study
Disadvantages

19 Questions?