Ken Barry Acting Program Manager, Advanced Nuclear Technology (ANT) Program November 29, 2012 Task Group Name: Construction Quality and Speed Improvement.

Similar presentations


Presentation on theme: "Ken Barry Acting Program Manager, Advanced Nuclear Technology (ANT) Program November 29, 2012 Task Group Name: Construction Quality and Speed Improvement."— Presentation transcript:

1 Ken Barry Acting Program Manager, Advanced Nuclear Technology (ANT) Program November 29, 2012 Task Group Name: Construction Quality and Speed Improvement Technologies

2 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. New Nuclear Projects Under Construction Today 433 currently in operation Source: World Nuclear Association – Aug 2012 26 10 7 4 1 1 2 2 1 2 5* 3 1 Total - 66 *Watts Bar 2, Summer 2,3 & Vogtle 3,4 How many new Nucs are currently being constructed globally? 11? 33? 66? 99? 1

3 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Work Started at Vogtle Site in Georgia ESP and LWA Received in August 2009; COL Approved February 2012

4 4 © 2012 Electric Power Research Institute, Inc. All rights reserved. Work Started at VC Summer Site in South Carolina COL Approved March 2012 Source: SCANA

5 5 © 2012 Electric Power Research Institute, Inc. All rights reserved. Shin-Kori 3 & 4 Source: KHNP

6 6 © 2012 Electric Power Research Institute, Inc. All rights reserved. Flamanville 3 Source: EDF

7 7 © 2012 Electric Power Research Institute, Inc. All rights reserved. Sanmen in China, October, 2011 Source: Shaw Group

8 8 © 2012 Electric Power Research Institute, Inc. All rights reserved. Angra 3 Source: Christyam de Lima

9 9 © 2012 Electric Power Research Institute, Inc. All rights reserved. New Nuclear Projects Planned Today Source: World Nuclear Association – Aug 2012 COUNTRY REACTORS PLANNED China 51 Russia 17 India 18 USA 11 Japan 10 South Korea 5 Poland 6 Turkey 4 United Kingdom 4 Vietnam 4 UAE 3 Canada 2 Bangladesh 2 Belarus 2 COUNTRY REACTORS PLANNED Czech Republic 2 Indonesia 2 Iran 2 Kazakhstan 2 Romania 2 Ukraine 2 Argentina 1 Bulgaria 1 Armenia 1 Egypt 1 France 1 Jordan 1 Lithuania 1 158 New to nuclear PLUS – 329 Proposed Reactors 28

10 10 © 2012 Electric Power Research Institute, Inc. All rights reserved. Construction Quality and Speed Working Group NESCC Sponsored working group that will focus on: –Evaluating new technologies for decreasing construction time and costs while improving quality – panel of experts with periodic meetings –Identifying potential end users of the task group products, and articulating the suggested applications and extent of the applications for these end users. –Evaluating impact on codes and standards – roadmap feedback to NESCC –Developing feedstock for research organizations.

11 11 © 2012 Electric Power Research Institute, Inc. All rights reserved. Construction Quality and Speed Improvement Technologies Scope and Objectives of Task Group This task group will be focused on building techniques and materials which improve the speed and quality of construction and potentially lower costs. This will be a standing study group which would assess the efficiency benefits of a specific technology, determine what codes and standards would be necessary for regulatory acceptance and then develop a research plan to accomplish the code change.

12 12 © 2012 Electric Power Research Institute, Inc. All rights reserved. Construction Quality and Speed Improvement Technologies Expected Results of Task Group The task group products would be the development of a project proposal(s) for technological research needed for key code changes that would be delivered to the appropriate SDO(s). This task group would also propose discussions for the NESCC meeting agendas once discussions are mature for a given technology.

13 13 © 2012 Electric Power Research Institute, Inc. All rights reserved. Construction Speed and Quality Improvement Technologies Some of the initial areas that I think would be interesting to discuss are: Accelerating the curing of concrete Moisture tolerant concrete epoxies Threadless Conduit Couplers Cable splicing SC construction High Strength rebar Headed Rebar Auto Rebar Placement/Fabrication Modular Rebar Parallel Threaded Rebar Splices

14 14 © 2012 Electric Power Research Institute, Inc. All rights reserved. Construction Speed and Quality Improvement Technologies (continued) Some of the initial areas that I think would be interesting to discuss are: Integrated pre-fab for reinforced steel Automated Inspection technologies Optimized modular design, procurement, and fabrication technologies Near Site modular shop design Just-in-time production technologies of specific size shapes Increasing the completeness and testing of modules

15 15 © 2012 Electric Power Research Institute, Inc. All rights reserved. Example Technologies Accelerating the curing of concrete Moisture tolerant concrete epoxies Threadless Conduit Couplers Increasing the completeness and testing of modules Cable splicing SC construction High Strength rebar Headed Rebar Parallel Threaded Rebar Splices Auto Rebar Placement/Fabrication

16 16 © 2012 Electric Power Research Institute, Inc. All rights reserved. Example Technologies (cont.) Integrated pre-fab for reinforced steel Automated Inspection technologies Optimized modular design, procurement, and fabrication technologies Near Site modular shop design Just-in-time production technologies of specific size shapes

17 17 © 2012 Electric Power Research Institute, Inc. All rights reserved. Image from NASA Visible Earth Thank You