Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mt. Lebanon Public Works Facility Master Planning November 12, 2013 Update.

Similar presentations


Presentation on theme: "Mt. Lebanon Public Works Facility Master Planning November 12, 2013 Update."— Presentation transcript:

1 Mt. Lebanon Public Works Facility Master Planning November 12, 2013 Update

2 Master Planning Study  Kick-Off Meeting  Site Visit - Photographing and Field Measuring of Existing Buildings  Interview Meetings with Public Works Department Personnel – Initial Programming  Site Visit – Review of existing site conditions, stormwater controls, grading, sight lines, public pedestrian, traffic circulation and access points.  Meeting with Public Works Personnel – Programming and Initial Site Organization

3 Existing Site

4 Existing Buildings - Floor Plans

5 Program Spaces

6 Cranberry Township Public Works Garage Outdoor Program Spaces

7 North Huntingdon Township Public Works Garage Program Spaces - Areas

8 Outdoor Spaces - Areas

9 Vehicle & Equipment Garage Options

10 Master Planning – Site Study  Create an innovative plan for the site in terms of handling the quantity, quality, and velocity of stormwater runoff that is created from future development on the public works site.  Provide functional, secure indoor and outdoor storage and maintenance facility for Public Works  Provide a separate, secure outdoor storage area for Contractors  Create public recreational and pedestrian connections to surrounding parks and residential areas.

11 North Huntingdon Township Public Works Garage Site Plan – Concept #1

12 Site Plan – Concept #2

13 Site Profiles


Download ppt "Mt. Lebanon Public Works Facility Master Planning November 12, 2013 Update."

Similar presentations


Ads by Google