Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,

Similar presentations


Presentation on theme: "Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,"— Presentation transcript:

1 Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka, C. Stelmach NSLS-II

2 Main Technical Concerns 1.Machine Specifications and Tolerances Magnetic field quality Alignment of the SR magnets Vibration and thermal stability 2.Damping Wigglers High power density beam with a large fan 3.Cryogenic Permanent Magnet Undulators (CPMUs) Field measurement Precise gap separation and thermal stability Vacuum and impedance issues

3 1.Machine Specifications and Tolerances SR sextupole alignment tolerance: 30 - 40 μm (2-σ cut) BPM position stability (thermal): ± 1 μm Magnet position stability (thermal + vibration): 100 nm (rms, 4 – 50 Hz) NSLS-II SR Magnet Magnet Gap Max. Field (@ 3.6 GeV) Field Homogeneity Good Field Region Dipole35 mm0.393 T2 x10 -4 20mm x 10mm Quadrupole55 mm25.0 T/m2 x10 -4 40mm x 20mm Sextupole60 mm800 T/m 2 5 x10 -4 40mm x 20mm Magnetic Field Quality Preliminary designs of the magnets are underway. Magnet vendors will be consulted about the final designs and tolerances.

4 Magnet Alignment Very stiff girder with precisely machined slots for the magnet’s support frame. Adjustable magnet support frame to precisely align magnetic axis to a fixed height. Magnets are directly bolted to the girder without shims or alignment hardware. Six or more support points for the girder to minimize static deflection Australian Girder-Magnet Assembly SPring-8 Girder-Magnet Assembly

5 Magnet Vibration due to Ambient Ground Motion Ambient ground motion drops steeply as 1/ω 4 No significant vibration amplification for ω/ω n << 1 First natural frequency of the girder-magnet assembly should be above 30 Hz.

6 Magnet Vibration Low profile girder  beam height of ~ 1m No pedestals under the girder. Several (6 or more) girder support points Simple girder alignment mechanism No alignment mechanisms between the girder and magnets. ALBA Girder-Magnet Assembly Support Concept f 1 = 57 Hz APS Girder

7 NSLS-II SR and Booster Rings Low profile booster and SR rings. The floor drops in the experimental hall by 0.4m to provide a beam height of 1.4 m. Deep commercial anchors are cast in concrete eliminating the need for pedestals or grouting.

8 Thermal Stability Air and process water temperature regulation: ± 0.1 ºC If necessary SR girders can be insulated and sand-filled. Thermally-Insulated NSRRC Girder Thermal Insulation Sand

9 NSLS-II Damping Wigglers NSLS-II Damping Wiggler Period (mm)100 Length (m)6 No. of Periods60 Field (T)1.8 P total (kW) 79.7 P d (kW/mrad 2 ) 98.3 P v (kW/mrad) 18.8 Horizontal Fan ± K/ γ (mrad) ± 2.45 At 7m from the center of the wiggler, the fan is ~ 34 mm. Incidence power density at 0.6 mrad incidence = ~ 1.6 W/mm  Aluminum chamber will require additional cooling channels. Dipole Chamber 7m Cooling Channel

10 Beam position interlock will be required to protect the chamber. Incidence power density at 10 m and at 1.5 degree incidence = ~ 50 W/mm. A Glidcop fixed mask can handle this power density. 10 GPM water flow  ΔT ~ 30 ºC NSLS-II Damping Wigglers – Fixed Mask APS quad with exit port Wiggler Gildcop Mask ~ 25 cm long

11 Thermal FatigueTests at APS (26-ID Beamline) Realistic design criteria will be established based on thermal fatigue tests at APS. Designs of high-heat-load absorbers and photon shutters will be optimized.

12 NSLS-II CPMU – Technical Challenges Magnetic Measurements of long small gap, UHV compatible undulators Precision control of the Undulator gap Effects of external environmental conditions on undulator gap control, energy and pointing stability. Temperature/Magnetic uniformity along magnet arrays Vacuum, Impedance, and beam dynamics issues associated with variable magnet gap to beam tube transitions and large chambers.

13 3-Meter In-vacuum CPMU based on X-25 Undulator Design NSLS X-25 Undulator We can extend experience gained from the Cryo-ready in-vacuum Undulator recently installed at X-25 to design the NSLSII CPMU’s. A long modern measurements bench and pulsed wire system in temperature- controlled clean room environment will be used for measurements and shimming. Concept for NSLS-II

14 Concept of an In-vacuum Cold Mapper for NSLSII CPMU’s In-vacuum Mapper with Hall probe in fully opened magnet gap Mapper mounted on custom flange cover.

15 Optical Micrometers will directly measure the Cold Magnet Gap to sub-micron accuracy Precision Gap Control in CPMU Measurement accuracy of ±1μm and resolution of ±0.1μm. Studies are currently underway to study the effects of environmental factors. Temperature feedback control may be implemented to the external Undulator structure

16 Undulator Impedance Issues Detailed modeling of the X-25 and NSLS II undulator cavities will be performed. If problems are observed during commissioning a feed back system will be implemented. Undulator transition impedances will be studied and low impedance transition designs will be implemented

17 Summary There are concerns regarding machine tolerances, damping wigglers and CPMUs. The important technical issues are well known and are being addressed.