Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proposed 802 Rules Changes to Address Industry Connections John D’Ambrosia, Dell Wael William Diab, Broadcom.

Similar presentations


Presentation on theme: "Proposed 802 Rules Changes to Address Industry Connections John D’Ambrosia, Dell Wael William Diab, Broadcom."— Presentation transcript:

1 Proposed 802 Rules Changes to Address Industry Connections John D’Ambrosia, Dell Wael William Diab, Broadcom

2 Terminology and Background IC – Stands for Industry Connections program – Oversight is done by the IEEE-SA Standards Board Previously under IEEE-SA BoG. Moved this year – Program allows for activities that are entity or individual and with or without sponsor oversight (matrix of 4) http://www.ieee802.org/minutes/2010- November/opening_plenary/1110_industry_connections_2.pdf http://www.ieee802.org/minutes/2010- November/opening_plenary/1110_industry_connections_2.pdf ICCom – Newly formed committee of the IEEE-SA Standards Board focused on IC activities and making recommendation to the IEEE-SA SB on them ICAID – Stands for Industry Connections Activities Document – Similar to a PAR form in terms of governance flow and approvals but different in terms of content – Currently being updated and will incorporate much of the feedback learned from activities such as BWA and HSE

3 Overview ICCom asks for endorsement from the sponsor of ICAID and its contents for proposed Industry Connections activity that indicate sponsor oversight Currently, no procedures within 802 to address endorsement Following principles proposed for changes to 802 EC Operations Manual – Specific changes to the OM to be shown after initial EC feedback on Friday

4 Principles (1) The ICAID is required for EC review and made available for the motion to endorse Procedures to follow study group policies in EC OM with the following exceptions – Endorsement EC Endorses ICAID content – Duration chartered for the requested duration of the ICAID – Termination Termination of an approved IC activity by request to ICCom and occurs – upon completion of deliverables – or at the end of requested duration EC can request termination of IC activity prior to the above

5 Principles (2) Use of the Industry Connections program is appropriate for the following activities within the 802 sponsor and its subgroups – Report – White paper – Pre-study group activity – Presentations Use of the Industry Connections program is not appropriate to replace normal study group function for PAR generation within the 802 sponsor and its subgroups


Download ppt "Proposed 802 Rules Changes to Address Industry Connections John D’Ambrosia, Dell Wael William Diab, Broadcom."

Similar presentations


Ads by Google