Presentation is loading. Please wait.

Presentation is loading. Please wait.

Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL.

Similar presentations


Presentation on theme: "Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL."— Presentation transcript:

1 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL

2 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 2 ICC Organisation

3 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 3 SPIRE ICC Systems Overview Several machines based at RAL but with access from all ICC sites… Propagated Database(s) Remote access e.g. via QLA, ObsExporter Product Pools Data Processing and Calibration Products Operational Software and Results (Health Monitoring, Operational Day logging, Trend Analysis etc) Common Uplink System Helpdesk system (RAL) Websites TWiki based at Leuven (main site for information sharing) Wiki based at NHSC (NHSC analysis and results) Test Team Website based at RAL (Test Data) HSC/ESTEC Sites hosting SxR system, NCR system and documentation

4 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 4

5 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 5 Operations Team Status Operational Procedures and Interactions Instrument Users Manual Helpdesk SPIRE mailbox is operational AOT Maintenance and Testing CUS Scripts and Procedures Operational Day Logging Instrument Health Monitoring Trend Analysis

6 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 6 Calibration Team Status PV Phase Planning Observation Definition Testing PV Phase Uplink Calibration File Design and Population DP Calibration File Design and Population DP Calibration File Testing

7 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 7 Observations Group Status DP Requirements Acceptance Testing Scientific Validation

8 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 8 Software Team Status SPIRE Data Processing Development So far mostly pipeline oriented although some display tool development has also taken place Full integration into HIPE in progress Interactive Analysis By design pipeline modules can be used for interactive analysis and all tasks can be run interactively, Effort will move to interactive analysis development between now and launch Integration with HIPE is a major step in this process Extended Work Packages Contribution to HCSS/DP

9 Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 9 Summary The ICC is moving forward with a good working structure This will be maintained going into operations The work division between the teams is generally well understood The work is generally on track to be ready for operations, However, staffing (and expertise of staff) is a perennial issue which remain Many thanks to Ken!


Download ppt "Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL."

Similar presentations


Ads by Google