F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.

Similar presentations


Presentation on theme: "F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011."— Presentation transcript:

1 F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

2 Outline Technical Specifications Invitation to Tender Chiller Configuration – P&ID – Required services Construction Time Schedule 20 October, 2011Thermosyphon cooling workshop §52

3 Overview of Technical Specifications Two stage Chiller with a cooling capacity of 170kW @ -70°C. Able to run from 20% to 100% of capacity @ all temperatures set points (from 20 to -70°C). Two Operation regimes: – Normal Operation: 170kW @ -70°C; – Warm Operation: 50kW @ -20°C; Runs with 1 st Stage only (R404a). Air cooled Condenser (independent of cooling water availability). 1 st Stage connected to Diesel Power network. 20 October, 2011Thermosyphon cooling workshop §53

4 Invitation to Tender Market Survey (x64 companies contacted): – 6x companies were qualified: Angelantoni (it); Cofely Refrigeration (de); GEA Matal / Technofrigo (fr); Johnson Controls (ch); J&E Hall (uk); Telstar (es). Invitation to Tender: – 4x Offers received: Johnson Controls Angelantoni J&E Hall Telstar Best offer from J&E Hall 20 October, 2011Thermosyphon cooling workshop §54

5 Chiller Configuration Original required configurations: – Configuration A: Three redundant chillers each with a capacity of 50% of total power. – Configuration B: One chiller 100% power chiller with redundant compressors + 2 low power chillers (one of them air cooled). Final configuration by J&E Hall: – Two full power chillers (one with air cooled condenser for warm operation). – The two full power chillers cost half the price of any of the original required configurations. – One chiller has been ordered. The second (redundant) chiller is planned to be ordered in a later stage of the project. 20 October, 2011Thermosyphon cooling workshop §55

6 Chiller Configuration 20 October, 2011Thermosyphon cooling workshop §56

7 Chiller Configuration P&ID EDMS 1149580 20 October, 2011Thermosyphon cooling workshop §57 1 st Stage R404a Compressor 1 st Stage R404a Compressor 2nd Stage R23 Compressor 2nd Stage R23 Compressor Water cooled Condenser Air cooled Condenser Warm Operation Brine HX Normal Operation Brine HX

8 Chiller Required Services Normal Operation (170kW @ -70°C): – Water consumption: 101.4m 3 /h – Electrical Power consumption (absorbed Power): 314.4kW – Pneumatic air supply (6bar) Warm Operation (50kW @ -20°C) – Water consumption: Not required – Electrical Power consumption (absorbed Power): 75.2kW (on Diesel) – Pneumatic Air supply (6bar) 20 October, 2011Thermosyphon cooling workshop §58

9 Chiller N1 Construction Time Schedule Payment plan (total cost = 591,240 CHF): – Contract started: 10% – Design phase completed 20% – Construction of the Chiller 30% – Delivery and Installation at CERN 30% – Commissioning at CERN 10% Time Schedule: – Contract started: 10% Completed (September 2011) – Design phase completed 20% Completed (October 2011) – Construction of the Chiller 30% On going (December 2011) – Delivery and Installation at CERN 30% Planned to January 2012 – Commissioning at CERN 10% Planned to May-June 2012 20 October, 2011Thermosyphon cooling workshop §59

10 Any questions? 20 October, 2011Thermosyphon cooling workshop §510