M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair.

Similar presentations


Presentation on theme: "M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair."— Presentation transcript:

1 M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair

2 Working Group Highlights Date Formed: June 2003 Objectives: Create generic M&V plan Define minimum requirements for use in Federal sector Without constraint of existing contracts

3 Background on Goals Air Force developing recommended M&V strategies for specific ECMs Develop format for M&V plans first, then develop content Improve quality & uniformity of M&V across Federal sector

4 Draft Deliverables Ready! M&V Plan Outline Post-Installation M&V Report Outline

5 Development process Very aggressive schedule – WG formed at New Orleans Summit Consistent participation by ESCOs, PFs & Labs Compared FEMP format (existing) and Air Force format (under development) Identified shortcomings of existing formats

6 M&V Plan Development 3 sections: Executive Summary / M&V Overview Whole Project Data / Global Assumptions ECM Specific M&V Plan Baseline, post-install, and periodic activities separated for each ECM

7 M&V Plan Development M&V plan includes schedule and content for all M&V reporting items: Commissioning Plan Post-Installation M&V report Commissioning report Annual report Integration with Commissioning a challenge Place holder in M&V Plan to define Cx report format & content TBD by Cx working group

8 M&V Plan Development Uncertainty is included throughout Global – define requirements for uncertainty analysis ECM specific – variables impact on uncertainty O&M reporting requirements included Does not include repair & replacement or operation & maintenance requirements Define requirements for government witnessing Dispute resolution in Global section Executive Summary has % Total Site Usage Saved (if available)

9 Post-Installation M&V Report For DOE contract, post-installation M&V report is required and will contain Commissioning results For projects using Option A, most important M&V report Started with Annual Report Outline Included installation verification, commissioning results, and construction period savings

10 Next steps… Commissioning WG to define reporting requirements for inclusion in M&V Plan Outline WG recommends M&V Team accept & adopt package of draft deliverables Disband M&V Plan WG Consider creation of new WG to reconcile: M&V Plan Outline Post-Install Report Outline Annual Report Outline

11 Next Steps… Review for compliance with Army ESPC contracts Start using templates – include in DO RFP or similar FEMP will revise sample M&V plans into new format Consider drafts living documents and modify as needed (http://ateam.lbl.gov/mv/)http://ateam.lbl.gov/mv/

12 Thanks for everyone’s hard work! Dave WardBonnie Piest Dale SartorMike Cross Lia WebsterDarryl Matsui Satish KumarRon Araujo Doug DahleBalaji Santhanakrishnan David WilliamsMax Hogan Scott JudsonEric Vaughn Steve DunnivantMark Stetz


Download ppt "M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair."