Presentation is loading. Please wait.

Presentation is loading. Please wait.

GLOBAL GRID FORUM 10 Workflows in PROGRESS and GridLab environments Michał Kosiedowski.

Similar presentations


Presentation on theme: "GLOBAL GRID FORUM 10 Workflows in PROGRESS and GridLab environments Michał Kosiedowski."— Presentation transcript:

1 GLOBAL GRID FORUM 10 Workflows in PROGRESS and GridLab environments Michał Kosiedowski

2 GLOBAL GRID FORUM 10 PROGRESS (1) Duration: December 2001 – December 2003 Budget: ~4,0 MEuro Project Partners –Sun Microsystems Poland –PSNC IBCh Poznań –Cyfronet AMM, Kraków –Technical University Łódź Co-funded by The State Committee for Scientific Research (KBN) and Sun Microsystems Poland

3 GLOBAL GRID FORUM 10 PROGRESS (2)

4 GLOBAL GRID FORUM 10 Grid Service Provider Job Submission Service –delivers functions for computing job building, submitting them to the grid for execution and viewing the results. It allows to create jobs, configure its tasks and set the requirements for grid environment resources. The service prepares grid job descriptions using the XRSL language. The description is then transferred to the GRB for the execution of the job. Application Management Service –manages the PROGRESS application repository. An application descriptor contains a reference to the application ’ s executable and a set of its available, required or optional arguments, required environment variables as well as input and output files. One executable may be referenced by many applications. Different application configurations are recognized as independent applications

5 GLOBAL GRID FORUM 10 Grid Resource Broker built on the top of core infrastructure provided by the Globus Toolkit 2.x enables the execution and control of PROGRESS grid jobs through the GRAM protocol on computing resources connected to the PROGRESS grid matches and submits the job to the best fitting resource, according to the job description and application requirements, additionally taking into account policies set by the grid administrators grid job definitions are sent to the GRB in the form of XRSL documents

6 GLOBAL GRID FORUM 10 Workflows (1)

7 GLOBAL GRID FORUM 10 Workflows (2)

8 GLOBAL GRID FORUM 10 Workflows (3)

9 GLOBAL GRID FORUM 10 Workflows (4)

10 GLOBAL GRID FORUM 10 XRSL (1) : describes a single task to be performed on the grid together with all application and user requirements, including static and dynamic resource parameters, environment variables, stdin, stdout, stderr, etc., : describes a sequence of tasks to be performed on the grid, must contain at least one or, : describes tasks to be executed in parallel on the grid, must contain at least one or.

11 GLOBAL GRID FORUM 10 XRSL (2) T3T3 T4T4 T5T5 T1T1 T2T2

12 GLOBAL GRID FORUM 10 Virtual Applications (1) A user can create and save different workflow structures of regular applications as virtual applications and thus allow other users to choose a virtual application from the list of available applications. Then, the workflow is automatically created by the GSP ’ s Job Submission Service based on the application description obtained from the Application Management Service.

13 GLOBAL GRID FORUM 10 Virtual Applications (2)

14 GLOBAL GRID FORUM 10 Grid(Lab) RMS (1) Grid Resource Broker

15 GLOBAL GRID FORUM 10 Grid(Lab) RMS (2)

16 GLOBAL GRID FORUM 10 Contacts http://progress.psnc.pl/ http://progress.psnc.pl/portal/ progress@psnc.pl http://www.gridlab.org/ http://portal.gridlab.org/ office@gridlab.org http://www.psnc.pl/


Download ppt "GLOBAL GRID FORUM 10 Workflows in PROGRESS and GridLab environments Michał Kosiedowski."

Similar presentations


Ads by Google