Presentation is loading. Please wait.

Presentation is loading. Please wait.

Public Hearing May 22, 2012. Case:CDR-11-11-264 Project:Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP) - Substantial.

Similar presentations


Presentation on theme: "Public Hearing May 22, 2012. Case:CDR-11-11-264 Project:Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP) - Substantial."— Presentation transcript:

1 Public Hearing May 22, 2012

2 Case:CDR-11-11-264 Project:Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP) - Substantial Change Applicant:John Prowell District:1 Stillwater Crossings & Center Bridge PD/LUP

3 Request: To consider a substantial change to the approved Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP): 1)Transfer 30 Single-family units from Parcel CB-6 to CB-8, 2)Request the following waivers from the Original Horizon West Village Code for Parcel CB-6 only: a) Request a waiver from Section 38-1384(b) and (c) to allow the block depths to be less than 240 feet and block lengths to be less than 300 feet; b) Request a waiver from Section 38-1386(b)(2) to allow the minimum average lot size to be 3,500 square feet in lieu of 4,800 square feet; Stillwater Crossings & Center Bridge PD/LUP

4 Request Cont’d: c) Request a waiver from Section 38-1386(b)(4) to allow for a minimum lot width of 32 feet in lieu of 40 feet; d) Request a waiver from Section 38-1386(b)(5) to allow the minimum lot depth requirement to be 112 feet in lieu of 120 feet; e) Request a waiver from Section 38-1386(b)(8) (a) to allow the front porch setback to be reduced from 10 feet to 7 feet; and f) Request a waiver from Section 38-1386(b)(8) (b) to allow the side yard setback to be reduced from five feet to four feet. Stillwater Crossings & Center Bridge PD/LUP

5 Zoning Stillwater Crossings & Center Bridge PD/LUP

6 Future Land Use Stillwater Crossings & Center Bridge PD/LUP

7 PD Land Use Plan Stillwater Crossings & Center Bridge PD/LUP

8 Action Requested  Find the request consistent with the Comprehensive Plan and approve the Substantial Change to the approved Stillwater Crossings & Center Bridge PD/LUP dated “Received March 27, 2012,” subject to the five (5) conditions in the staff report. Stillwater Crossings & Center Bridge PD/LUP

9 Public Hearing May 22, 2012


Download ppt "Public Hearing May 22, 2012. Case:CDR-11-11-264 Project:Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP) - Substantial."

Similar presentations


Ads by Google