Presentation is loading. Please wait.

Presentation is loading. Please wait.

Supply Chain Innovation at Geddy’s Team Name :GSCMI Warriors 1 st Round Room: 4009 Satish Kunchakuri Harshal Samant Erik Parronchi Gokul Nair.

Similar presentations


Presentation on theme: "Supply Chain Innovation at Geddy’s Team Name :GSCMI Warriors 1 st Round Room: 4009 Satish Kunchakuri Harshal Samant Erik Parronchi Gokul Nair."— Presentation transcript:

1 Supply Chain Innovation at Geddy’s Team Name :GSCMI Warriors 1 st Round Room: 4009 Satish Kunchakuri Harshal Samant Erik Parronchi Gokul Nair

2 GSCMI 2013 Case Competition 2 Indian Context Harshal Samant Geddy’s Supply Chain Lack of Cold Storage facilities High degree of Seasonality Low Differentiation High power and fuel cost Milk sourcing from co-operative societies

3 GSCMI 2013 Case Competition 3 Implication on Supply Chain Harshal Samant Limitations to expand business Regional players Cold storage facilities No Level production Limitation to capacity expansion High degree of seasonality Centralized production and storage Forces Geddy’s to maximize usage of depot at factory High power and fuel cost

4 GSCMI 2013 Case Competition 4 Implication on Supply Chain Harshal Samant Milk sourcing from co-operative societies Need to maintain high degree of quality control Milk supply Maintain high in-stock service level Low differentiation between ice-cream and frozen dessert

5 GSCMI 2013 Case Competition 5 Short-term strategy Erik Parronchi Cost Efficiency Hedge contracts for raw and packaging materials Benchmark with indirect companies to increase bargaining power Revenue generation through home delivery services 1 2 3

6 GSCMI 2013 Case Competition 6 Long-term strategy Erik Parronchi Market Expansion AwarenessB2BKiosksCart

7 GSCMI 2013 Case Competition 7 Long-term strategy Erik Parronchi Cost Efficiency Vertical Integration Increase control Production Raw material Supply Chain Distribution

8 GSCMI 2013 Case Competition 8 Planning for the uncertainty! Satish K Cost Efficiency Vertical Integration Increase control Production Raw material Supply Chain Distribution Mixed-production strategy Lease out current under-utilized capacity Rent additional cold-storage for increased demand Advertising and promotions during winter season Optimal production + export to Australia and other countries

9 GSCMI 2013 Case Competition 9 Explaining Discrepancies.. Gokul Nair  Sudden drop in Weekly sales from week 28 to 29  A correlation between sales of BT and BBS observed  BT stock out results in customers not purchasing BBS Insights The customers are probably mixing both flavors in a cone/scope. Therefore, unavailability of one results in drop in sale of other. Conversely, when BT is in stock, the corresponding sale of BBS also increases, so Geddy should try and maintain their availability. Stockouts Week TVBBSLLBTTotal SalesTVBBSLLBT 28931084996345-YYY 2991774416227- Y

10 GSCMI 2013 Case Competition 10 Best Performing Policy Gokul Nair  We recommend a “Scaled Stocking Level Policy” in order to maximize the profit (12.04/unit)  Profit Calculations Policy TypeProfit/Unit Target Service Level Policy 12.30 Scaled Stocking Level Policy 12.04 Common Service Level 11.28 Target Level for Top 3 Margin 8.03 Target Level for Top 2 Margin 10.45  Achieve highest profits to meet space limits of 350 units.  Target level policy not selected as it never meets the total space limits, despite having higher profits/unit

11 GSCMI 2013 Case Competition 11

12 GSCMI 2013 Case Competition 12

13 GSCMI 2013 Case Competition 13 Calculations.. CoefficientsStandard Errort StatP-value Intercept11.59359856.0578497981.9138140.062017 BT0.54854050.115208734.7612752.03E-05 BBS0.36775820.0902716964.0739040.000185 Regression EquationBBS Sales =.548 x BT Sales+.367 x BBS Demand + 11.59 BT_salesBBS_demandBBS_salesBBS_sales_Actual 15.68308122.8865.3865376.72314672 10.81985124.863.4249576.65585203 15.75081122.8865.4236863.8793426 15.44297122.8865.2548264.755019 18.15733121.9266.3907170.96235342 20.6293120.9667.3936469.43307939 25.49975119.0469.3591870.44340177 Anova Chart


Download ppt "Supply Chain Innovation at Geddy’s Team Name :GSCMI Warriors 1 st Round Room: 4009 Satish Kunchakuri Harshal Samant Erik Parronchi Gokul Nair."

Similar presentations


Ads by Google