Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook.

Similar presentations


Presentation on theme: "Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook."— Presentation transcript:

1 Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook

2 Motivation We wish to monitor gas quality with high precision GOOFIE is a classical solution (NA49 TPC, CERES TPC, HADES MDC, STAR FTPC) We have a three component gas mixture (Ne:CO 2 :N 2 ) Modifications Aim Drift field 400 V/cm Resolution 0.1 ‰ Measurement of drift velocity and gain ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk

3 Drift monitor detector Progress with the TPC gas monitor Dariusz Antończyk Proportional counter modification Connected to voltage of field cage Added a wire mesh in front of the window Removed many insulators -9.86 kV 241 Am  Far signal A K We have three GOOFIEs from MPI München (Dr. V. Eckardt)

4 Progress with the TPC gas monitor Dariusz Antończyk Drift monitor detector We replaced the HV cable and added copper rings

5 Simulation of field cage ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk E [V/cm]

6 Simulation of field cage ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk oldnew

7 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Simulation of Pickup detector newold

8 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Simulation of Pickup detector oldnew

9 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Simulation of Pickup detector new old

10 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Pickup detector Constructed by A.Radu (GSI)

11 Ternary gas mixture map (simulations) ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk  Different dependences for [CO 2 ] and [N 2 ]

12 Bragg Peak study ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk

13 On-line display Temp. and O 2 Pressure LV HV Pickup Vr Near Far Fan-in/Fan-out Gas outlet Gas inlet CAMAC controller   Discr. FADC ADC Trigger Set-up ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk

14 Measurement LabVIEW display for the GOOFIE On-line Analysis

15 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Long term dependence hours T/P [K/bar] P [mbar] T [ o C] V e [cm/  s] Blue – corrected V e Black – ON-line V e Red – OFF-line V e

16 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Correction for T and P Correction formula : V dcorr = V d – p1(T/P - ) T/P [K/bar] V d [cm/  s]

17 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Drift velocity resolution Mean : 2.5415  0.0002 Sigma : 0.0022  0.0002 Resolution: 0.87 ‰ First try!

18 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Gain vs time dependence hours gain [a.u]

19 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Summary & Outlook After applied modifications some improvements have been achieved: more uniform response of the system 400 V/cm electric field 0.87 ‰ resolution of the GOOFIE drift velocity In the nearest future further effort will be made to refine the GOOFIE resolution. This can be done by : improved temperature measurement improved gain measurement use final electronics (Luciano) and implement the system into the DCS

20 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Summary & Outlook Problems to be solved : understanding of gain dependence on various parameters (P, T, gas composition, etc.) small discharges elimination

21 ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk Backup

22 Simulation of drift velocity ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk

23 Bragg Peak study ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk

24 Fit functions ALICE TPC Collaboration Meeting, Cagliari 16-17.05.2004 Progress with the TPC gas monitor Dariusz Antończyk OFF- line y=p0+p1*exp(-exp(-z) – z +1) z=x-p2/p3 ON- line gauss fit


Download ppt "Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook."

Similar presentations


Ads by Google