2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.

Similar presentations


Presentation on theme: "2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization."— Presentation transcript:

1 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization 15 January 2013

2 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 2 EUL Overview & Process  Leveraging strategic real property assets to benefit installations and communities. Determines the feasibility of a proposed opportunity using screening tools, during a SiteVisit. Focuses on identifying the highest and best use of non-excess asset via the Feasibility Study. Consists of industry day and Request for Qualifications to determine the Highest Ranked Offeror. AF conducts lease negotiations with developer/ partner to finalize arrangement s of the lease. Provides Project Management and AF Asset Management. PHASE 0 Project Identification PHASE 0 Project Identification PHASE II Project Acquisition PHASE II Project Acquisition PHASE III Execution PHASE III Execution PHASE IV Design & Construction PHASE IV Design & Construction PHASE I Project Definition PHASE I Project Definition

3 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 3 3 Project Identification Geographic Information Systems Real Estate Market Resources Energy Market Resources EUL /PPA Opportunity EUL /PPA Opportunity Tools for Analysis Community, Private Sector & Installation Inquiries Air Force Civil Engineer Center Research

4 4 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 4 EUL Requirements Non-excess property under the control of the Secretary of the Air Force Economic & technical viability dependent on selling majority of generated power to commercial off-taker Compatible with existing and planned missions; environmental, cultural, and site specific requirements

5 5 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 5 PPA Requirements Potential generated capacity consistent with base load requirement

6 6 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 6 Combined EUL & PPA AFCEC evaluating processes, authorities, etc. to combine EUL and PPA Challenge is combining Federal Acquisition Regulation (FAR) PPA with non-FAR EUL Success of combined EUL & PPA still contingent on market conditions and economic viability

7 7 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 7 Patrick AFB Malabar Annex  Palm Bay, Fla.  640/480 acres  Working with community to get their input & learn about their needs  Collaborate to enhance mission  Evaluate energy  Various opportunities for potential use

8 8 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 8 To Pursue or Not?  Viable  Patrick AFB Ramey Solar Observatory  High electricity prices in Puerto Rico  Renewable Portfolio Standard in Puerto (20% by 2035)  Strong solar resource in Puerto Rico  Not Viable  Barry M. Goldwater Range (formerly Luke AFB)  Lack of market interest verified with Arizona Public Service  Potential environmental/cultural concerns  Interconnection proposed risk

9 9 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 9 Summary  Implemented expedited analysis of opportunities in 2012  Streamlining EUL & PPA processes  Air Force welcomes input from installations, communities as well as the private sector  Multiple channels to communicate with Air Force

10 10 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 10 Contact Information Brian Brown Chief of Strategic Asset Utilization Brian.brown.11@us.af.mil Chuck Cyr Chief of EUL Business Development charles.cyr@us.af.mil AirForceEUL@afeul.com http://bit.ly/AirForceEUL

11 11 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 11 Back Up Slides

12 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 12 12 AF Renewable Energy Project Development Air Force REPD established Nov 2010 Forum/process for renewable energy evaluation and decision-making Ensure all renewable energy projects are developed in a way as to provide the greatest benefit to the Air Force Balancing compliance with energy goals, asset management and economic feasibility Reviews new opportunities and project concepts to recommend an execution method

13 13 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 13 EUL Determination

14 14 2013 ADC INSTALLATION INNOVATION FORUM | PAGE 14 PPA Determination


Download ppt "2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization."

Similar presentations


Ads by Google