Presentation is loading. Please wait.

Presentation is loading. Please wait.

UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 1 SUMMARY OF METHODOLOGICAL.

Similar presentations


Presentation on theme: "UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 1 SUMMARY OF METHODOLOGICAL."— Presentation transcript:

1 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 1 SUMMARY OF METHODOLOGICAL WORK Samir Amous, APEX, Tunisia Regional Centre for North Africa and Middle-East Tel : +216 71 848 094 --- Fax : +216 71 843 453 amous.apex@gnet.tn amous.apex@gnet.tn

2 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 2 AIM OF THE WORK  Develop technical background materialS that can support different steps in the CDM project cycle  to be used by national teams and international audience.

3 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 3 Review internationally available guidance material. Develop technical background material that can support different steps in the CDM project cycle to be used by national teams and international audience. Assess different methodological approaches in relation to national CDM project cases and develop good practice guidance for project assessment. The approaches applied and developed in this project should facilitate: Transparency and simplicity. Efficiency in facilitating fast project development with low transaction costs. Efficiency in reducing GHG emissions and assissting sustainable development goals. Replicability – implying that project developers and host countries can use the approach in a similar way. Enhancement of national capacity to participate in CDM markets and other CC activities.. Assess different methodological approaches in relation to national CDM project cases and develop good practice guidance for project assessment: Transparency and simplicity. Efficiency in facilitating fast project development with low transaction costs. Efficiency in reducing GHG emissions and assissting sustainable development goals. Replicability – implying that project developers and host countries can use the approach in a similar way. Enhancement of national capacity to participate in CDM markets and other CC activities. AIM OF THE WORK (CONTINUED)

4 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 4 Types of background/methodological work Research ( R ) Guidance material (G) Manual ( M) Training material (T)

5 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 5 Background/methodological products - Responsibilities UCCEE-Denmark  work on the issues and coordinate the work Regional Centres  work direclty on the issues considered National teams  will feed the Background/ methodological products with countries’ perception, feed-back and experiences

6 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 6 Background/methodological products - Approach Will take stock of international experiences on different aspects to be addressed  State of the Art Will feed the National projects (studies, training, etc.) Will be used and adapted according to national circumstances (NTSE responsibilit, with assistance from Regional Centres)

7 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 7 1. Legal and institutional framework for CDM

8 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 8 R (background paper), M, G, Legal, regulatory, financial, technical and institutional framework for project implementation (including DNA organisational structure and operationalization) Capacity for negotiating with project financers and others Private sector participation/public co-operator First draft  End of March 2003. The final paper should include national inputs (e.g. reflecting invetsment structures)

9 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 9 2. BASELINE determination

10 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 10 R (background paper), M and T:  Generic Baseline Approaches  Litterature review  Synthesis  Case examples and illustrative cases (e.g. electrical sector, small scale projects)  Best practices First draft  End of March 2003.

11 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 11 3. Project Cycle Operations

12 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 12 R (background paper), G and T:  Additionality  Project implementation and operations (identification…baseline determination, Validation, etc…monitoring…certification)  Synthesis  Case examples and illustrative cases (e.g. electrical sector, small scale projects)  Best practices First draft  End of March 2003.

13 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 13 4. Sustainable Development Issues

14 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 14 G and M:  Use of reference related to development and Climate Change  international litterature  Guidelines to integrate SD aspects into CDM project assessment  Indicators on SD  Case examples and illustrative cases  National teams should be involved First draft  End of March 2003.

15 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 15 5. Risk and benefit Sharing (Short & Long-term)

16 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 16 Will certainly be raised as soon as the PK is ratified To be considered later during the project

17 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 17 6. Possible other emerging issues

18 UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 18 To be decided later


Download ppt "UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002 1 SUMMARY OF METHODOLOGICAL."

Similar presentations


Ads by Google