Welcome to the 16 th GridPP Collaboration Meeting Introduction GridPP3 Project Leader GridPP3 Proposal Tier-2 Funding Timeline Steve Lloyd, Chair of the.

Similar presentations


Presentation on theme: "Welcome to the 16 th GridPP Collaboration Meeting Introduction GridPP3 Project Leader GridPP3 Proposal Tier-2 Funding Timeline Steve Lloyd, Chair of the."— Presentation transcript:

1 Welcome to the 16 th GridPP Collaboration Meeting Introduction GridPP3 Project Leader GridPP3 Proposal Tier-2 Funding Timeline Steve Lloyd, Chair of the GridPP Collaboration Board

2 Slide 2 Steve Lloyd GridPP16 Introduction GridPP3 Project Leader Having done the job for 6 years Tony Doyle understandably did not wish to continue for a further 3 years (or more). A Search Committee was set up by the CB to find a successor (Peter Dornan, Pete Watkins, John Womersley and SLL). There was one obvious candidate and a couple of possibilities. As recently announced Dave Britton will be the GridPP3 Project Leader (subject to PPARC approval and suitable financial arrangements between PPARC, Dave and Imperial). Congratulations (or commiserations) Dave!

3 Slide 3 Steve Lloyd GridPP16 Introduction Proposal Procedure Tier-1£Am Tier-2£Bm Middleware£Cm Applications£Dm Management£Em … Total £Xm Tier-1£am Tier-2£bm Middleware£cm Applications£dm Management£em … Total £YM Proposal Re-evaluation Peer Review Institute 1£fm Institute 2£gm Institute 3£hm Institute 4£im Institute 5£jm … Total £YM Apply for Grants GridPP1/ GridPP2 GridPP3 Tier-1£Am Tier-2£Bm Middleware£Cm Deployment£Dm Management£Em … Total £Xm Institute 1£Fm Institute 2£Gm Institute 3£Hm Institute 4£Im Institute 5£Jm … Total £XM Peer Review Proposal Allocate Institute 1£fm Institute 2£gm Institute 3£hm Institute 4£im Institute 5£jm … Total £YM Is this still a sensible project?

4 Slide 4 Steve Lloyd GridPP16 Introduction Tier-2 Allocations Take each experiments CPU and Disk requirements (from Dave Newbold) For each experiment – share out among Tier-2s For each Tier-2 share out among institutes Sum over experiments (maintains the correct CPU/Disk ratio) Sharing guided by: Size of local community (number of Ac/Ph/PP) Past delivery (KSI2K to date, Disk usage last quarter) Current resources available

5 Slide 5 Steve Lloyd GridPP16 Introduction Tier-2 Shares Physicists FTEs Existing Resources 1Q06Delivery to date Disk used 1Q06Summary Tier-2LHC OnlyKSI2KTB KSI2K Hrs TB MinMaxAve London4026%1049.037.727%1,348,23639%17.921% 39%28% NorthGrid3322%1783.1132.248%1,229,27136%34.240%22%48%36% ScotGrid149%354.044.610%187,4435%21.024%5%24%12% SouthGrid6643%516.448.415%661,08019%13.415% 43%23% Total 15 2 3702.5262.9 3,426,030 86.6 ~35% ~10% ~20%

6 Slide 6 Steve Lloyd GridPP16 Introduction Example ATLASCMSLHCbOther London0.250.750.100.30 NorthGrid0.500.000.200.40 ScotGrid0.150.000.300.10 SouthGrid0.100.250.400.20 CMS Requirement in 2008 is 1800 KSI2K and 400 TB Tier-2 sharing matrix: (Part of) Institute sharing matrix: ATLASCMSLHCbOther Brunel0.000.100.000.15 Imperial0.000.901.000.00 QMUL0.700.00 0.60 RHUL0.200.00 0.15 UCL0.100.00 0.10 i.e Imperial allocation is 1800 KSI2K (400 TB) x 0.75 x 0.9 = 1215 KSI2K (270 TB) (PMB/Tier-2 Board) (Tier-2 Board)

7 Slide 7 Steve Lloyd GridPP16 Introduction Crosscheck:

8 Slide 8 Steve Lloyd GridPP16 Introduction Hardware Costs (Agreed by CB) CPU (KSI2K) 200720082009201020112012 Requirement 756010215145221820321708 Amount paid for15592106299437534476 Unit Cost£0.392k£0.312k£0.247k£0.175k£0.124k£0.087k Cost £k£612k£656k£740k£656k£553k£0k Total (inc Disk)£1,163k£1,295k£1,383k£1,282k£1,120k£0k Take requirement in following year 7560 divided by the lifetime in years (4.85 CPU, 3.9 Disk) = 1559 Multiply by the unit cost in that year £0.392k/KSI2K = £612k Similarly for disk. Up to institutes how they spend it (new kit, replacement kit, power, central services … )

9 Slide 9 Steve Lloyd GridPP16 Introduction Similar procedure used to allocate manpower (by the Tier-2 Board) Crosscheck:

10 Slide 10 Steve Lloyd GridPP16 Introduction Procedure Dave Britton has sent an individual email to each PI with their manpower allocations (including MSN and other posts) plus their nominal hardware allocation (if they want it) Each institute should apply for these resources via JeS Preparing a further email about JeS details We assume Hardware Support posts attract fEC No explicit running costs (Can of Worms)

11 Slide 11 Steve Lloyd GridPP16 Introduction TimeLine 200620082007 Now (GridPP16) GridPP3 Proposal Submitted July 13 GridPP2GridPP2+ GridPP3 End of GridPP2 (31 August 2007) Start of GridPP3 (1 April 2008) First LHC Collisions November 2007 14TeV LHC Collisions Spring 2008 900GeV 14TeV LHC:


Download ppt "Welcome to the 16 th GridPP Collaboration Meeting Introduction GridPP3 Project Leader GridPP3 Proposal Tier-2 Funding Timeline Steve Lloyd, Chair of the."