Presentation is loading. Please wait.

Presentation is loading. Please wait.

Exercise (4). Exercise Assume the following jobs are executed with one processor, with the jobs arriving in the order listed in the table. – Suppose a.

Similar presentations


Presentation on theme: "Exercise (4). Exercise Assume the following jobs are executed with one processor, with the jobs arriving in the order listed in the table. – Suppose a."— Presentation transcript:

1 Exercise (4)

2 Exercise Assume the following jobs are executed with one processor, with the jobs arriving in the order listed in the table. – Suppose a system uses FCFS scheduling. Create a Gantt chart illustrating these processes. – What is the turnaround time for process p 3 ? – What is the average waiting time for processes? – How about Shortest-Job-Next (SJN) scheduling? 2 i  (p i ) 080 120 210 320 450

3 3 p1p1 p2p2 p3p3 Avg. waiting time of FCFS is: i  (p i ) 080 120 210 320 450 p0p0 p4p4 0 Avg. waiting time of SJN is: 0 FCFS: SJN: Turnaround time of process p 3 with FCFS: Turnaround time of process p 3 with SJN:


Download ppt "Exercise (4). Exercise Assume the following jobs are executed with one processor, with the jobs arriving in the order listed in the table. – Suppose a."

Similar presentations


Ads by Google