Presentation is loading. Please wait.

Presentation is loading. Please wait.

C S S Innerbelt Bridge Contract Group 2 Tremont and Gateway Design Review / Planning Commission.

Similar presentations


Presentation on theme: "C S S Innerbelt Bridge Contract Group 2 Tremont and Gateway Design Review / Planning Commission."— Presentation transcript:

1 C S S Innerbelt Bridge Contract Group 2 Tremont and Gateway Design Review / Planning Commission

2 C S S March 7, 2012Aesthetics Kickoff April 18, 2012Internal Team Meeting May 2, 2012Internal Team Meeting/Review May 10, 2012Tremont and Towpath Trail Focus Group May 10, 2012Gateway Focus Group June 13, 2012Tremont and Towpath Focus Group June 13, 2012Gateway Focus group June 28, 2012Gateway Focus Group Special Meeting July 10, 2012CCG2 Public Meeting July 11, 2012Tremont and Towpath Focus Group July 11, 2012Gateway Focus Group July 19, 2012Cleveland Design Review Committee July 20, 2012Cleveland Planning Commission Schedule

3 C S S 2010 Winter Begin Construction Innerbelt CCG1 (WB Bridge) 2013 Fall Open CCG1 in Bi-directional Condition 2014 Winter Construction Completion CCG1 2014 Demolition of Existing Innerbelt Bridge 2015 Fall Begin Construction Innerbelt CCG2 (EB Bridge) 2018 Fall Construction Completion CCG2 Cleveland Innerbelt Construction Schedule

4 CLEVELAND INNERBELT PUBLIC ART Project Advisory Committee Janus Small Arts Consultant & Member of City of Cleveland Public Art Committee Diane Davis-Sikora Kent State School of Architecture & Member of City of Cleveland Public Art Committee Michael Christoff Architect, VOCON & Founder of Cleveland Design Competition and Pecha Kucha Cleveland Tom Starinsky Historic Gateway District Development Corporation Kristen Trolio Tremont West Development Corporation Kristin Rogers Progressive Insurance Art Collection & practicing local artist Lizzy Lee RUL graphic design & practicing local artist Angelica Pozo local artist & Tremont resident

5 CLEVELAND INNERBELT PUBLIC ART OUTREACH & PUBLICITY OF RFQ Postcards were mailed to 3,700 local and national artists. Promoted on several blogs, through the Public Art Network professional association, on Twitter, Facebook, and our website. Written about in The Plain Dealer and presented on local news. Informational session held at LAND studio office on November 8, 2011. Over 60 artists attended. ARTIST SUBMISSION INFORMATION 152 artist submissions 26 from City of Cleveland proper 42 from Cuyahoga County 14 from Northeast Ohio 3 from Ohio 67 from USA & Puerto Rico WINNING ARTISTS Natalie Lanese, Cleveland native (working in Michigan) Eric Rippert, Cleveland Erin Guido, Cleveland

6 West 14 th Street Erin Guido Fairfield Avenue Eric Rippert Ontario Street Natalie Lanese

7 C S S CCG1 Improvements – Abbey Avenue

8 C S S Sustainability Overview – CCG1/CCG2 Green Bulkheads

9 C S S Sustainability Overview – CCG1/CCG2 Sustainable Storm Water Management Bioretention Vegetated Biofilters

10 C S S Sustainability Overview – CCG1/CCG2 LED Pedestrian and Architectural Lighting Sustainability Reporting

11 C S S Gateway LIGHTING AND SECURITY CAMERAS Carnegie St E 14 th St E 9 th St * * * * *

12 C S S 13 th STREET * W 14 TH STREET NB * * * Parking ABBEY AVENUE * * Tremont LIGHTING AND SECURITY CAMERAS

13 C S S Bicycle & Pedestrian Access The Sideyard Towpath Trail 13 th STREET ABBEY AVENUE W 14 TH STREET NB Urban Farm Blueberry Hill To Lorain-Carnegie Old Central Viaduct Interpretive Zone FAIRFIELD AVENUE Parking Tremont Terrace and Street Party W 14 TH ST ON RAMP Bike Lane Sidewalk Crosswalk

14 C S S CCG2 Tremont to Gateway 2012

15 C S S CCG2 Bridge 2012

16 C S S Tremont / Towpath Trail CCG1 WB Innerbelt (Under Construction) E 13 th Street Abbey Avenue W 14 TH Street NB CCG2 EB Innerbelt W 14 th Street SB Ramp B2 Fairfield Avenue University Avenue

17 C S S Tremont / Towpath Trail – CCG1 (2009) Existing Bridge Footprint Abbey Avenue CCG1 WB The Bowl University Ave

18 C S S Tremont / Towpath Trail – CCG1 and CCG2 The Sideyard Towpath Trail 13 th STREET ABBEY AVENUE W 14 TH STREET NB Urban Farm Cuyahoga Co BDD Blueberry Hill City Overlook Old Central Viaduct Interpretive Zone FAIRFIELD AVENUE Parking Tremont Terrace and Street Party W 14 TH ST ON RAMP

19 C S S CCG1 Improvements – City Overlook

20 C S S Tremont Sideyard NATURE PLAY Infiltration Swales Make gray paths lighter maybe Swale Vegetated Buffer Zone Fencing Vegetated Berm with Street Trees Primary Entrance Pending discussions with Cleveland Metroparks Underbridge Parking

21 C S S Tremont Section at Old Central Viaduct Interpretive Strategy

22 C S S Tremont views In Progress

23 C S S Tremont Towpath Section at Old Central Viaduct

24 C S S Tremont TERRACE / STREET PARTYTerrace STREET PARTY PLANTED BUFFER MOUNDS * * * * TERRACE W 13 th STREET STREET PARTY ABBEY AVENUE

25 C S S Wayfinding Terrace STREET PARTY PLANTED BUFFER MOUNDS * * * * * * * *

26 C S S

27

28 Tremont / Towpath Trail – CCG1 and CCG2 The Sideyard Towpath Trail 13 th STREET ABBEY AVENUE W 14 TH STREET NB Urban Farm Cuyahoga Co BDD Blueberry Hill City Overlook Old Central Viaduct Interpretive Zone FAIRFIELD AVENUE Parking Tremont Terrace and Street Party W 14 TH ST ON RAMP

29 C S S Gateway BASIC PLAN Ontario Ave Carnegie St E 14 th St E 9 th St

30 C S S Gateway Components Ontario Ave Carnegie St E 14 th St E 9 th St Entry Wall Infield Boulevard

31 C S S Gateway OVERALL PLAN

32 C S S Gateway OVERALL PERSPECTIVE

33 C S S Boulevard EXISTING SITE Cleveland Black Oxide City View Ramp B4 E 14 th St E 9th St Ontario St Cleveland Black Oxide

34 C S S Trees – 750 FROM VIADUCT AT E 9 TH ST., SUMMER

35 C S S Trees 750 FROM VIADUCT, AT E 9 TH ST., WINTER

36 C S S Trees AERIAL VIEW TOWARD TERMINAL TOWER

37 C S S Trees 250 FROM VIADUCT

38 C S S Infield TERRACED with SLOPES

39 C S S Infield TERRACED with SLOPES Potential planted species for colored bands need to be identified.

40 C S S Gateway Components ENTRY WALL and PORTALS Ontario Ave Carnegie St E 14 th St E 9 th St

41 C S S Wall

42 C S S Ontario East 9th Portals DIMENSIONS / PROPORTIONS 177 80 38 37 17 21

43 C S S City / Landscape

44 C S S Portal ONTARIO

45 C S S Portal EAST 9 TH

46 C S S Portal EAST 9 TH ROCK OPTIONS Music Media Alan Freed / Rock n Roll Cleveland Artists

47 C S S Gateway OVERALL

48 C S S Thank you THANK YOU


Download ppt "C S S Innerbelt Bridge Contract Group 2 Tremont and Gateway Design Review / Planning Commission."

Similar presentations


Ads by Google