Presentation is loading. Please wait.

Presentation is loading. Please wait.

Presentation of the RBM Partnership Harmonized Work Plan 2008 RBM Partnership 13 th Board Meeting Nov 28-29, 2008, Addis Ababa Prepared in Coordination.

Similar presentations


Presentation on theme: "Presentation of the RBM Partnership Harmonized Work Plan 2008 RBM Partnership 13 th Board Meeting Nov 28-29, 2008, Addis Ababa Prepared in Coordination."— Presentation transcript:

1 Presentation of the RBM Partnership Harmonized Work Plan 2008 RBM Partnership 13 th Board Meeting Nov 28-29, 2008, Addis Ababa Prepared in Coordination with the RBM Partnership Secretariat by FSG Social Impact Advisors

2 2 I.Harmonized Work Plan (HWP) - Introduction II.Synthesis of HWP III.Funding for HWP Agenda

3 3 The 2007 Malaria Landscape Report Emphasizes the Urgency to Accelerate the Actions towards Achieving RBM Goals The Harmonized Workplan responds to the need of scaling-up for impact Source:RBM Landscape report 2007 There is a continued need for large inflows of resources to actualize country plans to scale- up for impact Advocacy for additional resources Building in-country health capacity to absorb funds Findings from the reportNeeds to be addressed Evidence suggests that real breakthroughs in coverage and rapid scale-up can be made through integrated nationwide distribution campaigns Managerial support and expertise to assist countries in the selection/development of sustainable delivery models While supportive national governments, high health worker density, nationwide advocacy campaigns and small size of countries favor progress in countries, key enablers and success stories need to be further understood Understanding and building success stories Campaigning to build on expertise on behavioral change in communities Advocating for and building a stronger civil society and grass root organization infrastructure for long-term sustainability Building and improving M&E infrastructure for better quality of malaria data Data available is not always consistent or up- to-date Advocating for and assisting countries to plan for SUFI While many countries have planned for SUFI, there is a high level of inconsistency in their understanding and levels of ambition

4 4 RBM Sec. Built on the Change Process and Coordinated the Generation of HWP with Buy In from All Members Workplan harmonization process During the workshop in which all the WGs and SRN delegates participated With comments and involvement from RBM sec. RBM sec. and FSG Captured each group’s work plans Grouped the activities around major partnership actions Discussed the synthesized workplan with the groups All RBM working groups and SRNs developed respective work plans for the coming year RBM Sec. hired FSG Social Impact advisors to put together the Harmonized work plan AugustSeptemberOctober/November Discussed and reviewed the harmonized workplan Checked completeness of activities; how they interfaced and sequenced Launched a budget validation process Revised work plan and budgets based on inputs from the WGs and SRNs Developed work plan synthesis for the board Developed funding scenarios for the 2008 budget July

5 5 I.Harmonized Work Plan (HWP) - Introduction II.Synthesis of HWP III.Funding for HWP Agenda

6 6 Support countries to rapidly expand access to effective treatment and prevention against malaria nationwide; Improve management and healthcare systems to ensure that short-term gains can be sustained in the medium- to long-term; Maintain malaria high on the development agenda using a results-oriented evaluation framework; Provide a comprehensive research agenda, ranging from product development to implementation strategies. RBM Defined Three Strategic Priorities for 2006-2010 in the RBM Global Strategic Plan This is the context in which the board approves activities Action at country level Action at country level Global advocacy and finance Research and development

7 7 RBM Has Defined Six “Operational” Priorities and Targets for 2008 Strengthen Access to Commodities for Malaria Control 5 Keep Malaria High on the Development Agenda and Access Additional Resources 2 Enhance Performance in Countries and Secure Continued Resources 3 Track country progress 4 Strengthen Capacity and Enhance Performance for SUFI Implementation 1 Ensure Proper Functioning of Partnership Mechanisms 6 These priorities were defined on the basis of RBM Global Strategic Plan

8 8 RBM HWP ‘08 Objectives Re-Emphasize RBM Strategic Priorities By 2010, particularly in the lowest two economic quintiles: 80% of people at risk from malaria are protected 80% of malaria patients are diagnosed and treated with effective anti-malarial medicines In areas where transmission is stable, 80% of pregnant women receive intermittent preventive treatment (IPT) Malaria burden is reduced by 50% compared with 2000 RBM Targets 2010 RBM 2010 Targets Action at country level Support countries to rapidly expand access to effective treatment and prevention against malaria nationwide; Improve management and healthcare systems to ensure that short-term gains can be sustained in the medium- to long- term Global advocacy and finance Maintain malaria high on the development agenda using a results- oriented evaluation framework Research and development Provide a comprehensive research agenda, ranging from product development to implementation strategies RBM Strategic Priorities for 2005-2015 (2006-2010 Shown Below) abc RBM Goals as laid out in the Global Strategic Plan Strengthen Capacity and Enhance Performance for SUFI Implementation Enhance Performance in Countries and Secure Continued Resources (through diagnostic and corrective response) Track country progress Ensure proper functioning of partnership mechanisms and provide stewardship RBM Workplan Objectives 2008 Access additional resources (incl. through GFATM, UNITAID) Strengthen Access to Commodities for Malaria Control Ensure proper functioning of partnership mechanisms and provide stewardship RBM Workplan Objective 2008 Strengthen Capacity and Enhance Performance for SUFI Implementation Strengthen Access to Commodities for Malaria Control Ensure proper functioning of partnership mechanisms and provide stewardship RBM Workplan Objective 2008 RBM Workplan Objective s for 2008 1 3 4 6 2 5 6 1 5 6

9 9 Ensure Proper Functioning of Partnership Mechanisms HWP Synthesis by Priorities and Targets Priorities Targets for 2008 Strengthen Access to Commodities for Malaria Control 5 An affordable facility for Malaria in place At least three (3) integrated (ITN/immunization) mass distribution campaigns, of which one should be held in a large country; 45 countries have access to affordable medicines for malaria through the private sector Keep Malaria High on the Development Agenda and Access Additional Resources 2 Enhance Performance in Countries and Secure Continued Resources (through diagnostic and corrective response) At least 95% of countries currently getting funding should continue to keep it At least 80% of countries with existing Global Fund assistance should perform at "A" or “B1” ranking 3 Strengthen Capacity and Enhance Performance for SUFI Implementation 45 technically sound, operationally feasible,country and partner owned SUFI business plans Support deployment of partnership coordinators in 10 countries Track country progress 4 1 6 Track progress and report to the EC and the partnership Board Partnership achieves > 80% implementation rate of planned activities of the HWP 12-20 countries to deploy MIS Publish Malaria Landscape report and update 107 country profiles >60% of countries applying for funding in Round8 (GFATM) to be successful 45 Countries mobilize adequate funds for SUFI Budget for 2008 USD 8.4 Million USD 7.2 Million USD 6.7 Million USD 1.2 Million USD 2.4 Million USD 4.3 Million

10 10 Involvement Mechanisms RBM Priorities for 2007-2008 HWG SRN MAWG MERG MIP PSM WIN RWG AMFM RBM Secretariat RBM Secretariat Strengthen Capacity and Enhance Performance for SUFI Implementation Keep Malaria High on the Development Agenda and Access Additional Resources Enhance Performance in Countries and Secure Continued Resources (through diagnostic and corrective response) Track Country Progress Strengthen Access to Commodities for Malaria Control Ensure Proper Functioning of Partnership Mechanisms Board Other Cross Cutting Activities 1 2 3 4 5 6 The Involvement of Partnership Mechanisms Differs by Objective

11 11 Strengthen Capacity and Enhance Performance for SUFI Implementation 1 Support Best Practices MIP HWG SRN MAWG MERG RBM Secretariat WIN RWG Advocate for Country planning Support Country Planning Establish taskforce on community use Make progress on: M&E training course Service coverage estimates, IRS indicator guidelines, field testing of anemia and lab testing of parasitemia, spectrum mortality modeling software Assessment of quality of malaria data for GFATM, secondary analysis of MICS, DHS, MIS, standardization of priority indicators, database on priority indicators, rating system for data source, public access to datasets Develop and finalize: Technical updates on IPT, case management of malaria in pregnancy, MIP implementation guide Consensus statement on ITN delivery through ANC, synthesis of country level MIP implementation experiences and best practices from RAOPAG countries Operations research for increasing access to MIP interventions, incl. community delivery, MIP M&E framework, Global MIP Strategic framework Document: Best practices in scalable malaria vector control, cochrane review, Private sector approaches to scaling up IRS Bridging “catch up” campaigns to “Keep up” campaigns Guidance framework for scaling up LLINs and IRS Coordinate review and publication of NHA malaria sub- account guidelines Compile toolkits developed by WGs and partners planning, resourcing, implementing and M&E Enable peer-to-peer knowledge sharing incl. finalizing regional joint work plans and organizing study tours Promote the need for and use of good quality TA Equip 2 sub-regional MIP coalitions Support gap analyses in 45 countries Support SRNs in developing new plans Support HWG in gap analyses, business planning for SUFI in 45 countries Support deployment of partnership coordinators in 10 countries Promote: HWG and validation of country plans, “three ones” approach, malaria representation on CCM Provide management support, expert advice, interfacing, documentation & event support towards WG and SRN workplan implementation Provide support to joint & country missions Provide expert advice to SWOT analyses and deployment Support MAWG WP implementation Develop & update website, publish factsheets, e- brochure, e-updates regarding consensus on best practices

12 12 Keep Malaria High on Development Agenda and Access Additional Resources 2 AMFM RWG MIP HWG SRN Support proposal writing RBM Secretariat PSM WIN MAWG Advocate for and mobilize resources Support GFATM proposal development: Increase percentage of successful applications to GFATM from 32% in R6 to >60% in R8, publish evaluation of R7 GFATM campaign Support HWG managed proposal development Provide TA to PSM portions of proposa Assist countries to develop PSM plans Provide TA to WIN portions of proposal Provide support to proposal development: support 10 countries in GFATM proposal writing, identify MIP related gaps based on past proposals, develop generic template to be used by countries for R8 Support project development: support country requests for additional resources, TA to 5 countries to expand existing projects, present business case to donors at country and global levels Support R7 (~20) approved countries in developing M&E and PSM plans Support countries with successful grant application in grant negotiations Advocate at global levels global resource gaps resulting from gap analyses from R7 and business case to donors Advocate for additional resources: Develop RBM brand, develop messages to support funding and malaria research, marketing material and congressional briefings Organize member visits, participate in GFATM meetings, identify new sources of funding Advocate to country governments on increased malaria spending, engage celebrity spokes persons for malaria Ensure PSM issues are incorporated in MAWG advocacy messages Identify 3 champions to support MAWG Design innovative approaches to financing malaria control incl. ACT Raise awareness to create political support for ACT subsidy project Management support to HWG for partners development of funding proposals Management support to SRN’s in grant negotiations Interface between WGs and CCMs in support of grant negotiations Support MAWG WP implementation Manage media outreach, promotional events, attend relevant meetings, advocate for greater resources

13 13 Enhance Performance in Countries and Secure Continued Resources PSM WIN HWG SRN MAWG RBM Secretariat Support Operations 3 Develop launch and implement the “Malaria Implementation Assistance” Hotline and Early Warning System (EWS) Manage identification of country level implementation bottle necks for EWS and for GFATM phase2 renewal countries Communicate success of partners in relation to EWS Facilitate provision of TA to fix PSM bottlenecks identified as a result of EWS Develop, launch and implement Malaria Implementation Support Team (MIST) embedded within partner organizations Build in-country structures and functions: Strengthen partnership structures in countries, mobilize external TA promote internal contracting out of services Assist in advocacy: advocacy for PSM for better procurement and supply chain management, advocate for improving performance of existing funds, interfacing with WIN on advocacy on taxes and tariffs for IRS Serve as a link, create and maintain PSM roster to find appropriate resources Advance implementation guidelines of IRS and LLIN including identifying operational constraints, report on taxes and tariffs, registration with national authorities and washing habits Track Country Progress 4 SRN MAWG MERG Analyze data/report on landscape HWG Provide MIST support to assist countries in M&E Support MERG in MIS implementation, compile and disseminate bi-annual country progress reports Support MIP to strengthen capacity of MIPESA and RAOPAG Promote tools created by HWG and MERG, advocate for improved M&E capacity at country level and build advocacy strategies by using results generated by MERG database Support in generation of Malaria Landscape report Coordinate generation of maps/ reports: Malaria endemicity, disease burden, population at risk, effect of scaling up interventions for upto1 0 countries based on MIS survey data, malaria mortality estimation MIP Strengthen capacity of MIP coalitions to provide technical support for monitoring progress in MIP implementation in countries and to assist countries to incorporate MIP indicators into Maternity registers and cards Interface with CCM’s & SRN’s to diagnose implementation bottlenecks Provide management support to HWG WP implementation for appropriate MIST response Support implementation of MIST (incl. Recruitment of MIST coordinator) Provide expert advice and interfacing towards production of the Malaria Landscape Publicize and disseminate Malaria Report Support performance sub-committee in tracking progress RBM Secretariat

14 14 Strengthen Access to Commodities for Malaria Control RWG AMFM Develop and launch AMFm RBM Secretariat HWG PSM MAWG 5 Provide implementation support to ACT implementation based on information from HWG managed needs assessment and refined strategic/action plans and through MIST structures present in countries Advocate and create awareness for ACTs Review M&E plans for global subsidy and support AMFM in analytic work needed for the launch of subsidy Create technical proposal with key recommendations on subsidy levels incl. estimate of funding, criteria for facility architecture and communication strategy to promote uptake and responsible introduction of ACTs Raise awareness and create political support for ACT subsidy and mobilize necessary resources Support MAWG for AMFm launch Secure global supply Facilitate and develop: Facilitate forecasting efforts Map global ACT market Disseminate quality standards for medicines Secure country absorption Develop procurement guidelines for ACTs, RDTs, IRS and LLINs Facilitate collection of PSM toolbox and success stories Develop ACT scaling up framework Implement delay monitoring system Establish PSM country coordination committees Provide management support and expert advice to PSM for WP implementation and to ensure effective roll-out of AMFm Measles Malaria Partnership targeting at least 3 integrated mass distribution campaigns including at least 1 large country

15 15 HWG SRN MAWG MERG MIP PSM WIN RWG Coordinate HWG workplan Organize two meetings Operationalize SRNs Hold one annual and two executive meetings Provide secretariat support Hold two meetings Conduct activities for MERG secretariat Hold two meetings Support MIP participation in annual planning and review meetings/ WG meetings Convene two meetings Facilitate meetings Hold one meeting RBM Secretariat Improve local advocacy and communications Ensure Proper Functioning of Partnership Mechanisms 6 Cross cutting activities 1-6 Support Implementation of the 2008 HWP: Provide expert advice, interfacing and management support to RBM Board, Executive Committee, sub-committees, Executive Director, WG co- chairs/SRNs, partners and constituencies: to ensure the timely implementation of the 2008 HWP, and the effective functioning of the mechanisms as outlined in the RBM handbook to support timely progress tracking to advocate and mobilize resources for the partnership, including producing advocacy materials, organizing events, preparing materials, organizing press relations, champion trips and involvement, etc RBM Secretariat Provide event support and interfacing for all key WG & SRN meetings Nurture the expansion of the RBM partnership’s activities: Develop and manage knowledge management and partnership communication mechanisms Manage the RBM Secretariat: Manage Human Resources requirements (appoint and manage staff and focal points to all mechanisms and structures, such as SRN focal points, US-based Secretariat, etc) Provide Secretariat financial management, recruitment and career development, and administrative support Manage hosting agency relationship Develop Secretariat workplan and budget Produce management reports

16 16 I.Harmonized Work Plan (HWP) - Introduction II.Synthesis of HWP III.Funding for HWP Agenda

17 17 WGs/ SRNs need a budget of ~ USD 23Million, > 50% of which is for direct in-country support RBM Sec. needs a budget of ~ USD 10Million, more than ~70% of which to support HWP and 30% to continue nurturing the partnership 4 priorities need budgets more than USD 4 Million each: –Strengthen capacity for SUFI implementation –Access additional resources –Enhance performance in countries –Ensure proper functioning of the partnership Activities can commence in 2007 provided a budget of USD 3.5 Million can be secured ASAP, of which HWG and SRNs account for more than 70% of the budget These numbers will evolve, as the WGs and SRNs are reviewing their work plans following the recommendations from the Executive Meeting of the RBM Partnership Board in Seattle to revisit the plan to achieve 80% coverage by 2010 WGs and Secretariat Require USD 33 Million to Implement Activities Planned in HWP 08 To achieve elimination/eradication of malaria, it is vital that the HWP be fully funded

18 18 MIPWINRWGRBM Mechanisms RBM SecTotal Budget 2008 Workplan Budget Overview by RBM Mechanisms HWGSRNsPSMMERGMAWG 40 20 5.4 EARN CARN SARN WARN 2008 Budget USD Millions Source:RBM partnership work plans, FSG analysis

19 19 Strengthen capacity for SUFI implementation Access additional resources Enhance performance in countries and secure continued resources Track country progress Strengthen access to commodities for malaria control 2008 Budget Million USD Priorities from HWP Ensure proper functioning of the partnership Cross cutting activities Total Workplan Budget Overview by Objective 35 1 2 3 4 5 6 Source:RBM partnership work plans, FSG analysis

20 20 Priorities from HWP Total Workplan Budget Overview by Sub-Priority Best practices Country planning (CP) Advocacy on CP Proposal writing Resource mobilization 35 Strengthen capacity for SUFI implementation 1 Access additional resources 2 Enhance performance in countries and secure continued resources Track country progress Strengthen access to commodities for malaria control Ensure proper functioning of the partnership Cross cutting activities 3 4 5 6 2008 Budget USD Millions Source:RBM partnership work plans, FSG analysis 17.5

21 21 RBM Mechanisms Require ~ USD 33 Million in 2008 for Implementing Activities in HWP WGs, SRNs RBM Sec. 5 30 10 15 20 25 RBM Mechanisms Total Budget 2008 Budget needed for activities in 2007 2008 Budget USD Millions 35 Source:RBM partnership work plans, FSG analysis 40

22 22 HWP 08PartnershipCategory of RBM Sec Support 2008 Budget USD Millions Board and Constituencies 5 10 Total 2008 > 50% of RBM Sec Budget Requested to Support HWP Source:RBM partnership work plans, FSG analysis

23 23 Based on past experience, ~ USD 14 Million of funds can be raised for the 2008 budgets, leading to a USD 20 Million gap for which new sources of funding need to identified For the activities that can commence in 2007, ~ USD 1.7 Million of funding needs to be identified Seattle meeting highlights a positive outlook on funding To achieve elimination/eradication of malaria, it is vital that the HWP be fully funded Development of funding scenarios may be inefficient at this stage

24 24 For 2008 HWP Needs A Budget of USD ~33 Million of Which <50% Can Be Funded Based on Past Funding Levels Expected 2008 Funds raised by RBM mechanisms 100% = USD 32.8 Million An expected additional USD20 Million of funds need to be raised Note: Based on 2007 fundraising figures of RBM Secretariat Source:RBM Secretariat Gap RBM Sec SRNs Partners 9M 1M 3M 20M


Download ppt "Presentation of the RBM Partnership Harmonized Work Plan 2008 RBM Partnership 13 th Board Meeting Nov 28-29, 2008, Addis Ababa Prepared in Coordination."

Similar presentations


Ads by Google