INFO 637Lecture #21 Software Engineering Process II TSP Roles and Overview INFO 637 Glenn Booker.

Similar presentations


Presentation on theme: "INFO 637Lecture #21 Software Engineering Process II TSP Roles and Overview INFO 637 Glenn Booker."— Presentation transcript:

1 INFO 637Lecture #21 Software Engineering Process II TSP Roles and Overview INFO 637 Glenn Booker

2 INFO 637Lecture #22 TSP Roles The PSP had you doing pretty much everything yourself – a veritable jack (or jill) of all trades The TSP breaks roles down so that each leadership function can be more specialized While each role represents about one person for class, in reality some roles may need more than one person to fulfill them

3 INFO 637Lecture #23 TSP Roles The leadership roles are:  Team Leader  Development Manager  Planning Manager  Quality and Process Manager  Support Manager

4 INFO 637Lecture #24 TSP Roles When choosing roles within your project, consider  What roles have you done before?  What roles interest you?  What roles do you think you can do? Consider the possibility of stretching your skills – try a role which is unlike any you’ve done before!

5 INFO 637Lecture #25 Development Engineer In addition to one of the previous roles, everyone is also a Development Engineer  This is a really important point! Hence you will be producing your own products (code, documents, etc.) and fulfilling one of the leadership roles on slide #3

6 INFO 637Lecture #26 Development Engineer Activities This means that during your project, you need to:  Record your time in the time recording log (LOGT)  Enter the week number when each task is completed  Update TASK and SCHEDULE templates  Record all defects for your products in your defect recording log (LOGD)

7 INFO 637Lecture #27 Development Engineer Activities  Enter the size of each product or component  Submit updated copies of completed TASK, SCHEDULE, and WEEK forms to the planning manager and the instructor at the start of each week  When you complete a system or component task, update the SUMP and SUMQ forms and give copies to the quality/process manager and the instructor

8 INFO 637Lecture #28 Development Engineer Activities  Report all changes in configuration-controlled components to the support manager  Report issues to be tracked to the support manager for the issue tracking log (ITL)  Above all, examine your data and use it to help you produce quality work!

9 INFO 637Lecture #29 Team Leader Goals The team leader is the equivalent of the project manager for the team Goals of the team leader include:  Be a cooperative and effective team member  Build and maintain an effective team  Motivate all team members to work aggressively on the project

10 INFO 637Lecture #210 Team Leader Goals  Resolve all the issues team members bring to you  Keep the instructor fully informed about the team’s progress  Perform effectively as the team’s meeting facilitator

11 INFO 637Lecture #211 Team Leader Skills Needed You enjoy acting as the leader You are able to identify key issues and make objective decisions You can take unpopular positions and can push people to do difficult tasks You respect the people you are leading

12 INFO 637Lecture #212 Team Leader Activities Motivate the team to perform their tasks Run the weekly team meeting Report weekly status Help the team to allocate tasks Act as a facilitator and timekeeper for team meetings Maintain the project notebook

13 INFO 637Lecture #213 Team Leader Activities Lead the team in producing the development cycle report Act as a development engineer

14 INFO 637Lecture #214 Development Manager Goals The development manager is the leader for creating the product itself – sort of the software architect Their goals are:  Be a cooperative and effective team member  Produce a superior product  Fully utilize the team members’ skills and abilities

15 INFO 637Lecture #215 Development Manager Skills You like to build things You want to be (or are!) a software engineer and want to lead design and development for a product You are a competent designer  You are familiar with design methods You are will to listen to and use others’ ideas

16 INFO 637Lecture #216 Development Manager Activities Lead producing the development strategy Lead producing the preliminary size and time estimates for the products Lead development of the software requirements specification Lead producing the high level design Lead producing the software design specifications

17 INFO 637Lecture #217 Development Manager Activities Lead implementing the product Lead developing the test plans Lead developing the test materials and running the tests Lead producing the product user’s documentation

18 INFO 637Lecture #218 Development Manager Activities Participate in producing the development cycle report Act as a development engineer

19 INFO 637Lecture #219 Planning Manager Goals The planning manager is responsible for managing the plan for your project Their goals are:  Be a cooperative and effective team member  Produce a complete plan for the team, and for each team member  Accurately report team status every week

20 INFO 637Lecture #220 Planning Manager Skills You have a logical and orderly mind You tend to plan your work when you can You like process data, and feel better if you know if you’re on schedule You think planning is important, and can help your teammates track and measure their work

21 INFO 637Lecture #221 Planning Manager Activities Lead producing the task plan for each development cycle Lead producing the schedule for each development cycle Lead producing the balanced team development plan Track the team’s progress against the plan

22 INFO 637Lecture #222 Planning Manager Activities Participate in producing the development cycle report Act as a development engineer

23 INFO 637Lecture #223 Process and Quality Manager Goals This role is to ensure the TSP process is being followed, and to verify the quality of your team’s products Their goals are:  Be a cooperative and effective team member  Ensure team members correctly report and use TSP process data

24 INFO 637Lecture #224 Process and Quality Manager Goals  Ensure team follows the TSP quality plan and produces a quality product  Ensure team inspections are properly moderated and reported  Ensure team meetings are accurately reported, and reports are put in the team notebook

25 INFO 637Lecture #225 Process and Quality Manager Skills You are concerned about software quality You are interested in process and product measurements You are aware of inspection and review methods You can give constructive reviews

26 INFO 637Lecture #226 Process and Quality Manager Activities Lead producing and tracking the quality plan Alert team leader and instructor if there are quality problems Lead defining and documenting team processes and conducting process improvement

27 INFO 637Lecture #227 Process and Quality Manager Activities Establish and maintain the team’s development standards Review and approve all products before their submission to the Configuration Control Board (CCB) Act as the team’s inspection moderator Act as a recorder in all team meetings

28 INFO 637Lecture #228 Process and Quality Manager Activities Participate in producing the development cycle report Act as a development engineer

29 INFO 637Lecture #229 Support Manager Goals The support manager is focused mostly on configuration management and risk management Their goals are:  Be a cooperative and effective team member  Ensure the team has tools and methods needed to support their work

30 INFO 637Lecture #230 Support Manager Goals  Ensure only authorized changes are made to baselined products  Ensure team’s risks and issues are recorded in the issue-tracking system, and reported each week  Ensure team meets its reuse goals during the development cycle

31 INFO 637Lecture #231 Support Manager Skills Lead determining support needs and obtaining needed tools and facilities Chair the CCB and manage the change control system Manage the configuration management system Maintain the system glossary

32 INFO 637Lecture #232 Support Manager Skills Maintain team’s issue- and risk-tracking system Act as team’s reuse advocate Participate in producing the development cycle report Act as a development engineer

33 INFO 637Lecture #233 Common Features Notice that every role has the common goal of:  Be a cooperative and effective team member All roles have the activity, as mentioned previously, of:  Act as a development engineer

34 INFO 637Lecture #234 Common Features And most roles also have the activity  Participate in producing the development cycle report So the challenge of teamwork is to balance shared tasks with role-specific ones, and still produce a viable product along the way!

35 INFO 637Lecture #235 Team Size Considerations As noted on page xiv of the Preface:  If your team has four people, the support manager activities get divided among everyone  If your team has five people, each person gets one leading role  If your team has six people, the quality and process manager role is split in two; quality manager and process manager

36 INFO 637Lecture #236 TSP Overview

37 INFO 637Lecture #237 Iterative Approach The TSP is based on an iterative approach, where cycles are used to develop major parts of the product incrementally We’ll follow the first cycle only, and then see how things would follow for subsequent cycles

38 INFO 637Lecture #238 TSP Overview The Team Software Process has eight steps or phases  Launch  Development Strategy  Development Plan  Define Requirements  Design  Implementation

39 INFO 637Lecture #239 TSP Overview  Integration and System Testing  Postmortem We’ll skim the first seven of these this week, before working through one cycle At the end of the course, we’ll do the postmortem and address miscellaneous teamwork issues

40 INFO 637Lecture #240 Launching a Team Project The use of a formal launch step helps ensure roles are clearly assigned, and allows conscious team building to take place Script for this step includes:  Understand your product’s objectives  Develop team and individual goals  Conduct an initial team meeting to establish roles and initial due dates

41 INFO 637Lecture #241 Development Strategy This is the earliest planning stage in the TSP, where a conceptual plan, development strategy, and estimates are developed Risk assessment is also done, and the configuration management plan is drafted These tasks are needed to obtain commitment to the project before further investigation is done

42 INFO 637Lecture #242 Development Strategy Script includes:  Define the strategy criteria; what product, process, and quality criteria can be defined, in spite of minimal product knowledge?  Produce the conceptual design; outline what the product will be like  Select development strategy; when will different kinds of functions be created?

43 INFO 637Lecture #243 Development Strategy  Produce preliminary size and time estimates  Identify and evaluate risks  Produce configuration management (CM) plan

44 INFO 637Lecture #244 Development Plan This is a project management plan, to help make sure the right steps are done in the right order We need to define, in detail, what will be done and who’ll do it Need to balance workload so people are well utilized

45 INFO 637Lecture #245 Development Plan Tasks include:  Start with size estimates  Produce task plan  Produce schedule plan  Produce the quality plan  Produce engineer plans for each person  Balance the workload for the sake of fairness and efficiency

46 INFO 637Lecture #246 Define Requirements This is definition of the software requirements specification (SRS) Defines what the product will be able to do, and how well it will be able to do it (speed, reliability, etc.) Key objective is to ensure that your product will meet the customer’s needs

47 INFO 637Lecture #247 Define Requirements Clear requirements also form the basis for the change control system, which manages changes in the requirements Steps include:  Clarifying the product needs  Define and document requirements  Develop system test plan, to prove requirements were met

48 INFO 637Lecture #248 Define Requirements  Do formal verification of requirements and test plan  Verify requirements with customer

49 INFO 637Lecture #249 Design The TSP is not limited to any particular design methodology (object oriented, information engineering, etc.) Hence each team needs to choose the design method for their project Design elaborates on the conceptual design This step is only high level design

50 INFO 637Lecture #250 Design Design is usually based on breaking a system down into components Then the requirements for each component are determined Keep breaking down components until they are small enough to be easily understood, and created by one person

51 INFO 637Lecture #251 Design Steps include:  Develop high level design  Apply design standards  Document design  Allocate design tasks to team members  Create integration test plan  Inspect design and integration test documents

52 INFO 637Lecture #252 Implementation Implementation is the coding step (which may have been called the Construction phase in other classes) Detailed designs figure out how each component can best be implemented Then using the designs as blueprints, the product is created, and unit tested

53 INFO 637Lecture #253 Implementation Steps include:  Define and allocate implementation tasks  Prepare detailed designs  Write unit test plan and test cases  Write the code  Conduct unit tests  Review results  Release component when passes review

54 INFO 637Lecture #254 Integration and System Testing Now that components have been created and unit tested, we can assemble them and do integration and system testing Recall that test plans were drafted in the requirements and design stages Here we’ll review test strategies, and address quality measures

55 INFO 637Lecture #255 Integration and System Testing Steps include:  Define and allocate test activities  Build the system  Integrate the system, and do integration testing  Conduct system testing  Document test results

56 INFO 637Lecture #256 Summary After system testing is passed, a postmortem meeting is held to:  Document the cycle,  Look for process improvement opportunities,  Evaluate our team, and  Revise our plans for the next cycle That’s the TSP in a nutshell (apologies to O’Reilly)