Presentation is loading. Please wait.

Presentation is loading. Please wait.

18 November 2004 Connecting the Dots: CAP- WSRP 1.

Similar presentations


Presentation on theme: "18 November 2004 Connecting the Dots: CAP- WSRP 1."— Presentation transcript:

1 18 November 2004 Connecting the Dots: CAP- WSRP 1

2 18 November 2004 Connecting the Dots: CAP- WSRP 2 Summary n Standards Meant to be Used Together. n Modular, Flexible Approaches will Find More Success than Single Vendor Solutions. n Promoting Adoption Necessary for Continued Development & Improvement. n New Standards Will be Needed in Foreseeable Future.

3 18 November 2004 Connecting the Dots: CAP- WSRP 3 Overview n The Evolution of Web Services n OASIS WSRP 1.0 Scopes Simple, Basic Functionality n CAP Approved April 2004 n CAP: Designed to Work with Web Services, Fits WSRP n CAP in WSRP=EA-SOA: Enterprise Architecture Using Service-Oriented Architecture n EMT Units Leveraging Power of Information - Locate Medical Resources, GIS, +

4 18 November 2004 Connecting the Dots: CAP- WSRP 4 XML: Ready to Start Connecting the Dots n Common Alerting Protocol 1.0 - CAP Approved OASIS Standard April 2004. n Web Services for Remote Portlet 1.0 - WSRP Approved OASIS Standard August 2003. n Despite Inconsistencies, XML Leads Open Standards Efforts.

5 18 November 2004 Connecting the Dots: CAP- WSRP 5 Complementary Standards Support Expansion of XML n ebXML Registry/Repository gains ‘Crossover’ Support from W3C. n UDDI & ebXML Reg/Rep Provide Discovery for Potential Partners. n SAML (moving to 2.0), WSS 1.0 Approved OASIS Standard April 2004 & XACML (also moving to 2.0), Stabilizing XML-based Security.

6 18 November 2004 Connecting the Dots: CAP- WSRP 6 Adopting Open Standards Necessary for Interoperability n Initial Standards Provide Starting Points, but... n Learning from Implementation Leads to Genuine Usability Refinements. n ‘Extensibility’ Key to Requirements for v. 2.x > (pre-testing).

7 18 November 2004 Connecting the Dots: CAP- WSRP 7 XML Ready for Phase 2: Harvesting Experience n Phase 1: Standards Process Provides Pattern - Use Cases > Requirements > Formal Standards. n Standards are not Standards unless Adopted Widely. n Remember “Browser Wars” and the inevitability of ‘de facto’ Standards. n IT, like Nature, Abhors Vacuum, so Standards WILL Emerge where Needed - even if Poorly Conceived.

8 18 November 2004 Connecting the Dots: CAP- WSRP 8 Standards Work Scoped to Audience-Market n ISO-Based on National Representation. n W3C-Based on Corporate (Paid) & Academic Interests (ARPANet & CERN Founding Members). n OASIS-Based on Corporate (Paid) Representation & Specializes on Structured Information-XML. n IEEE, IETF, ANSI, etc. Subsets Tend Specific Interests.

9 18 November 2004 Connecting the Dots: CAP- WSRP 9 Web Services - From Hyperbole to Hard Work as Y2K Fades n Web Services Concept Emerges as ‘Dot-Com” Bubble Bursts. n Hyperbole Gives Way to Global IT Recession - IT Spending Decline. n WSIA-WSRP Begins January 2002. n WSRP 1.0 Approved August 2003 n WS-I Evolves as Interoperability Testing/Incubator Adjunct to Standards Groups.

10 18 November 2004 Connecting the Dots: CAP- WSRP 10 Web Services Support Structure & Stacks Start with OSI:

11 18 November 2004 Connecting the Dots: CAP- WSRP 11 Web Services Stacks

12 18 November 2004 Connecting the Dots: CAP- WSRP 12 OSI & Web Services Stacks

13 18 November 2004 Connecting the Dots: CAP- WSRP 13 Standards, Web Stacks, OSI

14 18 November 2004 Connecting the Dots: CAP- WSRP 14 OASIS WSRP 1.0 Scopes Simple, Basic Functionality First n Focus on Reusing Content Units (Portlets) from Multiple Sources. n Model-View-Control Design Pattern Sets Fundamental Architecture. n Primary Actors (Roles) Defined: Producer, Consumer, User. n Started with Stateless Portlets, then Simple Interactivity and Stateful Portlets. n Security Left to Security Committees.

15 18 November 2004 Connecting the Dots: CAP- WSRP 15 OASIS Finishes CAP 1.0 n CAP Brought into OASIS Process at Start of Emergency Management Technical Committee (EMTC) March 2003 - Approved April 2004. n Partnership for Public Warning (PPW) Worked Two Years Before Bringing CAP Project to EMTC. n Scoped for Broad Use, Transport (Delivery) Independence, Emphasis on Alert & Warning Terminology with XML Schema.

16 18 November 2004 Connecting the Dots: CAP- WSRP 16 CAP: Designed to Work with Web Services, Fits WSRP n CAP Adopted XML Schema to Standardize Terminology. n CAP Adaptable to Web Services Delivery through DHS/FEMA/DMIS. n DMIS - Disaster Management Interoperabilty Services - Pioneers Pre-testing Interoperability Standards to Work with DHS and Emergency Management Community. n DMIS: a Founding Member of EMTC.

17 18 November 2004 Connecting the Dots: CAP- WSRP 17 DHS/FEMA/DMIS: Open Standards - Interoperability

18 18 November 2004 Connecting the Dots: CAP- WSRP 18 CAP in WSRP=EA-SOA: Enterprise Architecture Using Service-Oriented Architecture n WSRP Portal/Portlets Show EA-SOA Across Government-Business, Public- Private, J2EE-.NET Boundaries. n Enterprise Architecture (EA) Provides Comprehensive Structure for Organization-Wide IT Integration. n Service-Oriented Architecture Provides Reusability of Customizable Service Components.

19 18 November 2004 Connecting the Dots: CAP- WSRP 19 Enterprise Architecture

20 18 November 2004 Connecting the Dots: CAP- WSRP 20 Service-Oriented Architecture

21 18 November 2004 Connecting the Dots: CAP- WSRP 21 Service-Oriented Architecture: Business Example

22 18 November 2004 Connecting the Dots: CAP- WSRP 22 DMIS Shows CAP in Web Services Design Principles n Architecture Follows Process Follows Function. n Bottom>Up Reporting, Top>Down Administration. n CAP Incident Alerts Start at Local Level>Report Up Chain>DMIS. n DMIS Distributes Globally. n Currently ‘Pull,’ Can be ‘Push.’

23 18 November 2004 Connecting the Dots: CAP- WSRP 23 Bottom-Up & Top-Down Design

24 18 November 2004 Connecting the Dots: CAP- WSRP 24 CAP Summary n The Evolution of Web Services n OASIS WSRP 1.0 Scopes Simple, Basic Functionality n CAP Approved April 2004 n CAP: Designed to work with web services, Fits WSRP n CAP in WSRP=EA-SOA: Enterprise Architecture Using Service-Oriented Architecture n EMT Units Leveraging Power of Information - Locate Medical Resources, GIS, +

25 18 November 2004 Connecting the Dots: CAP- WSRP 25 Public Service Portal Shows Use of CAP-WSRP Interoperability n Humanmarkup.org, Inc. wishes to Express its Appreciation for the generous time and effort extended to this Project by Oracle Corporation. n Interoperability as a Concrete Fact is only Achieved by such Efforts. n This Presentation Shows how Interoperability can Improve Emergency Response Services.

26 18 November 2004 Connecting the Dots: CAP- WSRP 26 Public Service Portal Shows Use of CAP-WSRP Interoperability n Humanmarkup.org Portal (Courtesy of Plumtree Software Inc,) with Oracle and Broadstrokes Inc, Apache Portlets n CAP Alerts Available through DMIS n Various Emergency Management Agencies Access & Respond to CAP Messages n Sample Public Service Portal Aggregates Medical & GIS Portlets

27 18 November 2004 Connecting the Dots: CAP- WSRP 27 Scenario: Series of Incidents Demonstrate CAP-WSRP n Hurricane Moving Northeast in September Week from Puerto Rico to Florida to Charleston to Chesapeake Bay-Washington, D.C. n Early in Week Long Beach, CA Reports Suicide Bomb Attempt at LNG Terminal. n Threat Level Increased.

28 18 November 2004 Connecting the Dots: CAP- WSRP 28 We Follow EMT Teams: Wireless Notebooks & PDA/Cell Units

29 18 November 2004 Connecting the Dots: CAP- WSRP 29 Portals Provide Varying Levels of Personalization

30 18 November 2004 Connecting the Dots: CAP- WSRP 30 Specialized Communities Available with XACML/ebXML

31 18 November 2004 Connecting the Dots: CAP- WSRP 31 ebXML Registry Allows Access by Roles - XACML Registration

32 18 November 2004 Connecting the Dots: CAP- WSRP 32 EMTs Access Medical Resources by CAP Message & Type

33 18 November 2004 Connecting the Dots: CAP- WSRP 33 EMTs Find Medical Resources by CAP Message & Type

34 18 November 2004 Connecting the Dots: CAP- WSRP 34 Examples Show Drilling Down in Database

35 18 November 2004 Connecting the Dots: CAP- WSRP 35 Examples Show Drilling Down For in Database

36 18 November 2004 Connecting the Dots: CAP- WSRP 36 Examples Show Drilling Down For in Database

37 18 November 2004 Connecting the Dots: CAP- WSRP 37 Examples Show Drilling Down For in Database

38 18 November 2004 Connecting the Dots: CAP- WSRP 38 GIS Portlet Provides Mission Critical Information For Emergency Managers, EMTs n Geospatial Information Translated into Useful Maps-Updates. n Maps Indexed by Layers of Information Available by Clicking Emergency Symbols. n Combined Resources Provide Common Operational Environment COE.

39 18 November 2004 Connecting the Dots: CAP- WSRP 39 GIS Portlet Provides Mission Critical Information

40 18 November 2004 Connecting the Dots: CAP- WSRP 40 GIS Portlet Provides Mission Critical Information

41 18 November 2004 Connecting the Dots: CAP- WSRP 41 GIS Portlet Provides Mission Critical Information

42 18 November 2004 Connecting the Dots: CAP- WSRP 42 Update From Second Source by Wireless Voice: Critical Feature

43 18 November 2004 Connecting the Dots: CAP- WSRP 43 Original Update From Second Source Available Separately

44 18 November 2004 Connecting the Dots: CAP- WSRP 44 Original Update From Second Source (A Service of GeoResponse.com) Report an Event/ View Status of call/ Reports/ Conduct spatial analysis Geocode the call regionCreate call list Customize and approve the message Initiate call Receive and map critical responses

45 18 November 2004 Connecting the Dots: CAP- WSRP 45 Original Oracle Portlets in Oracle Portal

46 18 November 2004 Connecting the Dots: CAP- WSRP 46 Original Oracle Portlets in Oracle Portal

47 18 November 2004 Connecting the Dots: CAP- WSRP 47 Original Oracle Portlets in Oracle Portal

48 18 November 2004 Connecting the Dots: CAP- WSRP 48 Original Oracle Portlets in Oracle Portal

49 18 November 2004 Connecting the Dots: CAP- WSRP 49 WSRP Portlets from TC Vendors http://wsrp.dyndns.org:9081/wps/portal/!ut/p/.cmd/cs /.ce/7_0_A/.s/7_0_1UN/_s.7_0_A/7_0_1UN

50 18 November 2004 Connecting the Dots: CAP- WSRP 50 WSRP Portlets from TC Vendors http://wsrp.dyndns.org:9081/wps/portal/!ut/p/.cmd/cs /.ce/7_0_A/.s/7_0_1UN/_s.7_0_A/7_0_1UN

51 18 November 2004 Connecting the Dots: CAP- WSRP 51 More WSRP Samples

52 18 November 2004 Connecting the Dots: CAP- WSRP 52 Summary n Standards Meant to be Used Together. n Modular, Flexible Approaches will Find More Success than Single Vendor Solutions. n Promoting Adoption Necessary for Continued Development & Improvement. n New Standards Will be Needed in Foreseeable Future.


Download ppt "18 November 2004 Connecting the Dots: CAP- WSRP 1."

Similar presentations


Ads by Google