LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April 24 2012 Kukhee Kim.

Similar presentations


Presentation on theme: "LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April 24 2012 Kukhee Kim."— Presentation transcript:

1 LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC LCLS Timing Software and Plan April 24 2012 Kukhee Kim ICD Software SLAC National Accelerator Laboratory

2 LCLS Timing Software and Plan 2 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Contents Current configuration SLAC specific features On going issues Future plan and issues

3 LCLS Timing Software and Plan 3 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Timing System Configuration PNET EVG Timing Pattern from Master Pattern Generator (in old control system) 128 bits modifier VMTG 119 MHz clock + 360Hz Fiducial from RF timing system 476 MHz main drive line RF which carries the 360 Hz trigger modulation ioc Fanout 360 Hz fiducial 6x32bits modifiers [0_255] event codes + BSA related information EVRs from Master Trigger Generator (new system)

4 LCLS Timing Software and Plan 4 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Current Configuration Master Pattern Generator (in old control system) generates 128 bits timing pattern (+ beam code + pulse Id) at 360 Hz and broadcasts it on PNET PNET module in EVG IOC receives the timing information and drives the 360 Hz timing processing EVG software evaluates the timing pattern from the PNET and makes the extended timing pattern with programmed logic timeslot n with m Hz …. Software also generates and transfer the information from EVG to EVR 360Hz pulse Id embedded timestamp Event codes BSA information Software maintains the timing pipeline

5 LCLS Timing Software and Plan 5 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Beam Synchronous Acquisition Beam Synchronous Acquisition (BSA): Acquire all beam-dependent scalars across multiple IOCs on the same pulse over multiple pulses of a certain kind (not just x-pulses- in-a-row) up to 120Hz. Acquire up to 2800 values per scalar in one acquisition request. Each value of the 2800 values can be an average of up to 1000 values. Each acquisition request can specify: Beam code (defines project, 1 = LCLS) Machine conditions of interest – rate, TS, permits, etc Provide constant 1HZ beam-synchronous data for channel archiver and displays

6 LCLS Timing Software and Plan 6 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC BSA data gethering Data gathering part consists of the following actions: BSA event definition (EDEF) setup and start request done on the EVG IOC. 360hz checking on the EVG IOC with user notification when finished. 360hz requests (acquisition control) sent by the EVG IOC to all EVR IOCs via fast fiber optic link. Data checking, averaging, and array update per scalar record per request on the EVR IOCs. Data on EVR IOC must be available within 7.3 msec after beam or it will be lost, even when beam is less than 120hz. EDEF will finish with arrays that are not complete if this time budget cannot be met. For an acquisition at full beam rate (ie, 30hz), if data is acquired at a lower rate (ie, 10hz), the array will not be complete. Use rate-limit bits as-needed when setting up the EDEF. Implementation is all EPICS record-based. EVREVR IOCIOC EVGEVG PNETPNET IOCIOC BPM FEE Triggers Timing Crate BPM Crate Data CA Client EDEF Flags, Pattern, etc EDEF Setup CA Client BSA Data

7 LCLS Timing Software and Plan 7 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Pipeline, Pattern & Event Code Pipeline Advancing in the EVG Generate New pattern at !3 pulses prior! Step 5 Decide event code list with the !Next1! pattern Dealing with the next1 pattern Pipeline index =1 is hard-coded in the database Fiber connection to EVR Trigger/Event Generation by the Event Code Pipeline Advancing in the EVR EVG EVR Construct EDEF data (for BSA) from the MOD5 & EDEF Masks Re-construct EDEF data (for BSA) from the MOD5 & EDEF Masks

8 LCLS Timing Software and Plan 8 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC BSA & EDEF message EVG side EVR side Modifiers MOD5 for BSA masks (active) + TimeStamp + AvgDone, Minor, Major, Init EDEF masks Pattern for Next3 Pattern Pipeline Step 5 Fiber optic connection EDEF Table DEDEF 0 DEDEF 1 DEDEF 19 DEDEF n Timestamp (active)Timestamp (Init)avgDone flagSeverity Update the EDEF table, after complete the pipeline advancing EVG&EVR do exactly same processing to update the EDEF table

9 LCLS Timing Software and Plan 9 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC On going issue Switch PNET to VMTG (MTG) Due to the retirement of MPG in old control system VMTG only provides 360 Hz fiducial + timslot 0 which is synchronized with AC power line EVG software decided timing information/timing pattern which programmed by the evGui EVG software also decided pulse Id Pattern Bit Generator (PABIG) software module will do the timing pattern business in the EVG Keep use upper level EVG software

10 LCLS Timing Software and Plan 10 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Software Stack for EVG PNETVMTG Acromag DIOEVG BCS SBI Perm BCS Beam Perm 119MHz Clock 360Hz Fiducial TriggerPNET broadcasting Asyn moduleVMTG module EVG Drv/Dev PABIG GenVar Master Beam Control Bits 0 to 8 via CA HW input bits in PABIG EVG Application EPICS DB EDEF reservation for the BSA PNBN PVs from SoftIOC SNL program 476MHz Clock 360Hz Trigger 360Hz Fiducial Trigger 2 nd NIC udpComm mpsComm PNET Task MPS message (beam destination & Perm)

11 LCLS Timing Software and Plan 11 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Switch from PNET to VMTG PNET task need to be delayed ~ 150 usec after the PNET IRQ to wait the MPS message. PNET IRQ is using HW_TIMER to make the delay The PNET ISR implement 150 usec delay on the HW_TIMER The callback for the HW_TIMER releases signal to proceed the PNET Task. VMTG has configurable IRQ delay Configure the VMTG IRQ delay as ~570 usec The VMTG IRQ is occurred at 150 usec after the PNET IRQ Fiducial PNET VMTG Unknown delay PNET IRQ ISR implements the timer Timer callback releases the signal to the PNET task PNET task VMTG IRQ The ISR releases the signal to the PNET task ~150 usec ~ 570 usec MPS message arrives somewhere before the signal.

12 LCLS Timing Software and Plan 12 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC evGui Revolution from text base timing configuration to visual timing configuration

13 LCLS Timing Software and Plan 13 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Future Plan and Issues (1) merge to main stream SLAC timing software has been diverse from community need to know, what is current status of new driver software need to know, what is future plan for firmware/register map need to get clear understanding, what is the SLAC specific features in the software BSA Timing Pattern Pipeline?

14 LCLS Timing Software and Plan 14 Controls Timing Workshop EPICS Collaboration Meeting 2012 @ SLAC Future Plan and Issues (2) Support new platform Linux uTCA Some other new embedded platform including the EVR embedded in a FPGA Improvement for BSA more performance more easier/flexible configuration new requirements from physicists