ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,

Similar presentations


Presentation on theme: "ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,"— Presentation transcript:

1 ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP, transplanted Vegetation, a Boil-Up Pool, & a Viffle} PPT by dave derrick

2 Contact: Doug Fisher, dfisher@OCSWCD.ORG Location: A couple different locations on Onondaga Cr. in the Tully Valley, near LaFayette, NY. dfisher@OCSWCD.ORG

3 THE NATURAL, THEN CONSTRUCTED BOIL-UP POOL ON UPPER ONONDAGA CREEK, NEAR SYRACUSE, NEW YORK Constructed May 2006 The go-to guy, Mark Schaub with the Onondaga County Soil and Water Conservation District, Lafayette, NY.

4 Looking US toward the left bank. Note the interesting natural hook causing a Boil-Up pool. 4/18/2006

5 Another view of the left bank, 4/18/2006

6 Not much of a hook, but very effective at forming a natural deep, circular, scour pool. 4/18/2006

7 Natural Boil-Up Pool on Onondaga Creek. 4/18/2006

8 Looking DS, construction has begun on DS riprap and Engineered Rocked Riffle. 5/24/2006 From Mark Schaub

9 Looking DS, stone in, but not a great semi- circle yet-5/24/06 From Mark Schaub

10 Looking DS, bank stone & kicker in, still not a good semi -circle 5/24/2006 From Mark Schaub

11 Looking US, note how bank kicks current, just a little more tweaking needed (pull some toe stone back) 5/24/2006 From Mark Schaub

12 The next day, flow right to left. All angles and circles correct, note flow over curved kicker, truly a thing of beauty!!! From Mark Schaub

13 Looking DS. Planform now consists of two pools & a riffle within the bend 5/25/2006 From Mark Schaub

14 Looking US at the Boil-Up Pool at bankfull stage. Note thalweg down the center of the stream From Mark Schaub

15 Looking US at the Boil-Up Pool at bankfull stage. Note thalweg down the center of the stream From Mark Schaub

16 3 YEARS AFTER PROJECT COMPLETION Photos by Derrick JUNE 18, 2009

17 Looking US @ the Boil-Up Pool 3 yrs after construction, Boil-Up working well even under base flow conditions, and streamside veg coming on strong. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

18 From the road looking downhill & DS @ the US Engineered Rocked Riffle & the Boil-Up Pool. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

19 From the road, looking downhill @ the Boil-Up pool 3 years after construction. Veg has covered the bank protection nicely. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

20 UPPER ONONDAGA CREEK: SITE 5-D CONSTRUCTED JULY 2006

21 THE UPPERMOST ENGINEERED ROCKED RIFFLE IN REACH 5-D {ALL STONES IN COMPRESSION}

22 Looking DS, two rows of stone in. Placing stone in compression, working from DS to US Photo by Mark Schaub, OCSWCD

23 ERR, 2 rows in, flow right to left Photo by Mark Schaub, OCSWCD

24 Looking DS at the completed ERR Photo by Mark Schaub, OCSWCD

25 Looking DS at the completed ERR, note nice pool US.

26 Photo by Mark Schaub, OCSWCD Looking DS, close-up of the ERR

27 Looking DS @ the US Engineered Rocked Riffle (ERR) built with all stones imbricated (in compression). 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

28 Looking US @ the US Engineered Rocked Riffle (ERR). 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

29 Looking US @ the left bank stabilization for the US ERR. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

30 TRANSPLANTING EXISTING VEG AND/OR ROOT MATS WITH THE TRACKHOE {2 MINI CASE STUDIES}

31 ONONDAGA CREEK SITE 5-D Diamond-Oriented Traffic Control Stones with Single Stone Bendway Weirs (MINI CASE STUDY #1)

32 DIAMOND -ORIENTED TRAFFIC CONTROL STONES {TCS} WITH BEDLOAD BENCH IN BETWEEN, WITH TRANSPLANTED VEGETATION ON TOP OF TCS & BEDLOAD BENCH WITH SINGLE-STONE BENDWAY WEIRS ON EVERY 4th TCS.

33 TCS were typically 3 ft by 3 ft by 3 ft, spaced 6 to 8 ft apart, with bedload material choked in between forming a continuous bench. Vegetation was pulled down from top bank & placed on the bench. Every 4 th TCS was keyed into the bank & had a single- stone Bendway Weir added to the stream end.

34 Photo by derrick Typical stones used as Diamond Traffic Control Stones

35 Photo by Mark Schaub, OCSWCD Looking DS at a Diamond Traffic Control Stone-in place, but not dug in yet

36 Photo by Mark Schaub, OCSWCD Placing a Diamond Traffic Control Stone

37 Square stones (3 ft by 3 ft by 3 ft) placed with a sharp edge facing upstream, designed to “kick” flow off the bank, must be keyed into the bed & bank, spaced 6 to 8 ft apart, every 4th one should be keyed into the bank. Every 4th stone has a Single Stone Bendway Weir. Diamond-Oriented Traffic Control Stones with Single Stone Bendway Weirs Key TCS Key TCS SSBW TCS SSBW

38 Photo by Derrick Looking at a Single Stone Bendway Weir & a TCS and key stone (one more key stone needed)

39 Thalweg is dug and that bedload material is placed between the Traffic Control Stones to form a bench at the same height as the TCS. Diamond-Oriented Traffic Control Stones with Single Stone Bendway Weirs

40 Photo by Mark Schaub, OCSWCD Bedload material placed between Traffic Control Stones Traffic Control Stones

41 Photo by Derrick Looking DS at Single Stone Bendway Weirs & Diamond- Oriented Traffic Control Stones (most hidden) BW

42 Traffic Control Stones with a narrow bench of bedload material between. Note vertical bank above. Onondaga Creek, Site 5-D, constructed July 2006

43 Traffic Control Stones Bedload material placed between Traffic Control Stones

44 Looking DS @ the US key & Traffic Control Stones (TCS) & Single Stone Bendway Weirs (SSBW). Note thalweg trace. Hydraulic Cover Stone in middle of pool. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

45 Close-up, looking DS @ TCS & SSBW, note thalweg. Slope at toe of bank = “come & go dynamics” erosion, then deposition 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

46 Single Stone Bendway Weir with Traffic Control Stone (key is hidden). Bank is stable & vegged. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

47 Plants, root mass, and soil was pulled down from the vertical outer bank to provide streamside vegetation. The mid & upper bank was sloped and seeded. Diamond-Oriented Traffic Control Stones with Single Stone Bendway Weirs

48 Slide that veg down the slope!

49 Slide more veg down the hill Onondaga Creek, Site 5-D, constructed July 2006

50 Slide even more veg down the slope. Note long “Instant Shade” over stream

51 Right bank TCS with SSBW DS of the Rocked Riffle. Bank mostly stable & vegged 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

52 Right bank partly hidden, TCS’s with a Single Stone Bendway Weir. Stable bank with lush veg & bedload material between TCS’s. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

53 Right bank TCS & SS Bendway Weirs. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

54 KEYED LPSTP WITH TRANSPLANTED VEGETATION ON TOP PLUS 2 SINGLE-STONE BENDWAY WEIRS. (MINI CASE STUDY #2)

55 Pre-project-Looking DS at LPSTP project bend Photo by Mark Schaub, OCSWCD

56 LPSTP with bedload choking that forms a mini floodplain bench on top of the LPSTP. Onondaga Creek, Site 5-D, constructed July 2006

57 Sliding veg & root mats downslope onto LPSTP bench

58

59 Digging & placing buckets of gray dogwood onto the LPSTP bench.

60 It’s an instant jungle!!!!

61 This section is complete, 2 hrs of machine time for LPSTP, 2 Single- Stone Bendway Weirs & veg transplant {100 ft of protection} Onondaga Creek, Site 5-D, constructed July 2006

62 Approx. 6 months after installation, looking DS DERRICK-11-8-2006

63 Looking DS @ LPSTP & SS Bendway Weir. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

64 THE VIFFLE A Derrick-McCullah idea hatched late at night in the Seattle airport while headed to Alaska Combining the best attributes of the Cross-Vane and the Engineered Rocked Riffle (rock vanes slowing currents near banks and riffle improving fish passage and creating a properly proportioned scour pool with flat sloped tail-out) Build the two Rock Vane arms of the Cross-Vane Downstream instead of a vertical drop build the rocked riffle. At DS end of riffle the stones are keyed into the bed & all stones are placed in compression

65 THE FOLLOWING VIFFLE IS NEW CONSTRUCTION, NOT A REPAIR OF AN EXISTING CROSSVANE

66 Looking US at rock vane section of Viffle, rocked riffle portion not constructed yet. Onondaga Creek, Site 5-D, Aug 2006. Photo by Mark Schaub, OCSWCD

67 Onondaga Creek, Site 5-D, Looking across & US at the completed VIFFLE ( V ane r IFFLE ), Rocked riffle section choked with creek gravel Photo by Mark Schaub, OCSWCD

68 Red line delineates location of crest stones & keys of completed Viffle Photo by Mark Schaub, OCSWCD

69 Looking DS @ the Viffle with natural “leaner” tree. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

70 Looking US @ the same Engineered Rocked Riffle. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

71 Additional headcuts from DS causing problems on a Cross-Vane built in 2005, in response we will rebuild these as Viffles!! Photo by derrick-July 11, 2006, constructed 2004

72 Onondaga Creek-Site 5-D. 14 months later 10-16-2007. We will start upstream and flow downstream. All photos by Mark Schaub, Onondaga County Soil & Water Conservation District

73 Looking US at US key for the TCS & a TCS with a Single-Stone Bendway Weir Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

74 Looking DS at the US ERR with TCS with BW on right bank. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

75 Looking DS at TCS & TCS with BW on right bank. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

76 Looking across at Traffic Control Stones. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

77 Looking US at an ERR & TCS on right descending bank Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

78 Looking DS at the 3 rd ERR with the LPSTP in background. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

79 Looking US at the ERR & TCS in the background. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

80 Looking US at the ERR. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

81 Looking DS at the LPSTP with Single-Stone BW in foreground Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

82 Looking DS at the LPSTP. Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

83 Looking US at the Viffle. Key stone barely visible on each bank Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

84 Looking US at the Viffle with the LPSTP in background Onondaga Creek-Site 5-D. 14 months later 10-16-2007-from Mark Schaub

85 3 YEARS AFTER PROJECT COMPLETION Photos by Derrick JUNE 18, 2009

86 Looking US @ the third (steepest) ERR. Has worked well over time. 3 YEARS LATER - Onondaga Creek-Site 5-D. -DERRICK 6-18-2009

87 Nov 8, 2006 a big tour for 60+ fellow professionals, show off cool innovative stuff to folks, give everyone good ideas to save the planet, one stream at a time!! DERRICK-11-8-2006

88 This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal cell @ 601-218-7717, or email @ d_derrick@r2d-eng.com Enjoy the information!! d_derrick@r2d-eng.com

89 the Bassett as a mountain lion