1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.

Similar presentations


Presentation on theme: "1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore."— Presentation transcript:

1 1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore

2 2 WHAT IS Regional Energy Account (REA) ? “ REA is Statement of Allocation, Availability,Energy Scheduled/ injected and drawn which forms the basis for payment/ receipt among the constituents”

3 3 Requirement of REA To be FAIR and EQUITABLE To RECOVER DUES at the EARLIEST TRANSPERANCY Dispute Resolution Reconciliation RPCs have been entrusted with the responsibility of preparing REA at present

4 4 Scope of REA Regional Energy Account ISGS Other Regions Beneficiaries Traders CTU

5 5 Commercial Settlements Fixed/Capacity Charges Variable/Energy Charges Wheeling Charges Ratio(s) in which above to be shared by the beneficiaries. Any other charges as been specified by the competent authority from time to time like UI,Incentive, Transmission Charges etc.

6 6 Fixed Cost Elements Interest on Loan Return on Equity Depreciation O&M (personnel, Lubricants, Chemical etc.) Interest on Working Capital, IDC Insurance, Taxes, etc. (Independent of Energy produced)

7 7 Variable Cost Elements Primary Fuel Cost (Coal) (depends on Energy produced) Secondary Fuel (oil)

8 8 PRE-REQUISITES Notify Two part tariff Signing of BPSA/PPA/BPTA Payment security mechanism (BG,LC, ESCROW etc.) Suitable Metering Scheduling mechanism Tele-metering/SCADA

9 9 Pre ABT REA Fixed and variable charges merged to make single rate in paisa/KWhr Charges to be paid by beneficiaries on the basis of energy drawal No weightage to Entitlement/schedule of various beneficiaries in a particular generator (Typically in SR) Sample REA

10 10 PRE ABT TARIFF MECHANISM - Problems All inter-utility exchanges based on single flat paise/kWH This rate neither change with time of the day i.e; peak/off-peak or system conditions(generation surplus or deficit) Do not discourage MW overdrawals by SEBs.They could avoid this by proper load management, run their own higher cost generator DGs,GTs durng contingencies Do not induce power plant operator to back down generation during off-peak hours No financial compensation to any party for over stressing its power plants for assisting during contingencies SEBs view this composite figure only and compare with their own generating stations for their dispatch decisions ISGS(pit head plant)with lower incremental costs used to back down before backing down their own costlier load center generators This leads to perpetual operational and commercial disputes in the operation of region grid

11 11 Availability Based Tariff With a view to promote overall economic operation of the power sector and to achieve improvement in operational parameter GOI felt that the existing tariff structure in power sector needs to be rationalized. Accordingly GOI proposed, for sale of electricity by generating companies to the beneficiaries, a three part tariff structure in viz. Capacity charge, Energy charge, Unscheduled interchanges (UI)

12 12 AVAILABILITY BASED TARIFF(ABT) (a)CAPACITY CHARGE (b)ENERGY CHARGE (c)ADJUSTMENT FOR DEVIATIONS (UI CHARGE) (a)= a function of Ex-bus MW availability of power plant for the day declared before the day starts x SEB’s % share. (b)= MWh for the day as per ex=bus drawl schedule for the SEB finalized before the day starts x Energy charge rate (c)=Σ(Actual energy interchange in a 15 min time block – scheduled energy interchange for the time block) x UI rate for the time block. TOTAL PAYMENT =(a) + (b)± ( c)

13 Advantages of ABT Improved frequency and voltage Economic despatch Autonomy to the utility Incentive for high plant availability,but no incentive to over generation during off-peak hours Technically and commercially right Immediate solution for IPPs and Captives True free market ; market forces decide the pool price Pool price known on-line Total transparency ; No regulator required Simple practicable ; Meters already developed and installed

14 14 Flow chart of Accounting Procedure Data from RLDC (on every Thursday for the previous week) Preparation of Energy Accounts by RPCs Weekly UI and VAR Accounts (issued on every Tuesday) Monthly REA (Issued during 1 st week of month) GOI/CERC orders/notifications Board Decisions Preparation of Generation Schedule And drawal Schedule Disputes Mechanism and Resolution Hydro Generating StationInter State Transmission

15 15 Preparing final schedule 121234567891011121234567891011121 noon ISGS SLDC Despatch schedule net Drawal schedule revision station-wise MW/MWH capability station-wise W/MWH entitlement required Drawal schedule AMPM RLDC Despatch schedule starts Drawal schedule starts final Despatch schedule final Drawal schedule BACK

16 16 Data Required for Preparing these accounts – to be furnished by RLDC Declared Capability (DC) and Dispatch/generation Schedule (GS) – Annexure 1AAnnexure 1A Entitlement of various beneficiaries – Annexure 1BAnnexure 1B Requisition by various beneficiaries – Annexure 1CAnnexure 1C Any bilateral Trading under STOAC – Bilateral FilesBilateral Files Wheeling to/from other regions – Wheeling FilesWheeling Files Processed Meter (SEM) data – 15 min block wise actual injection/drawal at various locations and reactive drawal/injection for a day – Raw SEM Data SEM Files BACK

17 17 Weekly Account Contains Unscheduled Interchange (UI) charges Reactive energy charges BACK

18 18 Monthly REA Contains (a)Availability % for Capacity Charge recoveryAvailability % for Capacity Charge recovery (b)Energy Scheduled for Energy ChargesEnergy Scheduled for Energy Charges (c)Energy scheduled beyond target PLF for IncentiveEnergy scheduled beyond target PLF for Incentive (d)Ratio for sharing of monthly Transmission Charges of CTURatio for sharing of monthly Transmission Charges of CTU (e)Ratio for sharing of monthly RLDC fees and O&M chargesRatio for sharing of monthly RLDC fees and O&M charges (f)Wheeling Charges for ISGS Power wheeled on state owned inter state lines.Wheeling Charges for ISGS Power wheeled on state owned inter state lines. (g)Energy Exchanged with other RegionsEnergy Exchanged with other Regions (h)Energy scheduled under STOAEnergy scheduled under STOA BACK

19 19 Unscheduled Interchange (UI) charges For Generators - UI = Actual Generation – Generation Schedule For Beneficiaries - UI = Actual Drawal – Ex-Periphery drawal Schedule For Other Regions - UI = Actual Metered energy – Net Schedule at Interregional Periphery

20 20 For the day: 0000 hrs. to 2400 hrs. Central Generating Stations 1 23 Ex-Bus Declared Capability x1x2x3 (Forecast) ____ _______ SEB-A’s sharea1a2a3 SEB-B’s shareb1b2b3 SEB-C’s sharec1c2c3 For a particular 15 minute time block SEB-A’s requisition a’1a’2a’3 SEB-B’s requisition b’1b’2b’3 SEB-C’s requisition c’1c’2c’3 _________ CGS’s schedule x1’x2’x3’ MW Sample UI Calculation

21 21 Issues involved in UI Accounting If During the day of operation any constituent feels that its schedule needs to be changed due to load crash/ tripping of generators etc. it can do so but revised schedule will be effective from 6 th time block. UI is to be suspended during grid disturbance / transmission bottle neck No UI for non commercial units and other stations not covered under ABT (Typically Nuclear stations) Any generation up to 105% of the declared capacity in any time block and averaging up to 101% of the average DC over a day is allowed. If generation goes beyond this limit, RLDC will investigate and if gaming is found UI charges due to such extra generation shall be reduced to zero and the amount shall be adjusted in UI account of beneficiaries in ratio of their capacity share in that generating station

22 22 Special Note for Gas Turbine Generating Station For the Gas turbine generating station or a combined cycle generating station if the average frequency for any time block, is 49.02<f<49.52Hz and Schedule generation is more than 98.5% of the declared capacity, the scheduled energy shall be deemed to have been reduced to 98.5% of the DC, and if average frequency for any time block, is below 49.02Hz and Scheduled generation is more than 96.5% of DC, the scheduled generation shall be deemed to have been reduced to 96.5% of the DC

23 23 For the day: 0000 hrs. to 2400 hrs. Central Generating Stations 1 23 Ex-Bus Declared Capability x1x2x3 (Forecast) ____ _______ SEB-A’s sharea1a2a3 SEB-B’s shareb1b2b3 SEB-C’s sharec1c2c3 For a particular 15 minute time block SEB-A’s requisition a’1a’2’a’3 SEB-B’s requisition b’1b’2’b’3 SEB-C’s requisition c’1c’2’c’3 _________ CGS’s schedule x1’x2’’x3’ MW Revised Schedules

24 24 Actual (metered) injection of CGS-1 in the time block = X 1 MWh. Excess injection = (X1 – x1’ ) MWh. 4 Amount payable to CGS-1 for this =(X1-x1’) X UI rate for the block. 4 SEB-A’s scheduled drawl for time block = a’1+a’2’+a’3 = a’ MW (ex-ISGS Bus) SEB-A’s NET drawal schedule = (a’ – Notional Transm. Loss) MW = (a’ – Notional Transm. Loss) = A’ MWH 4 Actual (metered) net drawal of SEB-A during time block = A MWH Excess drawal by SEB-A = (A-A’) MWh. Amount payable by SEB-A for this = (A-A’) * UI rate for the block. All above payments for deviations from schedules to be routed through a pool A/C operated by RLDC SAMPLE UI ACCOUNT STATEMENT

25 25 Variations in actual generation/drawal and scheduled generation /drawal are accounted through UI. This is a frequency linked charge which is worked out for each 15 minute time block. Charges for all UI transaction, based on average frequency have following rate of paise per KWh from 01.01.03 up to 31.03.04. UI rate (Paise per KWh) Average Frequency of time block 50.5 Hz. and above 0.0 Below 50.5 Hz. and upto 50.48 Hz.5.6 Below 49.04 Hz. and upto 49.02 Hz. 414.4 Below 49.02 Hz. 420.0 Between 50.5 Hz. and 49.02 Hz. Linear in 0.02 Hz. step Unscheduled Interchanges (UI)

26 26 UI rate w.e.f 01.04.04 to 30.09.04 UI rate (Paise per KWh) Average Frequency of time block 50.5 Hz. and above 0.0 Below 50.5 Hz. and upto 50.48 Hz. 8.0 Below 49.04 Hz. and upto 49.02 Hz. 592.0 Below 49.02 Hz. 600.0 Between 50.5 Hz. and 49.02 Hz. Linear in 0.02 Hz. step

27 27 UI rate w.e.f 01.10.04 Average Frequency of time block (Hz,)UI rate (Paise per KWh) Below Not below Rate ----- 50.500.0 50.5050.486.0 50.4850.4612.0 --------------- --------------- 49.84 49.82 204.0 49.82 49.80 210.0 49.8049.78219.0 49.7849.76228.0 --------------- --------------- 49.0449.02561.0 49.02-----570.0 (Each 0.02 Hz. Step is equivalent to 6.0 paise/kWh in the 50.5-49.8 Hz. Frequency range and to 9.0 paise/kWh in the 49.8-49.0 Hz. Frequency range).

28 28 Energy transactions of UI from/to Pool Over Gen. By ISGS-1 Under drawl by SEB-A UI import/Export from IR-1 Under gen. By ISGS-2 No one to one correspondence System frequency UI Rate Regional Pool Over drawl by SEB-B UI Import/Export to IR-2

29 29 Operation of Pool Separate Pool a/cs operated by RLDCs on behalf of RPCs for UI, IRE and Reactive charges Regional Pool Payable by ISGS-2 Payable by SEB-B Payable/Receivable by IR-2 Receivable by ISGS-1 Receivable by SEB-A Payable/ Receivable by IR-1 No one to one correspondence No cross adjustments allowed between the constituents

30 30 IRE Account UI Calculated for Inter Regional Exchange are calculated at different frequency rate so net payable will not be same as net receivable by other region.the difference will go to IRE Account Normally the flow of power will be from higher frequency to lower frequency so there will mostly be surplus in IRE account. This will be shared by the two region on 50:50 basis and will be adjusted towards transmission charges. BACK

31 31 REACTIVE ENERGY CHARGE : PAYABLE FOR : 1.VAR DRAWALS AT VOLTAGES BELOW 97% 2.VAR INJECTION AT VOLTAGES ABOVE 103% RECEIVABLE FOR: 1.VAR INJECTION AT VOLTAGES BELOW 97% 2.VAR DRAWAL AT VOLTAGES ABOVE 103% APPLIED FOR VAR EXCHANGES BETWEEN : A)BENEFICIARY SYSTEM AND ISTS - THROUGH A POOL ACCOUNT B)TWO BENEFICIARY SYSTEMS ON INTER-STATE TIES - BY THEMSELVES RATE: @ Rs. 51.05/MVARh (from 1 st April 2005) Basic Rate : 4 paise/kvArh ( for the year 2000-01 ) 5% ESCALATION PER YEAR SAMPLE VAR ACCOUNT STATEMENT

32 32 Issues in Reactive Energy charges Deficit in pool (SR & ER) -due to continuous High voltages in SR Surplus in Pool (NR &WR) Utilization of Accruals Disputes in payments between Beneficiaries for Reactive charges in Inter-state Lines BACK

33 33 Capacity charge Capacity charge is based on Annual Fixed Charge and will be related to Availability of generating station. Availability means the readiness of the generating station to deliver ex-bus output expressed as a percentage of its rated ex-bus output capability. Target Avb. For Fixed charges recovery ( Notified by CERC ) 100% recovery - if % Availability >=Target Availability Pro-rata reduction if %Avl<T.Avl.

34 34 Calculation Of Availability % Availability = i=1 N DC i / {NxICx(100-Aux n ) }% 10000 Where DC i = Average Declared Capacity for i th day of the period in MW N = Total no. of days during the period Aux n = Normative Auxiliary Consumption as % of gross Gen. IC= installed capacity in MW % Availability forms the basis for calculations

35 35 Monthly Capacity charges receivable by an ISGS: 1 st Month = (1xACC1)/12 2 nd Month = (2xACC2-1ACC1)/12 …. …. 12 th month = (12xACC12-11ACC11)/12 where ACC1,ACC2…….ACC12 = Annual capacity charges corresponding to the cum. Availability up to the corresponding month. Monthly Capacity charges payable by a beneficiary : 1 st Month = (1xACC1xWB1)/12 2 nd Month = (2xACC2xWB2-1ACC1xWB1)/12 …. …. 12 th month = (12xACC12xWB12-11xACC11xWB11)/12 where WB1,WB2…..WB12 = Weighted average % share up to the corresponding month. BACK Extract from SR REA

36 36 Extract of SR REA BACK

37 37 Energy charge: Energy charge is related to the scheduled ex-bus energy to be sent out from the generating station and will be worked out on the basis of paise per KWh. The Energy Charges Payable by beneficiary to the ISGS = Variable Charge of ISGS X Ex – Power Plant Schedule The Energy Charges Receivable by ISGS from beneficiaries = Variable Charge of ISGS X Despatch schedule of ISGS BACK Extract from SR REA

38 38 Extract of SR REA BACK

39 39 Flat rate of 25ps/u For ex-bus Schedule Energy in Excess of ex-bus energy corresponding to Target PLF Incentive for ISGS PLF = 10000 i=1 N SG i / {NxICx(100-Aux n ) }% BACK

40 40 Ratio for sharing of monthly Transmission Charges of CTU Monthly Weighted average entitlement % from all ISGS in the region and other regions BACK

41 41 Ratio for sharing of monthly RLDC fees and O&M charges Monthly Weighted average entitlement % from all ISGS in the region BACK

42 42 Wheeling Charges for ISGS Power wheeled on state owned inter state lines. BACK

43 43 Energy Exchanged with other Regions As furnished by RLDC BACK

44 44 Energy scheduled under STOA As Furnished by RLDC in Bilateral File BACK

45 45 HYDRO POWER GENERATING STATIONS

46 46 CAPACITY INDEX Daily Capacity Index = Declared Capacity(MW) Maximum Available Capacity(MW) Monthly Capacity Index = (Average of Daily Capacity Index)

47 47 NORMATIVE CAPACITY INDEX FOR RECOVERY OF FULL CAPACITY CHARGES During 1 st Year of Commercial Operation Run-of-river85% Storage Type80% After 1 st Year of Commercial Operation Run-of-river90% Storage Type85%

48 48 COMPUTATION OF ANNUAL CHARGES TWO PART TARIFF –Annual Capacity Charge based on Capacity Index –Primary Energy Charge based on Scheduled Energy

49 49 PRIMARY ENERGY RATE Minimum Variable charge of Central Sector thermal power station If Primary Energy Charge > Annual Fixed Charges, then Primary Energy Rate = Annual Fixed Charges Saleable Primary Energy Secondary Energy Rate=Primary Energy Rate

50 50 INCENTIVE = 0.65 x Annual Fixed Charges (CIA- CIN)/100 CIA = Capacity Index Achieved CIN = Normative Capacity Index BACK

51 51 INTER STATE TRANSMISSION

52 52 TARGET AVAILABILTY Target Availability for recovery of full transmission charges AC system 98% DC system95% (HVDC Bi-pole links and HVDC back- back stations)

53 53 SHARING OF CHARGES FOR INTRAREGIONAL ASSETS n =  Tci-TRSCx CL i=1 12 SCL TCi = Annual Transmission charge for ith project TRSC=Total recovery from Open Access CL=Allotted transmission capacity to a customer SCL=Sum of all the allotted transmission capacities

54 54 SHARING OF CHARGES FOR INERREGIONAL ASSETS = 0.5xTCj-RSCj x CL 12 SCL TCj = Annual Transmission charge for jth interregional asset RSCj=Total recovery from Open Access CL=Allotted transmission capacity to a customer SCL=Sum of all the allotted transmission capacities

55 55 INCENTIVE = Equity x (Annual Availability- Target Availability)/100 BACK

56 56 Disputes Mechanism and Resolutions All Accounts to remain open for 20 days for verification. Any Deviation to be bought to the notice to RPC Secretariat. RPC Secretariat will verify the data and take corrective action if required and issue the revised account. If it is found that account is as per the data furnished by RLDC. RPC Secretariat may ask the aggrieved Party to verify the correctness of the data with RLDC. If RLDC finds data needs to be changed, such changes will be intimated to RPC and then RPC will issue the revised account based on the revised data. If aggrieved Party is still not satisfied it may take up the issue with CERC for its decision.