Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015.

Similar presentations


Presentation on theme: "Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015."— Presentation transcript:

1 Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015

2 Initial Capital Expenditures Maintenance Costs Future Capital Costs Background image: http://www.pvisoftware.com/blog/wp-content/uploads/2013/11/Pegasus_vertex_Iceberg.png

3 1. The Plan: Minnesota’s First Transportation Asset Management System 2. The Data: Maintenance led initiative to enhance data collection 3. The System: Procurement and Implemenation of an Enterprise Transportation Asset Management System (TAMS)

4 1. The Plan: Minnesota’s First Transportation Asset Management System 2. The Data: Maintenance led initiative to enhance data collection 3. The System: Procument and Implemenation of an Enterprise Transportation Asset Management System (TAMS)

5  Asset inventory/Conditions  Objectives/Measures  Performance gap assessment  Life cycle cost  Risk analysis  Financial plan  Investment strategies  Enhancements

6  A tool used to manage an organization’s infrastructure and other assets with the objective of delivering an agreed upon standard of service.  Establishes a consistent and transparent statewide approach to planning, programming and managing physical assets.

7  Pavement  Bridge  Drainage structures ◦ Highway culverts ◦ Deep storm water tunnels  Guardrails  Traffic signals  Signs  Overhead sign structures  Pavement markings  ITS  Pedestrian ramps  Lighting  High-mast light tower structures  Land  High-mast light tower structures  Land  Rest areas  Sidewalks  Retaining walls  Tunnels  Noise barrier  Fencing  Weigh stations  ADA infrastructure  Modal infrastructure  Transit vehicles

8

9 9 MnSHIP Pavement System Current Condition 2023 Target (Desired) Interstate2.4% Poor≤ 2% Poor Non- Interstate NHS 4.3% Poor≤ 4% Poor Non-NHS7.5% Poor≤ 12% Poor Bridge System Current Condition 2023 Target (Desired) NHS4.7% Poor≤ 2% Poor Non-NHS2.1% Poor≤ 8% Poor

10 1. The Plan: Minnesota’s First Transportation Asset Management System 2. The Data: Maintenance led initiative to enhance data collection 3. The System: Purchase and Implemenation of an Enterprise Transportation Asset Management System (TAMS)

11  To better understand maintenance costs as an element total life cycle costs, collect or record data in a manner that links use of labor equipment and materials to specific assets.  Identify relationship between asset condition and maintenance costs.

12  Teams for each Asset Type  Led by Maintenance Managers  Representation including: ◦ Field leadership ◦ Specialty office experts ◦ Maintenance office ◦ MnIT ◦ Finance ◦ Performance measures ◦ Asset management specialist

13  Pavement Management System predicts an increase of 85% of roads in “poor” condition in the future.  We know this means more patching, but how much?  What are future maintenance costs for the agency?  Would it prompt us to re-evaluate our plans for capital investment?

14  Improve understanding of maintenance costs by asset and impact of maintenance actions on life cycle  Support statewide, district, sub area work planning and budgeting, staffing planning and budget needs.  This supports “Telling our Story”

15 1. The Plan: Minnesota’s First Transportation Asset Management System 2. The Data: Maintenance led initiative to enhance data collection 3. The System: Purchase and Implemtentation of an Enterprise Transportation Asset Management System (TAMS)

16  Purchase a commercial “off the shelf” software program  Replace dated and poorly integrated existing systems  Automated Facilities Management System (AFMS) first, phase in additional systems  Vision is for a high level of integration  May provide opportunities to simplify or streamline recording tasks.

17 Planning and Budgeting Analytical Tools Query/Reporting and Mapping Tools Asset Characteristics and Condition Modules for each asset class Geospatially Referenced Asset Inventory Field Data Collection Module 17

18  There is a great deal of activity in the area of asset management both nationally and in Minnesota.  We have been managing assets as long as we have been an agency.  Recent efforts are to be; ◦ More comprehensive ◦ Better planned ◦ Better integrated ◦ More financially effective ◦ More transparent

19  For additional information: mark.b.nelson@state.mn.us mark.b.nelson@state.mn.us


Download ppt "Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015."

Similar presentations


Ads by Google