Presentation is loading. Please wait.

Presentation is loading. Please wait.

Anna Bergmark Region 7 Local Program Local Program ARRA Training: ARRA Reporting Requirements.

Similar presentations


Presentation on theme: "Anna Bergmark Region 7 Local Program Local Program ARRA Training: ARRA Reporting Requirements."— Presentation transcript:

1 Anna Bergmark Region 7 Local Program Local Program ARRA Training: ARRA Reporting Requirements

2 Questions to be answered:  What reports are required?  What is the purpose of each report?  Who is responsible for which reports?  When are they due and how to fill them out?

3 What reports are required?  Form 1589 (FHWA)  Monthly Form (NYSDOT)  AAP 21LL (NYSDOT)

4 What is the purpose of each report? Form 1589 (FHWA) Tracks direct, on-project jobs FHWA uses them to calculate jobs being created by stimulus money being spent and reports to Washington, D.C.

5 What is the purpose of each report? Monthly Form (NYSDOT) Tracks actual spending (not reimbursements) Shows progress of the project Provides data on DBE participation (Federal Aid Requirement)

6 What is the purpose of each report? AAP 21LLs (NYSDOT) Tracks payments to the subconsultant/subcontractors

7 Who is responsible for each report? 1589’s Sponsor (only if they will be requesting reimbursement for work done by their own forces) Consultants Contractors Monthly Forms Sponsor AAP 21LL Sponsor

8 When are the reports due? All reports should be submitted to your Regional Local Program Liaison (RLPL) by the 10 th of the month for the previous month. Example: Reports pertaining to February are due by March 10 th Submitting prior to the 10 th is strongly encouraged! Forms are submitted even if they are showing zeros.

9 How to fill in a 1589 Form: 1.Report Month: (mm/yyyy) 2.Contracting Agency: The Sponsor 3.Federal- Aid Project Number: The program code + the first 7 digits of the PIN 4.State Project Number or ID Number: The 9 digit pin. 5.Project Location 6.Contractor Name and Address: this should be who ever is the prime listed on the 1589.

10 How to fill in a 1589 Form cont.: 7. Contract/Subcontractor DUNSs Number: DUNS number for the prime listed on the 1589 8. Employment Data: The prime and any subcontractor/subconsultants that have an agreement with the prime are listed in this section DBE firms should have a note stating “DBE Firm” following their name 9. Prepared By CEO or Payroll Official

11 Important Notes Concerning 1589 Forms: The hours listed in the 1589 will be checked when reimbursements are submitted. You can’t show 0 hours for a month and expect reimbursement for work done during that month. The sponsor, consultant, and contractor each submit their own 1589 with their subs listed.

12 How to fill in a Monthly Form: Construction Dollars Paid to Date: Sponsor paid to contractor (not reimbursements) DBE Actual Payments - Contractor paid to DBE subs RA O-O-C Funding - OOC amount approved by NYSDOT that the Sponsor will pay the Contractor with RA funds. Construction Dollars Percent Complete - Dollars paid to date (including accepted materials paid for) divided by total Contract Value x 100%

13 How to fill in a Monthly Form: Project Time Percent Complete - (Actual Start Date to Current date) divided by (Actual Start date to anticipated finished date) x100% Consultant Contract Information –Either the CI for construction or Design consultant in the case of projects that receive ARRA funds for design (e.g. TEP projects). Consultant Dollars Paid to Date - Sponsor paid to Consultant Consultant Contract DBE participation - Consultant Goal (%) DBE Actual Payments - Consultant to DBE sub- consultant.

14 How to fill in a AAP 21LL: Final Report: Check YES or NO, as appropriate Contract No: 9 digit PIN and the D contract number County: Enter the name of the county or counties this project is located in. Report Date: Enter date (Month/Day/Year) through which payments due and made are reflective of. Contractor and Vendor Data: Enter names, and addresses (including zip code), Telephone numbers (including area codes) and Federal Identification Numbers for both the Contractor and Vendor.

15 How to fill in a AAP 21LL continued: Total Payments Due to Date: Enter total of payments due to the vendor to date. Retainage or Other Withholding to Date: Enter amount due to the vender that has not been paid due to retainage or other withholding. Total Payment to Date: Value of payments to date (less retainage or other withholding). Comments: Amounts recorded as retainage or other withholding must be accompanied by a brief description of the circumstances necessitating the withholding along with item numbers involved (if any). Signatures: Authorized representative of both the Prime Contractor and Vendor sign and date. Notarization: On the Final Report, or when directed by the Department, Prime Contractor and Vendor signatures must be notarized.

16 For Future Questions Contact: Anna Bergmark 315-785-7900 or abergmark@dot.state.ny.us Any Questions?


Download ppt "Anna Bergmark Region 7 Local Program Local Program ARRA Training: ARRA Reporting Requirements."

Similar presentations


Ads by Google