Presentation is loading. Please wait.

Presentation is loading. Please wait.

LHCC - May 2000 1 THE CMS ALIGNMENT SYSTEM Alignment scheme Task of the align. system Monitor the position of the  -chambers and the CT detectors with.

Similar presentations


Presentation on theme: "LHCC - May 2000 1 THE CMS ALIGNMENT SYSTEM Alignment scheme Task of the align. system Monitor the position of the  -chambers and the CT detectors with."— Presentation transcript:

1 LHCC - May 2000 1 THE CMS ALIGNMENT SYSTEM Alignment scheme Task of the align. system Monitor the position of the  -chambers and the CT detectors with respect to each other. Building blocks: 4 subsystems - Internal tracker align. - Internal muon : barrel and endcap - The link tracker  muons (3 alignment planes) Basic components Mechanical structures (rigid, stable) Light sources (LED, laser beams) Light detectors (DPSD) Tilt, proximity and temp. sensors System requirements Physics requirements Position accuracy in r  (referred to the tracker detector) for muons up to 2 TeV : - track reconstruction: ~500  m - for p t measurement: ~150(350)  m at MB1(MB4) ~150  m at ME1 layer Operational constraints Detector hermeticity Large dynamic range (few cm) Radiation tolerance and insensitivity to  B of the components

2 LHCC - May 2000 2 THE CMS ALIGNMENT SYSTEM Alignment scheme

3 LHCC - May 2000 3 THE CMS ALIGNMENT SYSTEM Alignment scheme

4 LHCC - May 2000 4 MUON ALIGNMENT SYSTEM ORGANIZATION AND PARTICIPANTS Internal BarrelInternal Endcap Link system CERN (CMT) USA: SPAIN: Hungary (Debrecen) :FERMILABCIEMAT (Madrid) Kossuth L. Univ.North-Eastern Univ.IFCA (Santander) ATOMKI Austria (Vienna) : HEPHY Inst. Fur H. der OAW Pakistan (Islamabad) : Optics Labs.

5 LHCC - May 2000 5 Link Tracker - Muons Working principle  Translates Tracker co-ordinates (points,  angles) to the ´linking points´ in the external MABs –The tracker co-ords are defined by the internal tracker alignment at the TK ends (TK alignment wheels) –The MAB ´linking points´ serve for Barrel and Endcap connection to the Tracker –Each 1/4  plane is generated independently. The whole system is constrained at the TK volume –Points (3D co-ords) are measured with laser beams + semitransparent sensors for the co-ords perpendicular to the beams, and by mechanical tubes and proximity sensors for the co-ords along the beams –The  angle is measured at each structure (TK wheel and MABs) by Laser Level units ØMeasures directly ME1/2 chambers (CSCs crossed by a secondary link line) and the ME1/1 CSC disk (using a ME1/1 transfer platform to bend by 90° the laser beam)

6 LHCC - May 2000 6 Barrel muon alignment Working principle 36 rigid mechanical structures called MABs are holding TV-cameras (typically 10 cameras/MAB). These cameras are observing LEDs mounted on both sides of the barrel muon chambers ( 40/chamber) and on the so called Z-bars (the reference in Z-direction). A high level of redundancy is achieved by multiple observations and loops which make the system robust and reliable. The barrel system is connected to the TK via linking lines.

7 LHCC - May 2000 7 Endcap muon alignment Connect Endcap CSCs to Tracker Tracker co-ordinates (points,  angles) from the MAB modules (via link system) 6 axial lines (transfer lines) pass through the MABs and run outside each CSC station Connection between axial lines and SLMs on transfer plates. Z distance measured by mechanical tubes and optical gap sensors Radial measurements from transfer plates to CSCs by potentiometers CSCs alignment design 3 laser lines per CSC station (SLM) are linked to the axial transfer lines: –SLM measures location of CSCs (on 1/6) –SLMs are 60 degrees apart, mount on CSCs at same point on each chamber –Precise location of sensors on CSCs using internal calibration and photogrammetry –Precise relationship of strips, alignment pins, and sensors on CSCs

8 LHCC - May 2000 8 Endcap muon alignment: Transfer lines and Z measurements Fig 2. EMU Transfer-line Schematics

9 LHCC - May 2000 9 Endcap muon alignment: SLMs CSC LHC Beam M 1 P 1 M 2 P 2    MAB EMU Transfer line CSC SLM-line SLM sensor Transfer Sensor Transfer Plate ALIGNMENT SCHEMATICS SLM Laser 2-D sensor Transfer Plate Transfer Laser Alignment Schematics. Only one transfer laser is shown, at the top-left corner, defining the EMU transfer line. Similarly for the SLM line, only one laser beam, coming from the top is shown. The other laser beams coming from the opposite directions have been omitted for clarity.

10 LHCC - May 2000 10 Barrel alignment status wMechanics: MABs and LED holders wMinimal system test wReadout electronics

11 LHCC - May 2000 11 MAB Modules (External MABs) Barrel cameras Link sensors Endcap transfer sensors

12 LHCC - May 2000 12 MAB development wAluminum prototype used for first tests. wNew prototype under construction (Portugal) Glass fiber 1.5  1 m 2 Study deformations at the junctions (data by June)  define final geometry and materials w3D design of the different MAB structures: most of integration problems (inside the Mu-detector and at boundary region) have been identified.

13 LHCC - May 2000 13 LED holders in the MB chambers - Four forks /chamber - Each fork instrumented with 10 LED (4/6) - LED positions within the holder: 16  m (x,y), 60  m (z) Total number of LED ~ 10000 - Mounting of precalibrated forks and LED driver electronics during chamber assembly at the production sites. - Calibration of each chamber at Cern before installation in the detector Estimated calibration precision: 55-65  m (x,y) 470  m (z)

14 LHCC - May 2000 14 LED Holder mechanical repeatability Deviation wrt to a mean of a series of position-reposition tests

15 LHCC - May 2000 15 BARREL alignment stand (CERN ISR I4-hall) Layout of the Minimal test of the barrel alignment: disposition of alignment components as for the central muon barrel wheels

16 LHCC - May 2000 16 Minimal barrel test results: Accurate reconstruction of LED positions with a floating calibrated MAB referenced by external system  (D5) = 18  m  (D4) = 38  m  (M5) = 11  m  (M4) = 25  m  (G5) = 20  m  (G4) = 52  m

17 LHCC - May 2000 17 Readout electronics Bla bla... MAB Cameras (16 to 24) Temperature Sensors (4 to 16) Board computer Ethernet Control room Slow control MAB - LEDs (0 to 20) Z bar - LEDs (0 to 4) Barrel muon chamber slow control unit Slow control for barrel muon chambers CAN 4 LED holders (<20 LED-s/holder) Chamber I2C AMPRO Littleboard P5i (PC104 type) 146x203x30 mm 3 100/166 MHz Pentium* processor PC/AT compatible system on a single board Up to 128M bytes onboard DRAM PC/104 with PCI extension Floppy, IDE, EPP, Parallel, 4 Serial ports PCI UltraSCSI PCI Super VGA LCD/CRT local bus controller with GUI accelerator High speed Ethernet LAN interface Extensive embedded feature set: ruggedized BIOS, bootable solid state disk, watchdog timer, powerfail NMI, locking I/O connectors, Advanced Power Management Small size +5V only operation, low power requirement, extended temperature operation

18 LHCC - May 2000 18 Minimal barrel test results: Accurate reconstruction of LED positions with a floating calibrated MAB referenced by external system  (D5) = 18  m  (D4) = 38  m  (M5) = 11  m  (M4) = 25  m  (G5) = 20  m  (G4) = 52  m

19 LHCC - May 2000 19 Readout electronics Bla bla... MAB Cameras (16 to 24) Temperature Sensors (4 to 16) Board computer Ethernet Control room Slow control MAB - LEDs (0 to 20) Z bar - LEDs (0 to 4) Barrel muon chamber slow control unit Slow control for barrel muon chambers CAN 4 LED holders (<20 LED-s/holder) Chamber I2C AMPRO Littleboard P5i (PC104 type) 146x203x30 mm 3 100/166 MHz Pentium* processor PC/AT compatible system on a single board Up to 128M bytes onboard DRAM PC/104 with PCI extension Floppy, IDE, EPP, Parallel, 4 Serial ports PCI UltraSCSI PCI Super VGA LCD/CRT local bus controller with GUI accelerator High speed Ethernet LAN interface Extensive embedded feature set: ruggedized BIOS, bootable solid state disk, watchdog timer, powerfail NMI, locking I/O connectors, Advanced Power Management Small size +5V only operation, low power requirement, extended temperature operation

20 LHCC - May 2000 20 Barrel alignment: summary wPrototypes of components exist: wMechanical design of LED holders and video cameras is ok wFinal MAB design under development  Neutron irradiation of the opto-electronic components up to highest barrel doses (fluences = 2.6  10 12 n/cm 2 ): ok wMagnetic field tests (up to 1T) of cameras, LED, and board computer prototype: ok wReadout electronics (prod. version) under development wDAQ + Software test version ready wFirst test of the system concept ok: consistent with expectations wFull simulation of system performance (as for the TDR)

21 LHCC - May 2000 21 Endcap alignment status wMechanical progress wSensor developments wDAQ and software

22 LHCC - May 2000 22 Mechanical progress and Sensor technology Layout Most conflicts resolved: –Required some changes to the disk and cart designs –SLM lines change z position due to RPC chambers layout Mount positions on CSCs defined: Prototype mount plates and towers constructed for ME23/2 chamber Roughly 50% of transfer plate production drawings finished Sensor development The SLM design requires up to 10 sensors in line: –ALMY: Semitransparent a-Si sensors (see later) –DCOPS: Digital CCD optical position sensor 4 linear CCDs mounted in a window frame + cross-hair laser beam Readout with DSP processor and serial I/O Good test results on resolution & stability Radiation test: Test CCDs in 4 MeV proton beam (neutron fluences of 1.3  10 13 n/cm 2  Present version of the CCD and readout are acceptable (safety factor ~3)

23 LHCC - May 2000 23 DCOPS sensor board

24 LHCC - May 2000 24 DCOPS neutron irradiation

25 LHCC - May 2000 25 CCDs neutron irradiation

26 LHCC - May 2000 26 DCOPS neutron irradiation bbb

27 LHCC - May 2000 27 Endcap DAQ and Software wDAQ system (C++ in window98 env.) has two branches: DCOPS readout chain: Line of DCOPS boards read out through serial interface 1 serial processor / disk (Note that the read-out DAQ will be very much the same for DCOPS and ALMY) HP readout chain: HP readout unit contains all multiplexers, switches and signal conditioning hardware 1 HP readout unit /disk wTwo steps offline analysis: FLAP (First Level Analysis Program, C++, OO design on UNIX platform ): Takes raw data from DAQ as input and fits data to find centroid in CCD pixel numbers. Convers HP DC voltage read out appropiate position and temperature units SLAP (Second Level Analysis Program): Takes FLAP output as input and converts the CCD centroid pixel numbers to the real space positions using the position calibration constants.... Design in progress

28 LHCC - May 2000 28 Link system status wMechanical progress wSensor developments (ALMYs and Laser Level) wDAC system and Software

29 LHCC - May 2000 29 Mechanical progress Layout Mechanical drawings in the endcap/barrel region (MAB and ME1/2) ready ME1/1 transfer and mounts on ME1/1 CSCs prototype drawings exits Re-design of the  = 3 region in accordance with the EE calorimeter support TK region in standby... (position and size of passage re-defined for new geometry) Complete prototypes for the ISR tests (tests of mechanical behaoivor): Laser box, Laser Level, distance meas (mechanical tube + optical and potentiometers), periscope -short size, ~40 cm-, DPSDs mounts, re-positionings platforms.

30 LHCC - May 2000 30 Sensors develpoment (1) wALMY: Semitransparent a-Si sensors Performance: Linearity and resolution: 5  m Sensor fiducilization: ~1  m (2D configuration) Radiation hardness: -  (CIEMAT) up to 10 Mrad: ok - n (ATOMKI) total fluence 10 15 n/cm 2 : ok - p (24 GeV/c PS CERN) total fluence 10 13 n/cm 2 : sensors still cooling down... Optical properties: >75 % transmission Serial readout electronics New prototypes development: Stuttgart: succeeded to produce test structures with dark currents as low as required. They proceed now with the fabrication of the first set of complete test sensors with final layout and bonding pads until beginning of July. This effort is carried out -within CMS- by Spain. It is done in collaboration with the MPI (Munich), institute involved in the alignment of the muon chambers of the ATLAS experiment. Minnesota: produced (by Feb 2000) two complete prototypes (with identical geometry as the old EG&G sensors). Their optical and electrical properties have been studied at CIEMAT-Madrid. The electrical test was not satisfactory: the sensors did not show the typical diode curve. Instead, they yield IV curves rather symmetric with respect to the (0,0) point which correspond to two mutually inverted Schottky barriers. This behavior was understood given the high symmetry of the structure (ITO/intrinsic a-Si/ITO) of the prototypes. Two lines of actions have been identified for the new prototypes to be built. The optical test was instead rather satisfactory. The measured transmission for both devices was over 75% and quite flat over the whole working region (wavelength 750-900 nm). New prototypes ( 8 units) will be ready by summer. We will be testing mainly the electrical properties of the junction and charge division between strips, given that the optics is already properly understood. This effort was supported -within CMS- by US and Spain until beginning of 2000. It will continue mainly by Spanish institutes.

31 LHCC - May 2000 31 Semitransparent aSi:H sensors (ALMY) Thickness aSi  1  m Thickness electrodes  100 nm Thickness glass substrate 500  m Number of electrodes 64 horizontal, 64 vertical Active area 20 mm  20 mm Strip pitch312  m Low Hall mobility  B field insensitive Amorphous Si  Rad. hardness Glass substrate  Multi-point meas. 19 mm dia.

32 LHCC - May 2000 32 Sensors develpoment (2) wLaser Level units Consist of: A laser source + a tiltmeter (AGI and AOSI) one or two dimensional Performance: Linearity and resolution: ~10  rad (independent tilt calibration) Stability of the assembly: <5  rad Radiation hardness and insesitivity to B: to be tested - From manufacters (AGI): ok up to 10 Mrad  doses insensitive to uniform fields, and ok up to 80 gauss/mm

33 LHCC - May 2000 33 Tiltmeter (AGI-756) calibration: linearity, resolution and stability V(mV) = 460.35 mV/mrad  (mrad) - 16.39 mV After stabilization  = 0.6  rad TOTAL: 6.7 days After stabilization  = 1.9  rad TOTAL: 6.7 days

34 LHCC - May 2000 34 Laser level: calibration and mechanical stability  _Y_position = 5.6  rad  _AGI1= 5.4  rad  _Y_position = 4.4  rad  _AGI1= 4.1  rad

35 LHCC - May 2000 35 DAQ and Control system + Software DAC configuration: Level 1: includes sensors and local electronics boards(LEB) –LEB: microcontroler with flash program memory and data memory + CAN controler chip –The microcontroler is equiped with: ADC convertors to handle the signal coming from the diferent sensors used (temperatutre, DPSD, tiltmeters,..), a serial port, timers for signal generation and several digital I/O ports to control the 2D position sensors. It will perform basic treatment of the signals (center of gravity, gaussian fits..) –At the moment each LEB handles up to 4? sensors (any type) sitting at < xx m from the actual devices. Level 2: comunication via CAN bus between L1 and industrial PC –Each LEB comunicates via CAN bus protocol with the PC using a Main Controler Interface (a CAN controler board with two ports) placed in the PC –PC for data storage and processing Level 3: comunication via Ethernet between align. PC and Detector Control System (DCS) Software: Level 1: LabView (programming graphic platform) for data acquisition and control. Fully developed for system tests Level 2: CMS OO code for optical alignment (COCOA). Simulation and reconstruction package.(ISR version available)

36 LHCC - May 2000 36 Planned activities (Y2000) wComplete test with Link system, Barrel and Endcap alignment (ISR-I4) ØThe installation of components and DAQ started last week (May 10th) Ø~ 5 weeks for individual calibration of parts ØFirst common data taking by ~ 20 June. ØThe full setup will stay in place up to end of the year wEDR foreseen for October ØEndorse the general scheme ØLED holders for the DT chambers first to go into production

37 LHCC - May 2000 37


Download ppt "LHCC - May 2000 1 THE CMS ALIGNMENT SYSTEM Alignment scheme Task of the align. system Monitor the position of the  -chambers and the CT detectors with."

Similar presentations


Ads by Google