Presentation is loading. Please wait.

Presentation is loading. Please wait.

THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System.

Similar presentations


Presentation on theme: "THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System."— Presentation transcript:

1 THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System

2 THE FOSTER GROUP TFGTFG 10/10/2015 Page 2 DWSD CIP Statistics – Sewage Disposal System During the 1990s, DWSD invested approximately $730 million (~$73 million annually) in capital improvements to the water system During the 1990s, DWSD invested approximately $730 million (~$73 million annually) in capital improvements to the water system During the 2000’s, the corresponding figure is $1.56 billion (~$156 million annually) During the 2000’s, the corresponding figure is $1.56 billion (~$156 million annually) The July 2008 CIP called for an additional $1.7 billion over 5 years (~$340 million annually) The July 2008 CIP called for an additional $1.7 billion over 5 years (~$340 million annually) The updated July 2009 5-year CIP anticipates the need for just over $1.0 billion (~$200 million annually) The updated July 2009 5-year CIP anticipates the need for just over $1.0 billion (~$200 million annually)

3 THE FOSTER GROUP TFGTFG 10/10/2015 Page 3 Annual Capital Improvement Investments Sewage Disposal System – ($ millions)

4 THE FOSTER GROUP TFGTFG 10/10/2015 Page 4 Annual Capital Improvement Investments Sewage Disposal System – ($ millions)

5 THE FOSTER GROUP TFGTFG 10/10/2015 Page 5 Capital Improvement Program – Sewage Disposal System Criteria in Report Criteria in Report Primary Project Purpose Primary Project Purpose  1 – Directly Mandated for Regulatory Compliance  2 – Necessary for Regulatory Compliance Mandates  3 – System Reliability  4 - Technological Advance / Efficiency  5 – New Service Areas Allocation Status Allocation Status  D - Detroit Only  S - Suburban Only  M - Macomb Only  C/O - Clinton/Oakland Only  C/O & Mac - Clinton Oakland and Macomb  83/17 - New Wet Weather Facilities  CTA - Common to all

6 THE FOSTER GROUP TFGTFG 10/10/2015 Page 6 Sewage Disposal System CIP - FUNDED Financing Requirement Summary

7 THE FOSTER GROUP TFGTFG 10/10/2015 Page 7 Sewage Disposal System CIP - FUNDED Financing Requirement Summary

8 THE FOSTER GROUP TFGTFG 10/10/2015 Page 8 Sewage Disposal System CIP Comparison July 2009 vs. July 2008– ($ millions)

9 THE FOSTER GROUP TFGTFG 10/10/2015 Page 9 DWSD CIP Observations – Sewage Disposal System Dramatic reductions in every year Dramatic reductions in every year 2-year Funding Window: 2-year Funding Window: 45% of Prior CIP 45% of Prior CIP Reflects reduction of almost $500 million Reflects reduction of almost $500 million Deferral/Elimination of Environmental Projects pending negotiation of new scope & schedule Deferral/Elimination of Environmental Projects pending negotiation of new scope & schedule Upper Rouge Tunnel ($337 million short term reduction) Upper Rouge Tunnel ($337 million short term reduction) Detroit River Outfall #2 ($185 million short term reduction) Detroit River Outfall #2 ($185 million short term reduction)

10 THE FOSTER GROUP TFGTFG 10/10/2015 Page 10 DWSD CIP Observations – Sewage Disposal System Elimination of Oakland/Macomb Interceptor Projects (asset to be transferred) Elimination of Oakland/Macomb Interceptor Projects (asset to be transferred) $186 million reduction ($26 million in Funding Range) $186 million reduction ($26 million in Funding Range) Added Long Term Incinerator Improvements Added Long Term Incinerator Improvements $130 million addition ($2 million in Funding Range) $130 million addition ($2 million in Funding Range) Addresses cancellation of Synagro Contract Addresses cancellation of Synagro Contract Other moderate deferrals to match construction schedules Other moderate deferrals to match construction schedules


Download ppt "THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System."

Similar presentations


Ads by Google