Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools.

Similar presentations


Presentation on theme: "1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools."— Presentation transcript:

1 1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools

2 2 | Add Title and Date via 'View/Header and Footer'. E.g.: Corporate Presentation, November 12, 2008 Consensus flowchart

3 3 | Add Title and Date via 'View/Header and Footer'. E.g.: Corporate Presentation, November 12, 2008 Delegation

4 4 | Add Title and Date via 'View/Header and Footer'. E.g.: Corporate Presentation, November 12, 2008 Recommendation IEC project teams shall try and find a consensus. However, when one group becomes over- represented and shares a common interest, it may become more interesting to force the vote. This will not happen when countries are represented by up to three members, but it may happen when there is a larger imbalance. In these situations, voting per country is suitable solution, also because the CD and CDV are voted upon per country. The TC88 is asked to confirm this solution.

5 5 | Corporate Presentation, October 9, 2015 vestas.com Thank you for your attention Copyright Notice The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.


Download ppt "1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools."

Similar presentations


Ads by Google