Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project-based instruments: economic consequences of the Kyoto and Buenos Aires framework and options for future development Axel Michaelowa Hamburg Institute.

Similar presentations


Presentation on theme: "Project-based instruments: economic consequences of the Kyoto and Buenos Aires framework and options for future development Axel Michaelowa Hamburg Institute."— Presentation transcript:

1 Project-based instruments: economic consequences of the Kyoto and Buenos Aires framework and options for future development Axel Michaelowa Hamburg Institute for Economic Research, Germany michaelo@easynet.fr Conference “Flexible Mechanisms for an Efficient Climate Policy”, Stuttgart, Germany, July 28, 1999

2 Functioning of the CDM

3 CDM enhances industrial country emission budgets CDM Kyoto commitment Country 1 Country 2 JI

4 Differences CDM-JI -CDM credits from 2000, JI credits from 2008. -JI credits subtracted from host country emission budget -JI credits “supplemental”; CDM credits cover “part” of the emission target. -JI credits freely tradable; unclear for CDM credits -JI credits from sequestration; unclear for the CDM -Only CDM projects pay adaptation tax/administration fee -CDM credits need independent certification; unclear for JI -No JI credits if investor country does not meet reporting requirements; no such rule for CDM credits -JI credits frozen if compliance is in doubt -Institutional structure of CDM

5

6 Advantages for JI  Lower verification and certification costs  Lower need for capacity building  No adaptation tax  Lower institutional costs  Sink projects Advantages for CDM  Early crediting  Bigger supply of low-cost projects

7 Estimates for the potential of the CDM

8 Effects of ceilings on CDM and JI First come - first serve Proportional discounting Discretionary allocation Unclear allocation rules Project-oriented mechanisms disadvantaged as credits accrue only ex-post

9 Institutional design of the CDM Multilateral fundMultilateral fund –Spread of project risks –Reduction of transaction costs –Bureaucratic inefficiencies? International clearinghouse –Tender of projects –Reduction of transaction costs –No minimum price! Project exchange –Collection of information on proposals

10 Baseline setting Environmental effectiveness Economic efficiency Critical parameters Economic additionality Leakage Lifetime

11 Economic viability of the project Costs Possible cutoff points Project overall costs 0 A B C B: accept projects above a negative cost threshold due to barrier removal or alternative rates of return Number of projects A: accept all projects that reduce emissions compared to status quo C: only accept projects with positive costs

12 Lifetime of the baseline Project startTime Regular revision Economic lifetime Technical lifetime Surprise

13 Simplified approaches Top-down baselinesTop-down baselines BenchmarksBenchmarks Technology matrixTechnology matrix Default project type matrixDefault project type matrix Project baseline standardizationProject baseline standardization All need strong capacity building in host countries

14 Spatial benchmarks Globalaverage Regionalaverage U.S.average g CO 2 per kWh electricity Can be used at any degree of spatial aggregation Criteria how to decide on this degree remain to be defined Texasaverage

15 Time dimension of benchmarks Past now Future Historical average Average of equipment installed during last 5 years Projected average of equipment installed in next 5 years Simplification: calculate Autonomous GHG Efficiency Improvement (AGEI)

16 Competing baseline approaches or a common framework? „Optimal“ baselines will depend on situation and project type: forestry, infrastructure, policies, large number of projects in all sectors: highly aggregated benchmarks, top-down large projects, many projects in a specific sector, fuel substitution: sector-specific, technology or default matrix small projects such as renewables, retrofits, small number of projects: project-related, technology or default matrix Test different approaches!

17 Issues for future development of CDM and JI Alignment of the mechanisms –Adaptation tax on all transfers of permits –Early JI, coupled with “hot air” reduction Development of models for and decisions on CDM institutions Development of and decisions on baseline methodologies


Download ppt "Project-based instruments: economic consequences of the Kyoto and Buenos Aires framework and options for future development Axel Michaelowa Hamburg Institute."

Similar presentations


Ads by Google