Presentation on theme: "ProCure Putting Information & Communication Technologies to Work for the Construction Industry Taylor Woodrow Fortum Engineering DaimlerChrysler Corus."— Presentation transcript:

1 ProCure Putting Information & Communication Technologies to Work for the Construction Industry Taylor Woodrow Fortum Engineering DaimlerChrysler Corus Ed Züblin Bayswater Institute VTT Building Technology Leeds University Haas & Partner Taylor Woodrow Fortum Engineering DaimlerChrysler Corus Ed Züblin Bayswater Institute VTT Building Technology Leeds University Haas & Partner

2 Project Partners Construction Companies R & D Partners Bayswater Institute Social Science institute

3 Main goals To take a significant and achievable step forward in the application of available ICT to Large Scale Engineering (LSE) construction industry Improve definition of - the overall procurement process - a scenario for distributed integration - a deployment methodology ( also the human factors) - identification of protocols and standards support the integration of the process

4 Objectives (1/2) To show that advanced ICT in the LSE industry is possible, applicable, and scaleable to company and project size. To deploy the methodology and supporting software. To quantify the benefits of the industrial deployments. To stimulate the SME software industry to accelerate and broaden new product development.

5 Objectives (2/2) To establish a methodology for deploying ICT technology To prepare "Best Practice" guidelines on the approach To identify and address the issue of reducing the human and social obstacles To use ProCure as an opportunity for external national projects and industry initiatives.

6 Approach Define scenarios and specify supporting ICT within 1st year and to agree on pilots. Workforce will be trained for pilots. Study human-centred aspects in the design of systems and planning for deployment, implementation, usage and management

7 ProCure PILOT 1 Product model based processes and tools in real tender cases Fortum Engineering Fortum

8 Scope of the Pilot 1 project Focus on real tender cases of power plants Usage of the best currently available tools from client’s specifications to a tender in a power plant project Training people to work with new tools and processes Partners assistance: VTT - information exchange system and training BI – sociological aspects

9 Pilot 1: Tender cases Bio Mass District Heat Plant Customer on private sector Bio-fired CHP-plant 20MWth district heat (base load) CFB boiler will be delivered by FE Combined Heat and Power (CHP) Plant Tychy Poland Circulated Fluidized Bed (CFB) Boiler Coal fired and max. 5 % bio mass 95 MWe electrical output 152 MWth district heat output EPC delivery Waste Energy Plant Waste fuel fired: 400 000 t/a 36 MWe electrical output EPC delivery Boiler delivered by a partner Fortum

10 Pilot 1: Tender phase processes and tools (ScopePower) (Simo-2) (CostPower Cost libraries) (Pricing tool) BI VTT Human issues Scope defining Delivery simulation Cost estimation Pricing and risk assessment IMP/data management and standardisation Fortum FE

11 Pilot 1 - Information Management Platform VTT Building Technology

12 IMP system

13 IMP Main functions of IMP Retrieve file from doc mgt system Store file to doc mgt system Edit metadata Link file to a product model object Remove models Merge product models List models Extract partial product model data Store product model

14 IMP user interface VR window Available models on the server Available methods for the selected objects in VR window Common IMP functions

15 ProCure PILOT 2 Taylor Woodrow Corus With: Bayswater Institute Leeds University CAE Group Sarcophagus Ltd The Christie Fields 2 Project Participants Taylor Woodrow Corus Bayswater Institute Leeds University Taylor Woodrow Corus Bayswater Institute Leeds University

16 Scope of the Pilot 2 project Focus on the interaction between the magior participants in the design, procurement and construction of a medium size office building Rationalise the design, procurement and construction processes involved in the development of medium size office buildings to produce a “Concept Building” approach Investigate the advantages of the adoption of 3 D project modelling

17 Christie Fields 2 Taylor Woodrow

18 Interworking of corporate and project systems XML Messaging Leeds University

19 UK Pilot Demonstrator

20 ProCure Business Processes, Scope and Selection of Deployment Pilots Pilot 3 (DaimlerChrysler, Haas+Partner and Ed. Züblin)

21 Customer Supplier B Supplier C Supplier A Integration of the internal and external design partners and design data using a web based common project environment Integration of the internal and external design partners and design data using a web based common project environment