Presentation is loading. Please wait.

Presentation is loading. Please wait.

OTREC Spotlight Partner: ODOT OTRECs primary research partner is the Oregon Department of Transportation. This is reflected in the number of projects and.

Similar presentations


Presentation on theme: "OTREC Spotlight Partner: ODOT OTRECs primary research partner is the Oregon Department of Transportation. This is reflected in the number of projects and."— Presentation transcript:

1 OTREC Spotlight Partner: ODOT OTRECs primary research partner is the Oregon Department of Transportation. This is reflected in the number of projects and financial support granted to ODOT priorities and initiatives. The following provides a brief progress-to-date overview of this sizable OTREC- ODOT partnership. OTREC-ODOT By the Numbers Number of ODOT-partnered proposals received: 54 (39%*) Number of ODOT-partnered projects funded: 24 (43%*) Number of ODOT Sections/Units involved: 6 Number of dollars awarded to ODOT-partnered research: $1,156,068 (41%*) *Percentages reflect total OTREC program ODOT-Partnered Initiatives Funded to Date by Section/Unit ODOT Research (17 Projects | $847,202) Identify and Address Institutional Barriers Delaying Incident Clearance Evaluation of the Oregon DMV At-Risk Driver Program Socio-economic effect of vehicle mileage fees: Phase Evaluation of the Oregon DMV At-Risk Driver Program: Year Application of WIM Data for Improved Modeling, Design, and Rating Influence of Environmental Effects on Durability of CFRP for Shear Strengthening of RC Girders: Year 2 --Continued on back Socio-economic Effect of Vehicle Mileage Fees Developing a Coordinated Professional Development Program for OTREC Using Existing ITS Commercial Vehicle Operation (ITS/CVO) Data to Develop Statewide (and Bi-state) Truck Travel Time Estimates and Other Freight Measures Factors for Improved Fish Passage Waterway Construction Influence of Environmental Effects on Durability of CFRP for Shear Strengthening of RC Girders

2 *Project listed under more than one ODOT Section/Unit sponsor ODOT Research (cont) Instrumentation for Mechanistic Design Implementation Development of an Open Source Bridge Management System Using Archived ITS Data to Measure the Operational Benefits of a System-Wide Adaptive Ramp Metering System Evaluating the Effectiveness of the Safety Investment Program (SIP) Policies for Oregon Freight Performance Measures: Approach Analysis Access Management Best Practices Manual OTREC Spotlight Partner: ODOT ODOT Traffic-Roadway Section (2 Projects | $80,000) Empirical Observation of the Impact of Traffic Oscillations on Freeway Safety Expanding Development of the Oregon Traffic Safety Data Archive ODOT Region 1 (1 Project| $28,922) Application of LRFD Principles for Deep Foundations in Oregon: Phase 1* ODOT T 2 /LTAP (1 | $11,542) : Developing a Coordinated Professional Development Program for OTREC* ODOT Bridge Section (3 Projects | $136,355) Application of LRFD Principles for Deep Foundations in Oregon: Phase 1* Performance Enhancement of Bridge Bracing Under Service and Extreme Loads Seismic Damage State Models for Oregon Bridges ODOT ITS (2 Projects | $80,696) Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice: Phase 2


Download ppt "OTREC Spotlight Partner: ODOT OTRECs primary research partner is the Oregon Department of Transportation. This is reflected in the number of projects and."

Similar presentations


Ads by Google