Presentation is loading. Please wait.

Presentation is loading. Please wait.

ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 1 T24 – STEP Manufacturing Team leader –Martin Hardwick Deputy –Chiaki Sakamoto Exploder

Similar presentations


Presentation on theme: "ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 1 T24 – STEP Manufacturing Team leader –Martin Hardwick Deputy –Chiaki Sakamoto Exploder"— Presentation transcript:

1 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 1 T24 – STEP Manufacturing Team leader –Martin Hardwick Deputy –Chiaki Sakamoto Exploder –step-manufacturing@steptools.comstep-manufacturing@steptools.com Archive –http://www.steptools.com/manforum/meetings.html

2 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 2 T24 – STEP-Manufacturing Accomplishments –AP-224 (features) ed3 published –AIC 522 (features) ed2 published –AP-219 (inspection) DIS ballot in progress –AP-223 (castings) CD ballot passed –AP-229 (forgings) NWI ballot passed –AP-238 (machining) IS ready to be sent to Geneva

3 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 3 Schedule –Monday, 2006-06-26, 1300-1700 Status update of all AP’s Status update on ISO 13399 (cutting tools) Traceability Plans for Wednesday –Tuesday, 2006-06-27, 0800-1700 Review of AP-223 (castings) Review of AP-229 (forgings) Review of AP-219 (inspection) Discussion of possible SED’s for AP-240 (planning) Gears and AP-224 T24 – STEP-Manufacturing

4 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 4 Schedule –Wednesday, 2006-06-28, 0800-1700 Industry day – machining demonstration Industry day – panel session See meeting web site for detailed schedule –Thursday, 2006-06-29, 0800-1800 Joint meeting with SC1* Discussion of Busan (Korea) demonstration Discussion of future projects AP-238 IS walkthru Discussion of AP-238 CC1 implementation testing T24 – STEP-Manufacturing *Minutes of the joint meeting will be issued by the SC1/Wg7 Convenor

5 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 5 Attendees Fred ProctorUSA/NIST Sid VenkateshUSA/Boeing Chiaki SakamotoJapan/MER Alain BrailFrance/Airbus Julio GarridoSpain/Vigo University Lena PersonSweden/Sandvik Len SlovenskyUSA/SCRA Alan CrawfordUK/LSC Bill FreemanUSA/SCRA Rob LeiblandtUS DoD (SC31 Liaison) Gero BanseultGermany/TUU Roland MaranzanaCanada/ETS Juha SaaskiFinland/VTT Tapio SalonenFinland/VTT Akinobu HatadaJapan/Tanatsugu Martin HardwickUSA/STEP Tools Raj IyerUSA/Army Jonas NordstromSweden/Sandvik Olof NyqvistSweden/KTH David LoffredoUSA/STEP Tools Ian StroudEPFL/Switzerland David OdendahlUSA/Boeing

6 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 6 Attendees Continued Suk Hwan SuhPostech/Korea Akram YunasAIAG/USA Donalf GalwayAIAG/USA Gernot RossiSiemens/Germany Carol TierneyGeneral Dynamics/USA Stephen NewmanUniversity of Bath/UK Jean-Yves HascoetECN-IRCCyn/France Van Khai NguyenCadcamation/Switzerland Dimitri KirtsisEPFL/Switzerland Canada (1), Finland(2), France(2), Germany(2), Japan(2), Korea(1), Spain(1), Sweden(3), Switzerland(4), USA(12), UK(2)

7 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 7 Highlights of Toulouse Demonstration 100 attendees Successfully machined 5-axis test parts Machining using STEP features Contributions from France, UK, USA, Sweden, Germany Presentations from France, UK, USA, Germany, Korea, Japan, Sweden, Spain, Switzerland Test parts from Boeing and Airbus Demonstrated use of STEP AP’s for design, planning and manufacturing

8 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 8 Toulouse Demonstration AP-203 File STEP Trans AP-224 File AP-238 File Path 2 Direct Translation Path used for feature Roughing Path used for 5-axis Finishing Airbus “Fish” and Boeing “Fin”

9 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 9

10 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 10

11 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 11

12 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 12 Demonstration Summary STEP-NC is easy to implement –Basic prototype in 4 weeks –Level 2 by adding CAD geometry Machining benefits –CNC independent tool paths –Collision detection on the control –Feature based re-programming –Visual closed loop programming Enterprise benefits –Long term data retention –Interchange with suppliers

13 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 13 Demonstration Attendees

14 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 14 Plans for Hershey Regular meetings on October 23 and 24 Implementor’s Forum Wednesday October 25 T24 Site Visit to Harley Davidson (Evening) Joint meeting with SC1 on October 26 (Tentative)

15 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 15 Hershey Implementor’s Forum Wednesday October 25 Morning – Inspection and Machining –Aerospace part and automotive part –Videos of machining the parts –Videos of inspecting the parts Afternoon – Forum Discussion –Identify gaps –Actions for emerging standards –Actions for existing standards –Strategy for global acceptance

16 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 16 Plans before Hershey Deliver IS of AP-238 to ISO Complete DIS ballot for AP-219 International Interoperability Testing

17 ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 17 International Interoperability Testing AP-238 CC1 (Toolpath Programming) Phase 1 (July – August 2006) –Determine participants –Gather test files –Finalize implementation guidelines Phase 2 (September – October 2006) –Implement AP-238 CC1 export for CAM –Implement AP-238 CC1 converters for CNC –Verify using CNC simulators at Hershey meeting


Download ppt "ISO TC184/SC4/WG3 Toulouse N000 2006-06-18 1 T24 – STEP Manufacturing Team leader –Martin Hardwick Deputy –Chiaki Sakamoto Exploder"

Similar presentations


Ads by Google