Presentation is loading. Please wait.

Presentation is loading. Please wait.

One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.

Similar presentations


Presentation on theme: "One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange."— Presentation transcript:

1 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange Meeting on Performance Metrics Action Plans 2, 5 and 6 Hosted by CENA May 2002 Toulouse Welcome

2 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 2 Overview Context Objectives Organisation Schedule Logistics

3 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 3 Context (1) Action Plan 2: Air Traffic Operational Concepts Action Plan 5: Validation and Verification Strategy Action Plan 6: ATM Decision Support Tools

4 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 4 Context (2) Air Traffic Management services are facing a continuously increasing demand in air traffic. We need to evolve from technology push and political decisions to a performance driven approach. We need the right metrics to understand demand and performance

5 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 5 Objectives To exchange knowledge and increase our common understanding of performance metrics in ATM. To extend / enforce our network To discuss our challenges To propose future (joint) activities To generate some brilliant sparks ??

6 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 6 Organisation Plenary parts (day 1 AM and day 3 AM) Introduction Conclusions 3 parallel tracks (day 1 AM and day 2) Target Setting and Concept Development Development and Validation Post-day Analysis

7 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 7 Schedule Day 1

8 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 8 Schedule Day 2

9 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 9 Schedule Day 3

10 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 10 Logistics Local organisation by CENA: Lunch on day 1 and day 2 At the local restaurant (buy your tickets today) Lunch on day 3 At your own choice (also use a ticket) Day 2 dinner Voluntary participation; own expenses sign-up today! We need to make a reservation Transport: Use metro and bus

11 One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 11 May this be a fruitful event Questions?


Download ppt "One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange."

Similar presentations


Ads by Google