Presentation is loading. Please wait.

Presentation is loading. Please wait.

© EUROCONTROL 2013 – Network Manager (NM/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Michel Wuestenberghs EDITION 16/01/2013 FUNCTIONAL DATA.

Similar presentations


Presentation on theme: "© EUROCONTROL 2013 – Network Manager (NM/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Michel Wuestenberghs EDITION 16/01/2013 FUNCTIONAL DATA."— Presentation transcript:

1 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Michel Wuestenberghs EDITION 16/01/2013 FUNCTIONAL DATA REQUIREMENTS

2 2 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ATM systems ETFMS - SYSTEM OVERVIEW Rx Meteo Interface Rx AN3 Tx Entry Nodes SDPS F FDPS IFPU1 (Haren) ETFMS Central Server (ETFMS-CS) ANg1 ENV Local Terminals Remote Terminals (CHMI) IFPU2 (Brétigny) AFTN/CIDIN AMHS Wide Area Network (PENS) NM (CFMU) ACC

3 3 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - ARCHITECTURE

4 4 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - ARCHITECTURE EN-A EN-B Router EN-A EN-B Router ATS Correlated Position Data Flight data (FSA) ATS EN-A EN-B Router ATS AN3 Router ECMC Others CS ECMC Router AN3 Others CS WAN (PENS) Haren (Brussels Belgium) Brétigny (near Paris France) Correlated Position Data Flight data (FSA) Correlated Position Data Flight data (FSA) ANSP (ECAC Member States)

5 5 © EUROCONTROL 2013 – Network Manager (NM/CFMU) EN – Planning 2013 Installation Planning 2013 Installation Planning 2013 Serbia-Montenegro (Belgrade) Serbia-Montenegro (Belgrade) installed Dec2012 installed Dec2012 CPR validation Q1 2013 CPR validation Q1 2013 Ukraine (Kiev) Ukraine (Kiev) Installation Mar2013 Installation Mar2013 Poland (Warsaw) Poland (Warsaw) Installation Q2-Q3 2013 Installation Q2-Q3 2013

6 6 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - INSTALLED SITES Installed Planned 2013 Pending

7 7 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - EN Physical view

8 8 © EUROCONTROL 2013 – Network Manager (NM/CFMU) EN - Data Functions (1) Data Collection Data Collection Interface to various ATS configurations at different sites Interface to various ATS configurations at different sites Receive Position Data (tracks) and Flight Plan Data Receive Position Data (tracks) and Flight Plan Data Data Forwarding Data Forwarding Connection Management, Frame Assembly Connection Management, Frame Assembly Data Replication to several recipients Data Replication to several recipients

9 9 © EUROCONTROL 2013 – Network Manager (NM/CFMU) EN - Data Functions (2) Data Processing for CPRs Data Processing for CPRs Convert data to common representation (ASTERIX CAT062) Convert data to common representation (ASTERIX CAT062) Transform Coordinates into WGS84 Transform Coordinates into WGS84 Maintain Track and Flight Plan Database Maintain Track and Flight Plan Database User Controlled Data Reduction User Controlled Data Reduction Update Tracks and Flight Plan data Id fields Update Tracks and Flight Plan data Id fields

10 10 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - Data Items (1) Mandatory Asterix CAT062 Data Items for CPRs Aircraft Identification (callsign) Flight Level Aircraft Position ADEP / ADES EOBT (*) Mode 3/A SSR Code

11 11 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - Data Items (2) Optional Asterix CAT062 Data Items IFPS_Flight_ID 24bit ICAO Aircraft address Track Status Aircraft Velocity Rate of Climb and Descent Rate of Turn

12 12 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - Interfaces (1) Supported Input Data Formats ASTERIX CAT062 (v0.17 or v1.3 up to v1.9) FSA (*) ADEXP (*) Needed in case flight data items (e.g. ADEP, ADES, EOBT, IFPLID) are not present in the position data stream and/or to filter out VFR and OAT traffic.

13 13 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - Interfaces (2) Supported Connection Types TCP (¹) UDP (¹) X25 HDLC Datagram RMCDE ARTAS AFTN - Async (²) (¹) Preferred (²) In case FSA messages are needed

14 14 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - PROCESS (1) Agreement on the technical interfaces between EN and ATC system - ICD Signature of Letter of Agreements (LoA), related to Data provision Equipment (ownership, installation, etc) Financial conditions

15 15 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - PROCESS (2) Adaptations, if any, in ATC systems Purchase and installation by NM (CFMU) of EN Validation of received data ( CPRs ) in NMOC (CFMU) test system Move of received data ( CPRs ) to NMOC (CFMU) operational system FAM activation (after agreement with ANSP)

16 16 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - PROCESS (3) CPR Operational Evaluation Provide live data to ETFMS Shadow/test system. NMOC (CFMU) Evaluates and provides evaluation report to ANSP. Improvements may be required. Go-No-Go decision. Agree date to send CPRs to ETFMS Operational system.

17 17 © EUROCONTROL 2013 – Network Manager (NM/CFMU) ETFMS - PROCESS (4) Costs NM (CFMU) provides Entry Node. NM (CFMU) provides network connection. NMOC (CFMU) Operates Entry Node. ANSP is requested to: Supply space for EN rack in the computer room Supply power for the EN Adapt software of its ATC systems if required Provide customs/import information for the EN equipment

18 18 © EUROCONTROL 2013 – Network Manager (NM/CFMU) Your questions are very welcome

19 © EUROCONTROL 2013 – Network Manager (NM/CFMU) Thank you for your attention Thank you for your attention Michel Wuestenberghs michel.wuestenberghs@eurocontrol.int Michel Wuestenberghs michel.wuestenberghs@eurocontrol.int


Download ppt "© EUROCONTROL 2013 – Network Manager (NM/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Michel Wuestenberghs EDITION 16/01/2013 FUNCTIONAL DATA."

Similar presentations


Ads by Google