1 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ATM systems ETFMS - SYSTEM OVERVIEW R Meteo Interface T AN-3 R Entry Nodes SDPS F FDPS FP-1 (Haren) ETFMS.

Similar presentations


Presentation on theme: "1 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ATM systems ETFMS - SYSTEM OVERVIEW R Meteo Interface T AN-3 R Entry Nodes SDPS F FDPS FP-1 (Haren) ETFMS."— Presentation transcript:

1 1 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ATM systems ETFMS - SYSTEM OVERVIEW R Meteo Interface T AN-3 R Entry Nodes SDPS F FDPS FP-1 (Haren) ETFMS Central Server (ETFMS-CS) AN-1 ENV Local Terminals Remote Terminals FP-2 (Brétigny) AFTN CIDIN Wide Area Network (s) NM (CFMU) ACC

2 2 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - ARCHITECTURE

3 3 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - ARCHITECTURE EN-A EN-B Router EN-A EN-B Router ATS Correlated Position Data Flight data (FSA) ATS EN-A EN-B Router ATS AN3 Router ECMC Others CS ECMC Router AN3 Others CS WAN Haren Brétigny Correlated Position Data Flight data (FSA) Correlated Position Data Flight data (FSA)

4 4 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - INSTALLED SITES Installed Planned 2012 Pending

5 5 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - EN Physical view

6 6 © EUROCONTROL 2012 – Network Manager (NM/CFMU) EN - Data Functions (1) Data Collection Data Collection Interface to various ATS configurations at different sites Interface to various ATS configurations at different sites Receive Position Data (tracks) and Flight Plan Data Receive Position Data (tracks) and Flight Plan Data Data Forwarding Data Forwarding Connection Management, Frame Assembly Connection Management, Frame Assembly Data Replication to several recipients Data Replication to several recipients

7 7 © EUROCONTROL 2012 – Network Manager (NM/CFMU) EN - Data Functions (2) Data Processing Data Processing Convert data to common representation (ASTERIX CAT062) Convert data to common representation (ASTERIX CAT062) Transform Coordinates into WGS84 Transform Coordinates into WGS84 Maintain Track and Flight Plan Database Maintain Track and Flight Plan Database User Controlled Data Reduction User Controlled Data Reduction Update Tracks and Flight Plan data Id fields Update Tracks and Flight Plan data Id fields

8 8 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - Data Items (1) Mandatory Data Items Aircraft Identification (callsign) Flight Level Aircraft Position ADEP / ADES EOBT (*) Mode 3/A SSR Code

9 9 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - Data Items (2) Optional Data Items IFPS_Flight_ID 24bit ICAO Aircraft address Track Status Aircraft Velocity Rate of Climb and Descent Rate of Turn

10 10 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - Interfaces (1) Supported Input Data Formats ASTERIX CAT062 (v0.17 or v1.3) FSA (*) (*) Needed in case flight data items (e.g. ADEP, ADES, EOBT, IFPLID) are not present in the position data stream and/or to filter out VFR and OAT traffic.

11 11 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - Interfaces (2) Supported Connection Types TCP (¹) UDP (¹) X25 HDLC Datagram RMCDE ARTAS AFTN - Async (²) (¹) Preferred (²) In case FSA messages are needed

12 12 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - PROCESS (1) Agreement on the technical interfaces between EN and ATC system - ICD Signature of Letter of Agreements (LoA), related to Data provision Equipment (ownership, installation, etc) Financial conditions

13 13 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - PROCESS (2) Adaptations, if any, in ATC systems Purchase and installation by NM (CFMU) of EN Validation of received data ( CPRs ) in NMOC (CFMU) test system Move of received data ( CPRs ) to NMOC (CFMU) operational system FAM activation (after agreement with ANSP)

14 14 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - PROCESS (3) CPR Operational Evaluation Provide live data to ETFMS Shadow/test system. NMOC (CFMU) Evaluates and provides evaluation report to ANSP. Improvements may be required. Go-No-Go decision. Agree date to send CPRs to ETFMS Operational system.

15 15 © EUROCONTROL 2012 – Network Manager (NM/CFMU) ETFMS - PROCESS (4) Costs NM (CFMU) provides Entry Node. NM (CFMU) provides network connection. NMOC (CFMU) Operates Entry Node. ANSP is requested to: Supply space for EN rack in the computer room Supply power for the EN Adapt software of its ATC systems if required

16 16 © EUROCONTROL 2012 – Network Manager (NM/CFMU) Your questions are very welcome

17 © EUROCONTROL 2012 – Network Manager (NM/CFMU) Thank you for your attention Thank you for your attention Michel Wuestenberghs Michel Wuestenberghs