Presentation is loading. Please wait.

Presentation is loading. Please wait.

Edition 3 of The PIANC RIS guidelines Cas Willems (Chairman PIANC WG 125),

Similar presentations


Presentation on theme: "Edition 3 of The PIANC RIS guidelines Cas Willems (Chairman PIANC WG 125),"— Presentation transcript:

1 Edition 3 of The PIANC RIS guidelines Cas Willems (Chairman PIANC WG 125),

2 PIANC RIS working Group  Tasks: –Status report on the implementation and operation of River Information Services –Update of the PIANC RIS Guidelines 2004  RIS working group members from: –Austria, Belgium, China, Czech Republic, Finland, France, Germany, Hungary, Poland, Russia, Serbia, The Netherlands (Chairman), USA,

3 PIANC RIS guidelines  Edition 1: 2002  Edition 2: 2004  The PIANC guidelines became accepted in different parts of the world and are the basis for: –the RIS directive of the European Commission (Directive 2005/44/EC - as amended) –RIS Guidelines and Recommendations for River Information Services of the CCNR annex to protocol 2003-I-22 –UNECE Resolution No.57 on River Information Services

4 Why updating the Guidelines ?  Experiences and lessons learned on implementation of RIS services  RIS key technologies developed and formalised –Standards included –Technological developments included –Reference data, RIS index, Hull data were missing  Practical experiences on implementation processes of RIS in 2011 versus research status of RIS in 2004  Omissions and corrections

5 Revised guidelines Edition 2 – Definitions  Taken over in edition 3 with some additional definitions Edition 3 - Definitions  RIS Operator;  RIS Provider;  RIS key technologies. Separate document on RIS definitions

6 Revised guidelines Edition 2 Chapter on architecture of RIS with:  RIS-Stakeholders  RIS objectives  RIS tasks  RIS services  RIS functions and information needs  RIS regulations  RIS applications  RIS systems Edition 3 Chapter on Objectives, Services and Stakeholders  RIS Objectives as edition 2  RIS Services (see next slide)  RIS Stakeholders detailed description/specification  RIS services as a separate chapter.  General descriptions on tasks, regulations, applications and systems are deleted

7 RIS Services Table 3.3 RIVER INFORMATION SERVICES Mainly traffic related 1 Fairway information Services (FIS) 2 Traffic information (TI) a) Tactical traffic information (TTI) b) Strategic traffic information (STI) 3 Traffic management (TM) a) Local traffic management (vessel traffic services - VTS) b) Lock and bridge management (LBM) c) Traffic Planning TP 4 Calamity abatement support (CAS) Mainly transport related 5 Information for transport logistics (ITL) a) Voyage planning (VP) b) Transport management (TPM) c) Inter-modal port and terminal management (PTM) d) Cargo and fleet management (CFM) 6 Information for law enforcement (ILE) 7 Statistics (ST) 8 Waterway charges and harbour dues (CHD) Table 4.5 RIVER INFORMATION SERVICES Mainly traffic related 1 Fairway information service (FIS) a) Visual aids to navigation b) Radiotelephone service on inland waterways c) Internet service d) Electronic navigational chart service 2 Trafic information (TI) a) Tactical traffic information (TTI) b) Strategic traffic information (STI) 3 Traffic management (TM) a) Local traffic management (vessel traffic services - VTS) b) Navigational support (NS) c) Lock and bridge management (LBM) 4 Calamity abatement support (CAS) Mainly transport related 5 Information for transport logistics (ITL) a) Voyage planning (VP) b) Transport management (TPM c) Inter-modal port and terminal management (PTM) d) Cargo and fleet management (CFM) 6 Information for law enforcement (ILE) 7 Statistics (ST) 8 Waterway charges and harbour dues (CHD)

8 Revised guidelines Edition 2 annexes on standardisation processes  Inland ECDIS  Inland AIS  Electronic reporting  Notices to Skippers Edition 3 Chapter on RIS key technologies  Inland ECDIS  Inland AIS  Electronic reporting  Notices to Skippers  RIS reference data –Hull data –RIS index  RIS related technologies –Radar, VHF  Use of open standards

9 RIS key technologies and reference data

10 Revised guidelines Edition 2 Recommendation for individual services:  Restricted description of the RIS services and no specification on: –Habour dues –Statistics –Law enforcement Edition 3 Recommendations on the implementation of RIS services

11 RIS Key technologies and RIS Services

12 Information categories

13 Replacing

14 Revised guidelines Edition 2 Chapter on planning of a RIS  Responsibility  Liability  Planning proces  Training  Stepwise development of RIS Edition 3 Chapter on structured approach of the implementation of RIS services  Steps for a structured approach on the implementation of RIS  Legal considerations  Training

15 RIS layered implementationmodel

16 Thank you for your attention Questions?


Download ppt "Edition 3 of The PIANC RIS guidelines Cas Willems (Chairman PIANC WG 125),"

Similar presentations


Ads by Google