Presentation is loading. Please wait.

Presentation is loading. Please wait.

LED Street Lighting Project

Similar presentations


Presentation on theme: "LED Street Lighting Project"— Presentation transcript:

1 LED Street Lighting Project
City of Poughkeepsie LED Street Lighting Project

2 Attributes Evaluated For Each Manufacturer.
Cost L70/L90 or lumen deprecation (how fast the light loses its ability to produce light) Warranty Efficiency and Versatility of light and ability to distribute light. Ease of Install and operation Color Temperature and CRI (The lights ability to produce aesthetic light while maintaining efficiency and the ability to recognize colors under the light) Availability of parts for lights Dark sky compliant (no light directed at the sky. Wind resistance of new fixture and ability to remain on existing pole Weight of new equipment Fixture Style - Look of each light. (Does the light need to match existing, public input, etc.)

3 Current Status Run Energy Analysis based on billing and assumptions
Survey of Street Lights (see map) Take information from survey and enter into lighting simulation program Perform before and after analysis of lighting levels Compare proposed lighting simulation to before (correct deficiencies in light levels) Share results with the City City to review Take input from police department Take input from Public Wendel to show pilot of decorative fixtures Perform simulation based on input from city and decorative fixtures selected. Perform final energy savings and cost analysis Construction to begin Current Status

4 Phasing of Project Phase 1 To include all of the dark gray areas
Cobraheads and traffic lights will commence first. Decorative lights located in downtown and in neighbor hoods will be piloted first.

5 Phasing of Project Phase 2
The remaining Cobraheads on the utility poles will be retrofitted.

6 Decorative Light Comparison
City of Poughkeepsie LED project

7 Goals of the city Cost Effective Safety Initial Cost Vs. Lifetime Cost
Mitigate FERC Rate Increases To The Hudson Valley Efficiency Streamline Fleet Of Lights Minimize Number Of Different Lights GIS Integration Maintenance Increase Life From LED Pick Options That Have The Least Maintenance. Safety Increased Light Better Quality Light Reduce Glare Can Meet Or Exceed Current Light Output

8 Existing Decorative Lights
Post top -Lantern High Hat

9 Decorative Lights – Without Glass
Detas -Quincy Philips -Metroscape

10 Decorative Lights –With Glass
Philips - City Post Spring City Central Park

11 Decorative Light Comparison
Manufacturer Model Cost Color Temp Lumens/ Watt (Efficiency) DLC Listed (Needed for NYSERDA Rebate) Glass Sheild Rated Lifetime (hours) Up light Detas Quincy $ 4000K 85 No Optional** 90,000+ 0% Philips Metroscape 4000K * 86.5 Yes 100,000 + City Post 68.4 90,000 + 3% Spring City Central Park $$$ 3000K 32 ??? 50,000 * Can be built in 3000K ** All other inputs are not valid when the glass is added *** All Lights are dimmable with Control System.

12 Results of Public Poling
Fixtures with out vertical glass shields were voted down. Glass shields with frosted or ribbed glass were voted in. A majority of citizens approve of the city post by Philips as a suitable retrofit. Wendel will move forward with piloting this fixture in different color temperatures.


Download ppt "LED Street Lighting Project"

Similar presentations


Ads by Google