2 Contents 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. ADS-B General Plan and Implementation of CAAC release schedules

3 Preliminary Work Policy, Specification and Standards 2010,CAAC ATRO Published CAAC Surveillance Technology Implementation Policy (AC-115-TM-2010-01),Includes ADS-B Application Strategy. 2011,CAAC ATRO and ATMB Published ADS-B ATC Operation Specification (AC-93-TM-2011-01) 2012,CAAC ATRO finished ADS-B 1090MHz ES Ground Station(Receive) Technology Specification

4 2008,CAAC Flight Standards Department Published ADS-B Flight Operation(IB-FS-2008-002 ) 2010,CAAC Aircraft Airworthiness and Flight Standards Department Published Airworthiness and Operational Approval of ADS-B Application in non-radar areas via 1090MHz ES(AC-91- FS/AA-2010-14) Preliminary Work Policy, Specification and Standards

5 2010, CAAC Aircraft Airworthiness Published ADS-B and TIS-B Airborne Equipment Standards (CTSO-C166b) 2011, ATMB Began to Preparation of ADS-B Implementation Road Map. Preliminary Work Policy, Specification and Standards

6 Feb.2012 CAAC ATRO Authorize TEDC.CO.LTD ADS-B Ground Station Lisence Preliminary Work ADS-B Equipment Certification

7 Oct.2009 ATMB ChengDuJiuZhai Route Archive to ADS-B surveillance coverage, including 2 ADS-B Ground Station. Preliminary Work ADS-B Route Surveillance Verification

8 May, 2011, ChengDuLaSha Route ADS-B began Trail Operation including 6 Ground Station. Preliminary Work ADS-B Application and Trail Operation

9 July.2011,Z1 route archive to ADS-B aurveillance coverage, ATMB is in charge of ADS-B trail operation, CAACSRI responsble for the whole project build.The project includes six ADS-B ground station Preliminary Work ADS-B Route Surveillance Application

10 Aug.2011 ADS-B Application Seminar held in ChengDu CAAC decides on ADS-B data link: Transport Aviation: 1090MHz ES data link General Aviation:1090MHz ES data link Preliminary Work ADS-B Application Seminar

11 Contents 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. ADS-B General Plan and Implementation of CAAC release schedules

12 CAAC ADS-B Next Phase Work Preparation of CAAC ADS-B Overall Planning and implementation of program Standards, specifications and supporting polices of ADS-B application formulation and amendment. ADS-B application problem research, includes: ADS-B anti-spoof and jamming studying ADS-B signal mixed fruit studying Compass2 integrity impacts on ADS-B Data Fusion of ads-b and other surveillance source

13 Launch a series of ADS-B technology and function application verification projects, such as air-air surveillance application based on ADS-B IN function. includes Commercial and General Aviation ADS-B ground station TIS-B/FIS-B function application verification. ADS-B airborne equipment application verification based on GNSS(GPS + Compass2) CAAC ADS-B Next Phase Work

14 Contents 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. ADS-B General Plan and Implementation of CAAC release schedules

15 CAAC ADS-B Implement Office & Work Group Feb.2012,CAAC ADS-B implement office & workgroup established. The Organization includes members of unit: CAAC Flight Standards Department CAAC Aircraft Airworthiness CAAC Air Traffic Regulation Office (ATRO) CAAC Air Traffic Management Bureau (ATMB) The Second Research Institute of CAAC(CAACSRI)

16 ADS-B Implementation Task Division of CAAC department ATRO and CAACSRI responsible for preparation of ADS-B General Plan and implementation solution of CAAC CAAC Flight Standards Department responsible for formulating airborne equipment updating plan and flight crew training CAAC Aircraft Airworthiness and Flight Standards Department responsible for ADS-B airborne equipment airworthiness certification

17 ATRO responsible for the promulgation of the ADS-B ground station standard and ADS-B ground station equipment certification ATMB excutes CAAC ADS-B implement program and responsible for preparation of the specification of ATC operation, equipment operation and staff training. Task Division of CAAC department in ADS-B implement

18 May.2012 Complement the draft of ADS-B General Plan and Implementation Solution of CAAC. June.2012 Submit to the ADS-B Implement office the comments edition of ADS-B General Plan and Implementation Solution of CAAC. July.2012 CAAC authority release official version. Release Schedules