1. ◦ Public hearing certifying compliance with Govt. Code 4217.10 for energy projects. From proforma:  Estimated total project cost is $4.09M. Estimated.

Similar presentations


Presentation on theme: "1. ◦ Public hearing certifying compliance with Govt. Code 4217.10 for energy projects. From proforma:  Estimated total project cost is $4.09M. Estimated."— Presentation transcript:

1 1

2 ◦ Public hearing certifying compliance with Govt. Code 4217.10 for energy projects. From proforma:  Estimated total project cost is $4.09M. Estimated first year energy savings $274K. Estimated lifetime energy savings $12.14M. $11.6M net savings to District.  Environmental benefits annually:  Eliminate 22.4M kg of nitrous oxides (NOx)  Eliminate 12.6M kg of sulfurous oxides (SOx)  Eliminate 0.84M kg of other particulates  Eliminate 1.4 tons of carbon dioxide (CO2)  Also bank Renewable Energy Credits (REC’s) with an estimated value of $165K. 2

3 3


Download ppt "1. ◦ Public hearing certifying compliance with Govt. Code 4217.10 for energy projects. From proforma:  Estimated total project cost is $4.09M. Estimated."