Facility: 8 Buildings: Administration, Cargo, NII (2), Export Control, Maintenance Garage, Veterinary Services, POV Secondary Inspection Tenants: CBP,

Similar presentations


Presentation on theme: "Facility: 8 Buildings: Administration, Cargo, NII (2), Export Control, Maintenance Garage, Veterinary Services, POV Secondary Inspection Tenants: CBP,"— Presentation transcript:

1

2 Facility: 8 Buildings: Administration, Cargo, NII (2), Export Control, Maintenance Garage, Veterinary Services, POV Secondary Inspection Tenants: CBP, ICE, FDA, USDA, GSA, Brokers Gross Area: 98,300 SF Site Area: 35 Acres Rock Removal: +/-100,000CY LEED: Silver (Goal of Gold) Cost: $120M to $140M Schedule: Design: 2008 - 2009 Construction: 2010 - 2013 Introduction Land Port of Entry, Alexandria Bay, New York

3 Project Team GSA BIM Champions: Robert Granato Ilana Hellmann PM: Tom King COR: Karin Reed CO: Patricia Wright Architect: Morphosis CM: Gilbane Building Company

4 Project Challenges Maintain Port Operations Interstate Coordination Environment Rock

5 Preliminary Concepts

6 Concept 1

7

8 BIM Scope Development OCA Minimum Requirement: Spatial Validation Scope Templates Discussions with A/E Typically uses 4D Modeling extensively in construction coordination Clash Detection: Goal of zero clashes

9 BIM Scope A/E Space Validation * Energy Modeling * Rock Quantities * Daylight Modeling 4D Circulation & Phasing Models 3D Models Conflict Reports CM Rock Quantities Schedule Information * Submitted for Preliminary Concepts

10 Space Validation

11

12

13

14

15 Energy Modeling

16

17 A/E Analysis CM Analysis Rock Quantities