1Name of The Project Flamingo Free Port 2Location of the Project Red Sea Coast. Port Sudan. 3Brief Description Mega Free port With 18 Meter Depths. 4 Project.

Similar presentations


Presentation on theme: "1Name of The Project Flamingo Free Port 2Location of the Project Red Sea Coast. Port Sudan. 3Brief Description Mega Free port With 18 Meter Depths. 4 Project."— Presentation transcript:

1 1Name of The Project Flamingo Free Port 2Location of the Project Red Sea Coast. Port Sudan. 3Brief Description Mega Free port With 18 Meter Depths. 4 Project Objectives Project to accommodate the 3 rd and 4 th vessels Generations. 5DurationThe duration to implement the project is about four years.

2 6Type of Fund B. O.T 7Estimated Cost 450 Million $ 8Project Status All licenses and permits are available. 9Availabilit y of Study Pre-feasibility study is Available 10Date of Study April 2010

3 1 Name of The Project Flamingo Dry Dock & Shipyard Project 2 Location of the Project Red Sea Coast 5 Km Northern PortSudan. With in the existed Flaming Port Facilities. 3 Brief Descriptio n The project is designed to give maintenance Services for the Vessels crossing the Red Sea Areas, and in addition to Shipyard to Build vessels. 4 Project Objectives Create new Services which is not available in Sudan before 5 Duration The duration to implement the project is about one year. 1Name of The Project Flamingo Shipyard 2Location of the Project Red Sea Coast Portsudan. 3Brief Description The project is designed to provide repairing and building Services For the Vessels crossing the Red Sea routes, 4 Project Objectives Create new Services which is not available in Sudan before 5Duration Two years.

4 6 Type of Fund Direct Finance 7 Estimated Cost 119 Million $ 8 Project Status All licenses and permits are available. Also Designs 9 Availability of Study Available 10 Date of Study April 2010 6Type of Fund -Finance 7Estimated Cost 120 Million $ 8Project Status All licenses, permits and designs are available 9Availabilit y of Study Pre-feasibility Available 10Date of Study April 2010