Mighty River Power’s Geothermal R&D Programme

Similar presentations


Presentation on theme: "Mighty River Power’s Geothermal R&D Programme"— Presentation transcript:

1 Mighty River Power’s Geothermal R&D Programme
Joe Gamman Geothermal R&D Manager Mighty River Power 4th Dec 2008 OERC Symposium University of Otago

2 Mighty River Power Generator (22% of NZ’s energy) 1000 MW hydro
170 MW Nat Gas Cogeneration Plant 270 MW Geothermal NP: 132 MW on-line early 2010 NT: 500 MW Geothermal by 2012

3 Geothermal Systems >200°C <200°C

4 Steam Turbine Power Plant

5

6

7

8 Geothermal Exploration
Gas & fluid geochemistry & resistivity are the major tools Geochemistry provides temperature constraints Geophysics addresses permeability Geology, alteration, & structure establish context Drilling targets based upon conceptual model Drilling is expensive ($8-10M per well) and high risk! ~ 1 in 5 exploration wells are successful

9

10

11 Reservoir Models and Management
Key tools in understanding reservoir processes are pressure, temperature & chemistry monitoring Levelling – Subsidence Gravity – mass change Seismicity – injectate tracking

12

13 Geothermal Drilling Typically drill to 2500-3000m 45-60 days duration
$8-10M per well Can drill multiple deviated wells from a single location

14

15

16 Geothermal R&D Objectives
Strategic Research Areas Graduate Support Sustained Value from Innovation Enhance NZ’s Geothermal Reputation

17 Strategic Research Areas
Still under discussion but may include topics such as: Advanced Materials Geothermal brines are extremely corrosive – we’re outside the standard parameters Understanding the Reservoir Better steamfield management and predictability Targeted Drilling Programme Exploration and well targeting through smarter MT and Seismic Understanding Scale Formation Molecular control of silica/calcite/x-oxide behaviour

18 Process Identify, Incentivise and Collaborate with the best researchers Create a valuable Point Of Difference over 3/5/10 y timeframe Proposals are received and evaluated continuously Business Case prepared by MRP, evaluated and communicated back to the researcher R&D Stakeholder Management Encourage campus-wide collaboration to rationalise stakeholder management ie, OERC