1 Republic of Kosovo MINISTRY OF ENVIRONMENT AND SPATIAL PLANNING Kosovo Environmental Protection Agency Water, Energy and Climate Change Developments, Environment Challenges & Perspective Kosovo Experiences Afrim Berisha & Rifat Morina Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

2 Central Institutions Ministry of Environment and Spatial Planning Environment & Climate Change Water quality, water use & water management Ministry of Economical Development Energy & Energy resources Renewable energy & Energy efficiency Energy Regulatory Office Energy market, tariffs, permits. Ministry of Agriculture, Rural Development and Forestry Climate change on Forestry & Agriculture. Irrigation & Water use in Agriculture Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

3 Legal basis Water Law on Water Climate Change Law on Environment Protection Law on Air Protection from Pollution Energy Law on Energy Law on Electricity Law on Energy Efficiency Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

4 Strategic Documents Climate Change Strategy for Environment and Sustainable Development , (Reviewed 2012) Climate Strategy in the Forestry Sector- Draft Air Protection from Pollution Strategy- Draft Waste Management Strategy- Draft Water The National Water Management Strategy, The initial phase (IPA Project). Energy Energy Strategy Heating Strategy Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

5 Positive Developments Preliminary Report on National GHG inventory ( ), finished. Research projects, and studies related to the renewable energy (hydro power energy), ongoing. Small projects on hydropower plants/ The implementation phase. The National Climate Change Strategy/ The initial phase. Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

6 Kosovo dont have any specific activity focused to FLIS. ( There are some activities, initiatives and projects which are linked with this topic). Example: Sustainable Energy Options for Kosovo An analysis of resource availability and cost (University of California 2012) Water Security for Central Kosovo o A study of Water resources, water demands, water balance assessment, and programme of measures (World Bank 2012). Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

7 Key emission categories Emission from energy sector Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

8 Overview of amounts of primary energy sources available through the period Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

9 (Source: Annual Energy Balance 2012) Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana Only ~2.5% of total electricity production is from HPP

10 Name of HPPCapacity [MW] Produc tion GWh Water flow m3/sec River Kuqishta Peja Drelaj Shtupeq Bellajë Deçani Lloçan Lloçani Mali Erenik Jasiq Dragash Plavë Orçush Reçan Prizreni Brezovicë Lepenc Lepenci Banjska Banjska Batare Bistrica Majanc Kaçandoll Mirusha Drini & Deçani Total Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana HPP ZhurCapacity [MW]Production GWh Zhur 12x Zhur Total Spatial Distribution of Proposed HPP

11 Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana ~19% of total electricity production

12 New capacities of Thermal Power Plants are planed, How to make sure, these new capacities are within given standards? Old capacities of Thermal Power Plants are in function, To be restored or closed off!! Current energy production HPP based is very low, How to improve this? Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

13 Internal factors: Private investments & Civil society influences External factors: EU commitments, EU Directives, Access to EU funds. Regional and International trends. Regional cooperation. Workshop Future Water Use and the Challenges of Hydropower Development in Western Balkan Ljubljana

14 The winner picture in the children competition Kosovo without thermal power plants