Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update.

Similar presentations


Presentation on theme: "1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update."— Presentation transcript:

1 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

2 2 SETIS _STEERING GROUP _27102011_Mapping 2 Aim of Project Mapping The Mapping of projects relevant to the SET-Plan was mandated by the Steering Group in October 2010 to: Prioritise future efforts Leverage on-going developments and knowledge at EU level Facilitate joint programming

3 3 SETIS _STEERING GROUP _27102011_Mapping 3 Current state 25 th October –Updated up to 25 th October 2625785 M –Total questionnaires received: 262, budget: 5785 M –Geographical coverage: 18 EU MSs + NO, IS and CH –Increasing engagement: First submissions from FR and NL DE submission Forschungsjahrbuch Erneuerbare Energien 2010, but information does not contain all questionnaire fields DK contributed a large number (62) of (smaller) projects –Analysis is ongoing The filled in questionnaires are now online: http://setis.ec.europa.eu/activities/project-mapping

4 4 SETIS _STEERING GROUP _27102011_Mapping 4 Number of projects received per EII - total: 262

5 5 SETIS _STEERING GROUP _27102011_Mapping 5 Budget of projects received per EII – total: 5785 M

6 6 SETIS _STEERING GROUP _27102011_Mapping 6 Number of projects per country total: 262 projects

7 7 SETIS _STEERING GROUP _27102011_Mapping 7 Budget per country total: 5785 M

8 8 SETIS _STEERING GROUP _27102011_Mapping 8 SET-Plan Project Mapping Responses – Wind (excl. FP6/7 projects) CountryNumber of projects Budgets (MEuro) BE82838.7 DK4467.1 EL13.0 ES5146.6 FI351.2 IT16.5 NO230.9 PT220.1 SE1412.2 SK11.1 UK15.8 TOTAL823183.2 1 project (Slovakia) is combined wind, solar & bioenergy. 2 projects (Greece & Portugal) are combined wind, solar & grids. The total budgets of these projects are equality divided among the technologies engaged. 26 out of the 44 Danish projects & 9 out of the 14 Swedish projects are with the budget below the threshold (1M) Total budgets in wind is not changed significantly due to the small contribution of the new projects.

9 9 SETIS _STEERING GROUP _27102011_Mapping 9 Wind projects: Split per EII –IP activity EII activityBEDEDKESFIFRITNOPTSESKUKTtl 1.1 New WT, materials, components2220363121150 1.2 Testing facilities3412111 1.3 Mass production 12 1 4 2.1 Offshore - new structures 123 21 9 2.3 Tech from O&G 1 1 2 3.1 Grid – HVDC 1 1 2 3.2 System dynamics1 2 1 1 5 3.3.1 Balancing 21 3 3.3.2 Market integration 2 12 5 4.1 Wind resources1 1211 11 17 4.2 Spatial planning 1 1 2 4.3 Public acceptance 1 1 2 Total74451310131111511112

10 10 SETIS _STEERING GROUP _27102011_Mapping 10 SET-Plan Project Mapping Responses – Bioenergy (excl. FP6/7 projects) CountryNumber of projects Budgets (MEuro) BE214.4 ES1165.0 IT1416.0 NO10.6 PL234.7 SK722.4 UK4304.9 TOTAL41458.0 4 projects (Spain) are combined bioenergy & CCS. 1 project (Norway) is combined bioenergy & FCH 2. 2 projects (Slovakia) are combined bioenergy & solar. 1 project (Slovakia) is combined bioenergy, solar & wind. The total budgets of these projects are equality divided among the technologies engaged.

11 11 SETIS _STEERING GROUP _27102011_Mapping 11 Bioenergy Project Mapping: Split per EII IP activity The classification presented here has been slightly changed & adapted from the implementation plan, which only involves activities in demonstration and flagship plants. The total adds up to more than the total number of projects (41), because several projects are related to multiple activities in the implementation plan, hence these projects are counted more than once.

12 12 SETIS _STEERING GROUP _27102011_Mapping 12 SET-Plan Project Mapping Responses – CCS (excl. FP6/7 projects) CountryNumber of projects Budgets (MEuro) CH14.2 CZ12.0 DE6110.0 ES632.3 FI120.0 IT1na PL14.2 PT10.4 UK1058.2 TOTAL27231.0 4 projects (Spain) are combined CCS & bioenergy. 50% of their total budgets is allocated to CCS 1 project (Finland) deals with the whole CO2 chain (capture/transport/storage)

13 13 SETIS _STEERING GROUP _27102011_Mapping 13 CCS Project Mapping: Split per EII IP activity *The total adds up to more than the total number of projects (27), because several projects are related to multiple activities in the implementation plan, hence these projects are counted more than once.

14 14 SETIS _STEERING GROUP _27102011_Mapping 14 SET-Plan Project Mapping Responses – FCH 2 (excl. FP6/7 projects) CountryNumber of projects Budgets (MEuro) AT14.8 BE114.1 CH15.0 DK1776.2 EE11.2 FI9165.1 IS13.0 IT12.0 NO35.6 PT10.5 RO215.2 TOTAL38292.7 * 1 projects (Norway) is combined FCH 2 & bioenergy. 50% of its total budget is allocated to FCH 2.

15 15 SETIS _STEERING GROUP _27102011_Mapping 15 SET-Plan Project Mapping Responses – Solar (excl. FP6/7 projects) CountryNumber of projects Budgets (MEuro) BE728.2 EL13.0 ES17.5 PT493.0 SK411.5 TOTAL17143.2 2 projects (Slovakia) are combined solar & bioenergy. 1 project (Belgium) is combined solar & grids. 1 project (Slovakia) is combined solar, bioenergy & wind. 2 projects (Greece & Portugal) are combined solar, wind & grids. The total budgets of these projects are equality divided among the technologies engaged. We have now info on ~ 40 projects from DE

16 16 SETIS _STEERING GROUP _27102011_Mapping 16 Solar Project Mapping: Split per EII IP activity

17 17 SETIS _STEERING GROUP _27102011_Mapping 17 SET-Plan Project Mapping Responses – Grids (excl. FP6/7 projects) CountryNumber of projects Budgets (MEuro) BE342.3 CZ218.8 EL13.0 ES542.1 IT293.5 PT111.0 SK27.8 TOTAL16221.6 2 projects (EL + PT) are combined Wind-Solar-Grids. 33% of each budget is allocated to Grids. 1 project (BE) is combined Wind-Grids. 50% of the budget is allocated to Grids.

18 18 SETIS _STEERING GROUP _27102011_Mapping 18 Number of Grid projects split per activity and country (1)

19 19 SETIS _STEERING GROUP _27102011_Mapping 19 Number of Grid projects split per activity and per country (2)

20 20 SETIS _STEERING GROUP _27102011_Mapping 20 Ongoing efforts in EGII projects mapping Distribution projects (AIT-Austria Institute of Technology) Collection of information on national Distribution projects (240) Transmission projects (ENTSOE) Collection of information on Transmission projects (40) JRC Smart Grid Pilot Projects Catalogue: Collection of information on Smart Grid pilot projects (260) Projects mapped according to Smart Grid functionalities (EPRI methodology)

21 21 SETIS _STEERING GROUP _27102011_Mapping 21 SET-Plan Project Mapping Responses – Nuclear (excl. FP6/7 projects*) CountryNumber of projects Allocated Budgets (MEuro) BE*160.0 CZ1na FR*1650.0 IT28.8 SE15.0 TOTAL6723.8 * MYRRHA (FR) and ASTRID (BE) projects have been included since FP7 contribution is minor ** SUSEN project has been approved by national government, but approval by EC is pending

22 22 SETIS _STEERING GROUP _27102011_Mapping 22 ESNII Project Mapping: Split per ESNII IP activity *The total adds up to more than the total number of projects (8), because several projects are related to multiple activities in the implementation plan, hence these projects are counted more than once.

23 23 SETIS _STEERING GROUP _27102011_Mapping 23 Mapping of SET-Plan Projects The way forward

24 24 SETIS _STEERING GROUP _27102011_Mapping 24 Formalisation of the role of actors SETIS Sherpas distribute questionnaire National POs EC POs data/ information input SETIS data/ information, analysis Sherpas, SG EII Teams

25 25 SETIS _STEERING GROUP _27102011_Mapping 25 Rationale: A simplified questionnaire was requested by the Steering Group in the last meeting Better identify synergies & gaps between the EIIs Implementation Plans & National projects Extract information in a more efficient way Simplify input and reduce workload of reporting actors Facilitate analysis for purpose by SETIS Development of a new questionnaire

26 26 SETIS _STEERING GROUP _27102011_Mapping 26 Online (SETIS website) implementation : Registration system with username and password Multiple choices possible Tick-off related priority activities and KPIs in the relevant EII implementation plans (via drop-down menus) User can extract information from the project database Registered users receive alerts when new projects added Available by end November 2011 New questionnaire/tool


Download ppt "1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update."

Similar presentations


Ads by Google