Presentation is loading. Please wait.

Presentation is loading. Please wait.

Office of the Federal Coordinator for Meteorology WORKING GROUP FOR WEATHER INFORMATION FOR SURFACE TRANSPORTATION (WG/WIST) Meeting 05-06 Office of the.

Similar presentations


Presentation on theme: "Office of the Federal Coordinator for Meteorology WORKING GROUP FOR WEATHER INFORMATION FOR SURFACE TRANSPORTATION (WG/WIST) Meeting 05-06 Office of the."— Presentation transcript:

1 Office of the Federal Coordinator for Meteorology WORKING GROUP FOR WEATHER INFORMATION FOR SURFACE TRANSPORTATION (WG/WIST) Meeting 05-06 Office of the Federal Coordinator for Meteorological Services and Supporting Research December 1, 2005

2 Office of the Federal Coordinator for Meteorology 2 Recording In Progress NOTE: Audio recording in progress to assist with capturing Record of Actions.

3 Office of the Federal Coordinator for Meteorology 3 Please sign-in on roster Life Support: Coffee, Tea, Sodas, Snacks, etc. Emergency Exits * Phones: * –Incoming messages: 301- 427- 2002 –Incoming faxes: 301- 427- 2007 –Dial 9 for commercial, 4 for DSN on DSN line Restrooms: Grab a key at the front desk* Parking Validation Administrative Info * slide follows

4 Office of the Federal Coordinator for Meteorology 4 Elevators MEN WOMEN Toilet Kit Copier Fax DFC USN USAF FAA FC Emergency Exit WG Meeting room

5 Office of the Federal Coordinator for Meteorology 5 Phones Elevators MEN WOMEN Toilet Kit Copier Fax DFC USN USAF FAA FC WG Meeting room

6 Office of the Federal Coordinator for Meteorology 6 Elevators MEN WOMEN Toilet Kit Copier Fax DFC USAF FAA FC Restrooms USN WG Meeting room

7 Office of the Federal Coordinator for Meteorology 7 OPENING REMARKS (10 minutes---8:30 – 8:40 AM) RECORD OF ACTIONS (5 minutes---8:40 - 8:45 AM) MEETING DISCUSSION TOPICS: A. DETERMINE THE FEDERAL R&D NEEDS THAT WOULD BE THE FOCUS OF THE WIST R&D PLAN (Action Item 2005-1.3). (60 minutes-- 8:45 – 9:45 AM) BREAK 15 minutes---9:45 - 10:00 AM B. USING PREVIOUSLY PUBLISHED R&D NEEDS LISTS AS A GUIDE, DETERMINE A PRELIMINARY STRUCTURE FOR THE WG/WIST R&D PLAN TO CLEARLY EXPRESS THE R&D PRIORITIES OF THE WIST COMMUNITY (Action Item 2005-1.3). (60 minutes---10:00 AM - 11:00 AM) C. AGENCY INPUTS, FOLLOW UP ON WIST INITIATIVE PAPER EFFORTS, AND NEW ITEMS. (60 minutes---11:00 AM – 12:00 PM) LUNCH12:00 – 1:15 PM D. DISCUSS HOLDING A SERIES OF WIST-RELATED MINI- WORKSHOPS IN EARLY 2006 (60 MINUTES---1:15 – 2:15 PM) REVIEW OF ACTION ITEMS (15 minutes---2:15 - 2:30 PM) NEXT MEETING (15 minutes---2:30 - 2:45 PM) ADJOURN Tentative Agenda

8 Office of the Federal Coordinator for Meteorology 8 ACTION ITEM 2005-1.3: The Executive Secretary will provide a synthesized R&D needs list so that WG members could review them and begin to determine the R&D needs that would the focus of the WIST R&D Plan and start to build a structure for the R&D Plan to clearly express the priorities of the WIST community. July 11th update: The WG/WIST made minor edits to the R&D Needs matrix and the group then decided to accept the matrix as its first structure for arranging the WIST R&D Needs. Additionally, a first draft of the master R&D Needs listing was handed out for review. September 15th update: Part A - Certain WG members provide their sectors’ fatalities, injuries, and property damage figures so they can be consolidated and finalized before beginning work to align surface transportation R&D priorities based on these figures. Part B - Each WG member will provide the Executive Secretary their top 5 items for each row of the matrix by November 21, 2005, so they can be consolidated for the November 30th meeting. Part C - Each WG member will provide the Executive Secretary any additional WIST reference sources by the next meeting. Review of Action Items


Download ppt "Office of the Federal Coordinator for Meteorology WORKING GROUP FOR WEATHER INFORMATION FOR SURFACE TRANSPORTATION (WG/WIST) Meeting 05-06 Office of the."

Similar presentations


Ads by Google