1

2 Consultancy by : Power Grid Corporation of India Ltd

3 POWERGRID AT A GLANCE Central Transmission Utility of India & Operator of RLDCs. (TSO) One of the largest transmission utility in the world Operating –47,500 ckms of EHV transmission lines –82 EHVAC & HVDC sub-stations –46,500 MVA transformation capacity Emerged as leading consultancy Organisation in Power Sector Catalytic Role in Power Sector Reforms Diversified in Telecom, APDRP, Rural Electrification

4 POWERGRID FUNCTIONS TSO RLDCs CTU FUNCTIONS Inter-state Transmission Services P O W E R G R I D LICENSEES NON-CTU FUNCTIONS Telecom, Consultancy, Distribution

5 Consultancy by POWERGRID Rendering consultancy services to utilities like GEB, MPSEB, Goa, CSEB, D&D, DNH, Tata Power, BSES,WBPDCL, UPPCL, UPCL,BSEB, RRVPNL, KPTCL,GRIDCO, Malana Power, Chandigarh, ASEB, Pondicherry, MeSEB, Afghanistan, Bhutan Telecom, THPA, MOP. Areas of Consultancy –Transmission Lines/Sub-stations –SCADA/EMS –O&M of EHV Transmission System –APDRP,REC –Telecom –Intra-State ABT & Metering Consultancy for project cost of about Rs. 5000 Crores.

6 POWERGRID ’ s Expertise Construction and O&M of EHV Transmission System Grid Management SCADA/EMS ABT Metering Telecom

7 Development of ABT Mechanism On site administrator for the Tariff Study in Feb.,94 by International Consultant M/s ECC Inc., USA Co-ordinated the study and mooted the idea of frequency linked tariff to ECC Basic frame work developed Lead role in RTFs/ NTF deliberations ABT is a commercial mechanism linked to frequency specially designed for Indian Grid condition CERC hearings with utilities Clarifications on issues CERC issued Order on 04.01.2000

8 ABT implementation – POWERGRID ’ s Expertise More than 150 presentations to –SEBs –Generators –Central / State Government –Other Utilities In-house development of software for –Scheduling –Energy Accounting –Time tested and proven software Legal issues resolved

9 POWERGRID ’ S Expertise in ABT Only Utility having proven capability in –Development of ABT –Implementation of ABT –Actual Operating experience Pioneers and leaders in ABT mechanism Expertise to train the personnel Experience in development and implementation of –Scheduling Procedure –Energy Accounting Development of Special Energy Meters Development of Metering Scheme Experience in Operation of Pool Accounts for UI and reactive Charges

10 Development of Energy Meters by POWERGRID Foreseen the requirement of a New Meter for ABT Tailor made meter specifications for ABT tariff Prototype development followed by field trials Vendor Development Main features of SEMs –Tamper proof and low cost –Developed and manufactured indigenously –Accuracy of class 0.2 –Static Meters to record energy transmittals in 15 min. time block –Reactive power measurement in pre-specified voltage conditions Establishment of Data Collection and Data transfer infrastructure

11 WR took lead for ABT implementation 01.01.2003 Other Regions followed 01.07.2002 01.04.2003 01.11.2003 01.12.2002 ABT implemented in All Five Regions. POWERGRID co-ordinated and provided all infrastructure for ABT implementation. Pool Accounts Operated by RLDCs.

12 Experience in intra-State ABT implementation Relying on our expertise, consultancy for intra-State ABT awarded by GEB. Consultancy being awarded by PSEB shortly Other States are approaching for consultancy

13 Expertise in Operation of Pool Account RLDCs have collected and disbursed –UI Pool account : Rs. 4500 Crores –Reactive Pool Account : Rs. 53 Crores No discrepancies, disputes raised Amount disbursed within 3 days e-banking facilities available

14 Similarities between ABT at Regional Level and intra-State level Regional ABT Regulator- CERC Central Sector Generators IPPs SEBs SEMs Day Ahead Scheduling by RLDCs Weekly Settlement of regional UI Pool Account Reactive Pool A/c Intra-State ABT Regulator- SERC State Sector Generators embedded generators Discoms SEMs Day Ahead Scheduling by SLDCs Weekly Settlement of State UI UI Pool Account Reactive Pool A/c

15 WORK PLAN TIME SCHEDULE Sl. No.Item \ Week  1st2nd3rd4th5th6 th 1Kick off Meeting 2Furnishing of preliminary data by MSEB 3Report Drafting 4.Submission of draft Report 5.Discussion on Draft Report 6.Preparation of Final Report 7.Submission of Final Report

16 Work Plan Providing Alternatives on Issues – Discussion of Rationale- Choosing best Options for Maharashtra Discussions & Presentations To State Utilities Kick-off Meeting Write-ups and Comments Study of Experiences at inter- Regional level Preliminary Data By MSEB Review of existIng commercial arrangements among Utilities Embedded generators etc.

17 Work Plan ……..contd. Preparation of Draft Report Discussions & Presentations To State Utilities Comments from State Utilities Submission of Final Report

18 ABT Balancing Market UI mechanism takes care of the deviations in an inherent way Price based on frequency reflecting load generation balance in the grid No negotiations, no bidding. Flexible-anybody can inject or draw. ISO purchases balancing power and despatches Price of balancing power based on bids which reflect notional market conditions Requires Exchanges, complicated procedure and involves cost in setting up of computerised systems

19 Inadvertent exch- anges priced based on frequency & price is known to all No gaming UI Pool allows frequency variation between 49.0 and 50.5 Hz. Complex mechanism for pricing inadvertent exchanges Gaming is possible Suitable in systems where frequency has to be maintained close to nominal ABT Balancing Market

20 NORTHERN REGION SOUTHERN REGION EASTERN REGION NORTH EASTERN REGION OPERATIONAL TO BE COMMISSIONED BY JUNE 2005 SCADA/EMS System -ULDC NLDC TO BE COMMISSIONED BY DEC 2007 WESTERN REGION TO BE COMMISSIONED BY MARCH 2006 EXISTING MSEB SLDC – KALWA TO BE INTEGRATED WITH RSCC,MAROL USING ICCP UNDER WR ULDC

21  Establishment of large sized ULDC projects worth Rs.2200 Crores  Multi-vendor RTU integration  Usages of variety of communication mediums  Type testing, FAT/SAT  Establishing system for remote operation of EHV s/s  Separate engineering department POWERGRID EXPERTISE IN SCADA

22  Continuous association with leading consultants : KEMA-ECC INC, KEMA-Macro, IVO – Finland, EDF –France  Signed MOU with KEMA ECC INC,USA Establishment of large sized ULDC projects  Complete project life cycle experience  Preparation of Feasibility report  Preparation of tender specifications  Tender evaluation and award  Design & Engineering, testing & commissioning POWERGRID EXPERTISE IN SCADA

23 NEED OF SCADA FOR ABT  To monitor & control the load & generation in real time  Special energy meters provide energy & average frequency for every 15 minutes time block  Data of energy meters is generally downloaded weekly  SCADA system for energy meters telemetry

24  Power flows in real time  Monitor schedule & actual drawals  Provides information on generation  Reactive power management using capacitor / reactors.  Management of voltage by transformer tap adjustment SCADA APPLICATIONS

25 1015 Nos. RTU SUB LDC SLDC ERLDC WRLDCNRLDCSRLDCNERLDC NLDC 29 Nos. 51 Nos. Unified Grid Operation 5 Nos. National Level Regional Level State HQ Level Group / Distt Level Plant / Sub- Station Level

26 POWERGRID AND ABT Pioneers of ABT Synonymous to each other Only Utility with time proven track record Capabilities in all associated systems Expertise recognised internationally Aware of the needs /areas of the power utilities in the country MSEB would be in experienced hands

27 Observations of FERC –“ Very impressive Load Dispatch Centre. First of its kind in the world. Quite sophisticated with data and technology in real time. You Should be proud.”” Linda k. Breathitt, Commissioner, FERC, Washington DC.

28 Observations of World Bank –“ The new tariff regime has provided significant benefits to the states, Generators and the consumers. It has helped in implementing grid discipline and its optimal and safe operation. ” –“ POWERGRID has achieved a unique landmark in Northern and Southern Regions, having three hierarchical levels as against two levels being implemented worldwide. ”