Presentation is loading. Please wait.

Presentation is loading. Please wait.

ISCC Report Spring Refining Meeting 2007 Seattle, Washington.

Similar presentations


Presentation on theme: "ISCC Report Spring Refining Meeting 2007 Seattle, Washington."— Presentation transcript:

1 ISCC Report Spring Refining Meeting 2007 Seattle, Washington

2 Accomplishments Since Fall Refining Meeting 2006 Process Guide Completed and adopted by CRE and ISO TC67 SC6 API 610/ISO 13709, Centrifugal Pumps Submitted for DIS2 Ballot API 671/ISO 10441, Special Purpose Couplings passed FDIS Ballot and will be published as an identical adopt back in June API 619/ISO, Rotary Positive Displacement Compressors, FDIS Ballot launched April 12, 2007 API 682/ISO 21049 TF/WG working since November 2006 API 660/ISO 13706, Shell and Tube Heat Exchangers passed FDIS Ballot and will be published in July API 663, Multitube Hairpin Heat Exchangers, NWIP approved in November 2006 API 537/ISO 25457, Flare Details in DIS Ballot process API 560/ISO 13705, Fired Heaters to be published April 2007 API 530/ISO 13704, Calculation of Heater Tube thickness submitted for FDIS Ballot.

3 Issues API 618/ISO 13707 has disappeared into the void—unable to contact project leader for status API 674/ISO 13710 adoptback snagged by unavailability of API draft API 530/ISO 13704 is submitted for FDIS but Final Stress Curves not available until fall 2007—possibly leading to standards not being identical

4 Opportunities Convenor of ISO 10439, Centrifugal Compressors has retired—API might secure convenorship API 670, Machinery Protection Systems may activate this year—could be included in Iso-ization Program


Download ppt "ISCC Report Spring Refining Meeting 2007 Seattle, Washington."

Similar presentations


Ads by Google